ML20235U998
| ML20235U998 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 10/01/1987 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20235V000 | List: |
| References | |
| NUDOCS 8710140377 | |
| Download: ML20235U998 (2) | |
See also: IR 05000324/1987032
Text
l
6lfu M
,
.
. r.
OCT 011987
. Docket Nos. 50-325, 50-324
C olina Power and Light Company
iTTN: Mr. E. E. Utley
h
Senior Executive Vice President
,
Power Supply and Engineering
(
and Construction
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
1
SUBJECT:
NRC INSPECTION REPORT N05. 50-325/87-33 AND 50-324/87-32
This' refers to the Nuclear Regulatory Conrnission (NRC) inspection conducted by
Dr. W. B. Gloersen on September 14-18, 1987.
The inspection included a review
of activities authorized for your Brunswick facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection e re identified in the report.
Within
these areas, the inspection consisted rf selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
However, we direct your attention to the NRC concerns relative to the apparent
lack of manageraent attention to the inoperability of gaseous effluent
monitoring instrumentation.
As discussed with licensee representatives, two
gaseous effluent monitoring systems have been inoperable for several years. A
licensee representative made an oral commitment (Paragraph 8 of the report)
that the flow rate measurement devices would be made operable during the next
refueling outages, January-April 1988 - Unit 2 and 1988/1989 - Unit 1.
If
your understanding of this commitment differs from the report statements,
please inform this office promptly.
Consequently, we request that management
attention be directed to the improvement of the effluent monitoring
instrumentation rnaintenance program.
Ir; accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Docunent Room,
$&
c
I
\\
"
_.
.
.
I
.
_ _ _ _ .
- - _
. - .
r
,
,
Carolina Power and Light Company
2
i
l
Should you have any questions concerning this letter, please contact us.
!
Sincerely,
!
<
l
J. Nelson Grace
.
Regional Administrator
Enclosure:
!
'
Inspection Report
I
cf w/ encl:
l
t#. W. Howe, Vice President
/ Brunswick Nuclear Project
j
VC. R. Dietz, Plant General Manager
'
b
w/ encl:
C Resident Inspector
Document Control Desk
State of North Carolina
,
8
i
1
-
4
gmWG1ersen
J
1e
DCollins Pfr rickson
9/J9/87
9/07/87
9/p /87
9/jo/87
g
\\0h
- - - -