Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235W474 + (08:44:16, 3 December 2024)
- ML20235W471 + (08:44:20, 3 December 2024)
- IR 05000213/1987026 + (08:44:21, 3 December 2024)
- ML20235W466 + (08:44:21, 3 December 2024)
- ML20235W455 + (08:44:28, 3 December 2024)
- ML20235W459 + (08:44:28, 3 December 2024)
- ML20235W454 + (08:44:29, 3 December 2024)
- ML20235W450 + (08:44:30, 3 December 2024)
- ML20235W447 + (08:44:31, 3 December 2024)
- PY-CEI-NRR-0980, Forwards LERs 89-004-00 & 88-001-01 + (08:44:32, 3 December 2024)
- ML20235W441 + (08:44:32, 3 December 2024)
- 05000352/LER-1987-029, :on 870616,various Nuclear Steam Supply Shutoff Sys Isolations Occurred.Caused by Incomplete Review of Implementation Method of Mod to Assess Potential Impact on Facility Operations.Review Underway + (08:44:34, 3 December 2024)
- ML20235W438 + (08:44:34, 3 December 2024)
- ML20235W437 + (08:44:35, 3 December 2024)
- IR 05000313/1987018 + (08:44:37, 3 December 2024)
- ML20235W432 + (08:44:38, 3 December 2024)
- ML20235W425 + (08:44:39, 3 December 2024)
- PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted + (08:44:39, 3 December 2024)
- 05000317/LER-1987-013, :on 870911,reactor Automatically Tripped.Caused by Loose Connection in Breaker Which Controls Pump Starts. Reactor Coolant Pump (RCP) Surge Capacitators Replaced W/ Inductors Located at RCP Breaker Switchgear + (08:44:41, 3 December 2024)
- ML20235W419 + (08:44:42, 3 December 2024)
- ML20235W418 + (08:44:43, 3 December 2024)
- ML20235W416 + (08:44:43, 3 December 2024)
- ML20235W415 + (08:44:44, 3 December 2024)
- ML20235W411 + (08:44:45, 3 December 2024)
- ML20235W412 + (08:44:45, 3 December 2024)
- ML20235W409 + (08:44:46, 3 December 2024)
- ML20235W406 + (08:44:47, 3 December 2024)
- AECM-87-0104, Forwards Comments Re Written Exams Administered to Two Senior Operators & Eight Reactor Operators on 870518,per Request + (08:44:48, 3 December 2024)
- ML20235W403 + (08:44:48, 3 December 2024)
- ML20235W401 + (08:44:49, 3 December 2024)
- IR 05000289/1987013 + (08:46:09, 3 December 2024)
- ML20235W395 + (08:46:10, 3 December 2024)
- 05000483/LER-1987-022, :on 870828,Tech Spec 3.0.3 Unknowingly Entered Twice When Action Statement for Inoperable Auxiliary Feedwater Pressure Channel Not Met.Caused by Procedural Inadequacies.Procedure Revised + (08:46:12, 3 December 2024)
- RBG-26782, Monthly Operating Rept for Sept 1987 + (08:46:13, 3 December 2024)
- ML20235W389 + (08:46:14, 3 December 2024)
- NLS8700515, Proposes to Provide Open/Close Indication for Alternate Rod Insertion (ARI) Solenoid Valves at Location Outside Reactor Other than Control Room.Requests NRC Concurrence in Support of ARI Sys Installation Scheduled for Next Refueling Outag + (08:46:15, 3 December 2024)
- ML20235W384 + (08:46:16, 3 December 2024)
- 05000346/LER-1987-012, :on 870910,inadvertent,inconsequential Trip of Control Rod Drive Breakers in Hot Shutdown Occurred.Caused by Inadequate Surveillance Test Procedure.Change to Procedure Initiated + (08:46:17, 3 December 2024)
- ML20235W379 + (08:46:18, 3 December 2024)
- ML20235W378 + (08:46:19, 3 December 2024)
- ML20235W376 + (08:46:20, 3 December 2024)
- ML20235W373 + (08:46:21, 3 December 2024)
- 05000440/LER-1987-065, :on 870914,main Steam Drain Line Inboard Isolation Valve Closed Unexpectedly Due to Nssss Isolation Signal During Testing.Caused by Bad Connection in Channel C Isolation Logic + (08:46:22, 3 December 2024)
- 05000322/LER-1987-030, :on 870911,primary Containment Purge Filter Operated for 1,398 H Since Last Charcoal Sample Removed. Caused by Lack of Accurate Method for Tracking Run Time Hours.Schedule Activity Work Sheet Created + (08:46:24, 3 December 2024)
- ML20235W366 + (08:46:25, 3 December 2024)
- ML20235W365 + (08:46:28, 3 December 2024)
- ML20235W360 + (08:46:32, 3 December 2024)
- ML20235W358 + (08:46:34, 3 December 2024)
- ST-HL-AE-2297, Forwards Proprietary Description of Security Related Activities,Training & Qualification Plan & Rev 5 to Safeguards Contingency Plan.Description & Rev Withheld (10CFR73.21) + (08:46:35, 3 December 2024)
- ML20235W357 + (08:46:35, 3 December 2024)
- ML20235W353 + (08:46:36, 3 December 2024)