ML20235W395

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-289/87-13 on 870709-0904.No Violations Noted.Ack Receipt of 870416,0723 & 0825 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-289/87-06 & 87-09
ML20235W395
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/06/1987
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20235W398 List:
References
REF-GTECI-A-47, REF-GTECI-SY, RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8710160202
Download: ML20235W395 (3)


See also: IR 05000289/1987013

Text

- - .

..

>

.i

l

l

USHRC-DS

l

e il A o: ao

j

06 00T 1987

,

Docket No. 50-289

i

i

GPU Nuclear Corporation

]

ATTN: Mr. H. D. Hukill

i

Vice President and Director, TMI-1

)

P. O. Box'480

j

Middletown, Pennsylvania 17057

l

i

Gentlemen:

I

Subject:

Inspection Report No. 50-289/87-13

i

!

During the period from July 9, 1987, to September 4, 1987, members of NRC

l

Region I staff conducted routine safety inspections at your facility. We

.

documented the results of that inspection in the enclosed report.

At the

conclusion of the inspection period, Mr. R. Conte of my staff summarized

1

the inspection findings with you and other members of your staff. We

identified no conditions adverse to nuclear safety and no violations of

regulatory requirements.

This also acknowledges receipt and the acceptability of your responses,

dated April 16, July 23, July 31, and August 25, 1987, to violations of

NRC requirements identified by our letters. dated March 18 and June 23,

1987 (NRC Inspection Report Nos. 50-289/87-06 and 87-09, respectively).

With respect to equipment and personnel performance problems in the

letdown prefilter room, we are satisfied with your planned corrective

action, assuming effective implementation of these measures.

All of the

identified violations, along with your responses, will be reviewed in a

future inspection.

I

No response to this letter is required.

Thank you for your cooperation

i

in these matters.

I

Sincere 1y,

@IlMigEBy

~

Lee H. Bettenhausen, Chief

)

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

NRC Region I Inspection Report No. 50-289/87-13

j

h

P

G

l

OFFICIAL RECORD COPY

IR TMIl 87-13 - 0001.0.0

l

09/24/87

1

0l

\\

i

i

'

a_-________

_ - _ _

_ _ - _ _ _

v

. . ,

!

GPU~ Nuclear Corporation

2

06 00T 1987

.i

cc w/ enc 1:

T. G. Broughton, Operations and Maintenance Director, TMI-1

C. W. Smyth, TMI-1 Licensing Manager

R. J. McGoey, Manager, PWR Licensing

E. L. Blake, Jr.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

,

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region I Docket Room (with concurrences)

J. Goldberg, OELD:HQ

Management Assistant, DRMA (w/o encl)

Operations Branch, DRS Files

Engineering Branch, DRS Files

EP & RP Branch, DRSS Files

'S. Collins, DRP Branch Chief

R. Blough, DRP Sectior, Chief

W. Travers, NRR

G. Edison, PM, NRR

K. Abraham, RI

R. Conte, RI

D. Johnson, RI

C. Myers, RV

S. Peleschak, RI

W. Russell, RI

D. Wallace, RI

C. Woodard, RI

4

RI:DRP**

RI:DRP**

RI:DRS**

RI:DRS**

RI:DRS**

RConte/cph

ABlough

NBlumberg

CAnderson

LBettenhausen

9/ /87

9/ /87

9/ /87

9/ /87

9/ /87

,

i

'

    • Previous Concurrence Attached

0FFICIAL RECORD COPY

IR TMIl 87-13 - 0002.0.0

10/06/87

L

J

_ _ - _ - - - _ .

A

.c

,

l

GPU Nuclear Corporation

2

i

cc w/ encl:

,

T. G. Broughton, Operations and Maintenance Director, TMI-1

C. W. Smyth, TMI-1 Licensing Manager

R. J. McGoey, Manager, PWR Licensing

E. L. Blake, Jr.

'

l

TMI-1 OTSG Hearing Service List

!

Public Document Room (PDR)

Local Public Document Rocm (LPDR)

'

Nuclear Safety Information Center (NSIC)

l

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

l

Region I Docket Room (with concurrences)

J. Goldberg, OELD:HQ

Management Assistant, DRMA (w/o enc 1)

Operations Branch, DRS Files

Engineering Branch, DRS Files

EP & RP Branch, DRSS Files

S. Collins, DRP Branch Chief

f

R. Blough, DRP Section Chief

,

W. Travers, NRR

l

G. Edison, PM, NRR

'

K. Abraham, RI

R. Conte, RI

D. Johnson, RI

C. Myers, RV

S. Peleschak, RI.

)

W. Russell, RI

D. Wallace, RI

C. Woodard, RI

I

,

RI:DRP

2RI:DRP

-

b

1

I DR

RI:DRS

RI:DRS

l

RConte/cph

ABlough

8

LBettenhausen

bergqfAnderson

/f 9/h/87

9/11/87

9/ /87

9/Jj/87

/a/6/87

0FF.' : IAL RECORD COPY

IR TMIl 87-13 - 0002.0.0

'

09/24/87

l

_

. _ _