Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235Y878 + (08:25:22, 3 December 2024)
- ML20235Y876 + (08:25:23, 3 December 2024)
- ML20235Y877 + (08:25:23, 3 December 2024)
- ML20235Y875 + (08:25:24, 3 December 2024)
- ML20235Y872 + (08:25:25, 3 December 2024)
- ML20235Y873 + (08:25:25, 3 December 2024)
- ML20235Y870 + (08:25:26, 3 December 2024)
- ML20235Y871 + (08:25:26, 3 December 2024)
- IR 05000353/1989009 + (08:25:28, 3 December 2024)
- ML20235Y867 + (08:25:28, 3 December 2024)
- 05000458/LER-1989-004, :on 890210,ESF Actuation Occurred When Instrumentation & Controls Technician Incorrectly Took Voltage Reading on Instrument Trip Unit.Caused by Personnel Error.Technician Received Counseling + (08:25:30, 3 December 2024)
- ML20235Y865 + (08:25:31, 3 December 2024)
- IR 05000528/1987027 + (08:25:32, 3 December 2024)
- ML20235Y864 + (08:25:32, 3 December 2024)
- ML20235Y862 + (08:25:33, 3 December 2024)
- ST-HL-AE-2383, Responds to NRC Re Deviation Noted in Insp Repts 50-498/87-41 & 50-499/87-41.Corrective Actions:Affected Preventive Maint & Maint Work Requests Not Identified as quality-related When Performed Have Been Reviewed + (08:25:34, 3 December 2024)
- ML20235Y859 + (08:25:35, 3 December 2024)
- ML20235Y860 + (08:25:35, 3 December 2024)
- ML20235Y858 + (08:25:36, 3 December 2024)
- ML20235Y857 + (08:25:36, 3 December 2024)
- AECM-87-0193, Forwards Plant Operations Procedures 07-S-53-C11-21 & 07-S-53-C11-22 Written to Perform Testing of Scram Valves a & B,Respectively,Per NRC 870731 Request for Addl Info Re Util Response to Generic Ltr 83-28,Item 4.5 + (08:25:37, 3 December 2024)
- ML20235Y854 + (08:25:37, 3 December 2024)
- ML20235Y853 + (08:25:38, 3 December 2024)
- ML20235Y850 + (08:25:40, 3 December 2024)
- 05000373/LER-1989-007-01, :on 890210,potential Loss of Control Room Isolation Noted.Caused by Possible Failure of Exhaust Purge Dampers in Open Position W/O Direct Indication.Dampers Mechanically Disconnected & Wired Closed + (08:25:40, 3 December 2024)
- ML20235Y849 + (08:25:41, 3 December 2024)
- ML20235Y843 + (08:25:45, 3 December 2024)
- ML20235Y844 + (08:25:45, 3 December 2024)
- 05000374/LER-1989-005-01, :on 890207,isolation of Shutdown Cooling Sys Due to Spurious High Flow Signal.Pulsation Dampeners Installed in Unit 2 Switches.Instrument Lines Completely Walked Down & Verified to Be Properly Routed + (08:25:47, 3 December 2024)
- ML20235Y839 + (08:25:48, 3 December 2024)
- ML20235Y841 + (08:25:48, 3 December 2024)
- ML20235Y837 + (08:25:49, 3 December 2024)
- 05000338/LER-1987-018, :on 870819,Limitorque Motor on Valve Found to Lack Environ Qualification Documentation.Caused by Inadequate Training & Procedural Controls.Motor Replaced & Adequate Training & Controls Established + (08:25:51, 3 December 2024)
- ML20235Y834 + (08:25:53, 3 December 2024)
- NRC-87-0184, Monthly Operating Rept for Sept 1987 + (08:25:54, 3 December 2024)
- ML20235Y830 + (08:25:55, 3 December 2024)
- ML20235Y829 + (08:25:55, 3 December 2024)
- 05000341/LER-1989-005, :on 890208,potential Concerns W/Secondary Containment Integrity Due to Use of non-Q Air Supply Noted, Following Test Failure.Caused by Wind Conditions Impacting Test Results.Foam Seal Installed within 4 H + (08:25:57, 3 December 2024)
- ML20235Y827 + (08:25:57, 3 December 2024)
- 05000341/LER-1987-047, :on 870918,discovered That Div I of Control Ctr HVAC Chiller Pump & Valve Operability Surveillance Had Not Been Completed by Critical Completion Date.Caused by Inadequate Training of Operators + (08:25:59, 3 December 2024)
- 05000499/LER-1989-003-01, :on 890203,partial Loss of Offsite Power Occurred on 4.16 Kv ESF Train C Bus.Caused by Misoperation of Brown Boveri Model ITE87T Transformer & Mfg Defect.Relay Replaced & Train C Bus Restored + (08:26:01, 3 December 2024)
- ML20235Y824 + (08:26:01, 3 December 2024)
- B13139, Forwards Haddam Neck Plant Semiannual Radioactive Effluents Release Rept Jul-Dec 1988. Annual Radioactive Effluents Dose Rept to Be Submitted in Mar 1989 to Include Assessment of Radiation Doses Due to Stated Effluents During CY88 + (08:26:02, 3 December 2024)
- ML20235Y822 + (08:26:02, 3 December 2024)
- ML20235Y820 + (08:26:03, 3 December 2024)
- ML20235Y819 + (08:26:03, 3 December 2024)
- ML20235Y818 + (08:26:04, 3 December 2024)
- ML20235Y817 + (08:26:05, 3 December 2024)
- PLA-2924, Monthly Operating Repts for Sept 1987 + (08:26:05, 3 December 2024)
- ML20235Y812 + (08:26:06, 3 December 2024)
- ML20235Y811 + (08:26:07, 3 December 2024)
- ML20235Y806 + (08:26:08, 3 December 2024)