Responds to NRC Re Violations Noted in Insp Rept 50-282/87-11.Corrective Actions:All 4 Kv Breakers Checked & Found Properly Racked In,Breaker Inspected & Procedure Change Made to Better Control Status of Breakers
ML20235Y858
Person / Time
Site: Prairie Island 
Issue date: 10/16/1987
From: Larson C
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF ENFORCEMENT (OE)
References
NUDOCS 8710200508
Download: ML20235Y858 (3)


Text

]'

l 4

i 1

4 Northem States Power Company 414 Nicollet Mall Minneapolis Minnesota 55401 Telephone (612) 330 5500 October 16, 1987L i

Director Office of Enforcement U S Nuclear Regulatory Commission ATTN:. Document Control Desk Washington, DC 20555 3,

i o C PRAIRIE ISLAND NUCLEAR GENERATING PLANT C (nb N

Docket Nos. 50-282 License Nos. DPR-42 O

O i

50-306 DPR-60 p $

m 4?

4 Reply to a Notice of Violation

References:

(a) Letter from A Bert Davis, Regional Administrator, Region III, USNRC, Notice of Violation and Proposed Imposition of Civil Penalty, NRC Inspection Report No. 50-282/87011 (DRP), September 18, 1987 (b) Letter from C E Larson, NSP, to Director Office of Enforcement, USNRC, October 1, 1987 On September 18, 1987, Reference (a) was issued by the NRC Region III Administrator. The Notice of Violation concerned inoperability of No. 11 Safety Injection Pump when, on June 18, 1987, its motor breaker was found not fully racked in.

Detailed information related to this event was provided in Licensee Event Report 50-282-87-009 dated July 17, 1987.

In accordance with instructions given in the Notice of Violation. the following response is offered.

Admission or Dental of Alleged Violation We agree that the motor breaker for No. 11 Safety Injection Pump was not

)

fully racked in on June 18, 1987 and had probably been in that condition since May 27, 1987.

Reasons for the Violation j

Root cause of the event was failure to leave the breaker completely racked I

in.

This could have resulted from failure to properly rack the breaker in or inadvertent disengagement of the locking lever during tool removal.

l pdf 8710200508 871016 PDR ADOCK 05000282

'I Q G

PDR l

s l

I f

3 Director Office of Enforcement October 16, 1987 Page'2 Procedural deficiencies also contributed to the event as described in the Licensee Event Report for this occurrence.

Corrective Steps That Have or Will be Taken to Avoid Further Violations l

The following corrective actions have been taken:

- All other 4KV breakers were checked and found to be properly racked in.

l

- The breaker was mechanically and electrically inspected; no abnormal conditions were found.

- A Shift Supervisor was assigned to independently investigate the event.

This investigation focused on the involvement of operators in this event and included interviews with all the operators on shift at the time of the event.

Administrative controls for independent verification of breaker condition were tightened.

Specifically, any safety-related 4KV breaker will be operationally tested after being racked in.

The plant technical staff will be evaluating possible modifications to these breakers which which will provide positive assurance that the breakers fully racked in without the need for an operational test.

are

- Procedure changes were made to better control the status of safety injection pump motor breakers.

- Procedure changes were also made to improve the methods for independent verification of breaker status.

All operators have received hands-on training on these revised procedures.

Date When Full Compliance Will Be Achieved We believe that the corrective actions described above will prevent future occurrences.

In particular, operational testing of breakers after racking them in will provide positive assurance that they are properly racked in.

Full compliance has been achieved.

I l

{

l

)

l l

i 1

A

.i

o.

u I

Director Office of. Enforcement October 16, 1987 l

Page 3 i

l i

Please contact us if you have any questions related to our resolution I

of this matter, A check in full payment of the civil penalty was 1

-submitted with Reference (b),

I l

d Me F08b -

C E Larson Vice President Nuclear Generation c:

Regional Administrator-III, NRC f

Sr NRC Resident Inspector Sr NRR Project Manager G Charnoff i