Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235Z658 + (08:17:57, 3 December 2024)
- ML20235Z655 + (08:17:58, 3 December 2024)
- ML20235Z656 + (08:17:58, 3 December 2024)
- ML20235Z653 + (08:17:59, 3 December 2024)
- ML20235Z650 + (08:18:00, 3 December 2024)
- ML20235Z646 + (08:18:01, 3 December 2024)
- ML20235Z645 + (08:18:02, 3 December 2024)
- ML20235Z644 + (08:18:03, 3 December 2024)
- ML20235Z643 + (08:18:03, 3 December 2024)
- ML20235Z639 + (08:18:04, 3 December 2024)
- ML20235Z637 + (08:18:05, 3 December 2024)
- PNO-V-87-068, on 871013,licensee Informed Region of Third Quarter 1987 Radiation Exposure to Reactor Operator Discovered in Vendor Dosimetry Rept on 871009.Operator Received 1,530 Mrems Exceeding 10CFR20.101(a) Limits + (08:18:06, 3 December 2024)
- IR 05000341/1989002 + (08:18:31, 3 December 2024)
- ML20235Z631 + (08:18:32, 3 December 2024)
- ML20235Z629 + (08:18:32, 3 December 2024)
- ML20235Z628 + (08:18:33, 3 December 2024)
- ML20235Z621 + (08:18:36, 3 December 2024)
- ML20235Z618 + (08:18:37, 3 December 2024)
- ML20235Z620 + (08:18:37, 3 December 2024)
- U-601393, Monthly Operating Rept for Feb 1989 for Clinton Power Station Unit 1 + (08:18:38, 3 December 2024)
- 05000259/LER-1989-002-02, :on 890208,buried Raw Cooling Water Discharge Piping Between Reactor Bldgs & Circulating Water Discharge Conduit Not Seismically Qualified.Caused by Design Error. Corrective Action Evaluated & Implemented + (08:18:42, 3 December 2024)
- U-601401, Provides Plant Property Damage Insurance Coverage,Per 10CFR50.54(w)(2) + (08:18:42, 3 December 2024)
- IR 05000029/1987014 + (08:18:43, 3 December 2024)
- ML20235Z603 + (08:18:44, 3 December 2024)
- ML20235Z600 + (08:18:45, 3 December 2024)
- ML20235Z595 + (08:18:46, 3 December 2024)
- ML20235Z593 + (08:18:47, 3 December 2024)
- ML20235Z592 + (08:18:47, 3 December 2024)
- ML20235Z589 + (08:18:48, 3 December 2024)
- ML20235Z587 + (08:18:49, 3 December 2024)
- ML20235Z585 + (08:18:50, 3 December 2024)
- ML20235Z584 + (08:18:51, 3 December 2024)
- ML20235Z583 + (08:18:51, 3 December 2024)
- ML20235Z581 + (08:18:53, 3 December 2024)
- ML20235Z578 + (08:18:54, 3 December 2024)
- ML20235Z574 + (08:18:54, 3 December 2024)
- ML20235Z571 + (08:18:55, 3 December 2024)
- ML20235Z566 + (08:18:56, 3 December 2024)
- ML20235Z565 + (08:18:57, 3 December 2024)
- 05000499/LER-1989-004-01, :on 890206,radiation Monitor on Fuel Handling Bldg (Fhb) Exhaust Air Duct Went Into High Alarm & Actuated Fhb HVAC to Filtered Exhaust Mode.Cause Unknown.Actuated & Redundant Monitor Confirmed to Be in Calibr + (08:18:59, 3 December 2024)
- 0CAN038905, Responds to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Specific Actions Requested to Be Taken Listed + (08:19:00, 3 December 2024)
- 0CAN038906, Responds to 890223 Request for Addl Info Re Util 881221 Submittal of Results of Latest Fire Barrier Penetration Seal Testing.Response to Request Will Be Submitted by 890424. Delay Due to Workload of Fire Protection Group + (08:19:00, 3 December 2024)
- PNO-I-87-096, on 871016,plant Scrammed on High Neutron Flux from 89% Power During Testing Causing Main Steam Pressure Oscillations Triggering APRM High Flux Scram.Crd Stub Tube Leakage Identified.Hydrostatic Tests Performed + (08:19:01, 3 December 2024)
- ML20235Z558 + (08:19:03, 3 December 2024)
- ML20235Z557 + (08:19:03, 3 December 2024)
- ML20235Z555 + (08:19:04, 3 December 2024)
- ML20235Z552 + (08:19:05, 3 December 2024)
- ML20235Z553 + (08:19:05, 3 December 2024)
- ML20235Z549 + (08:19:06, 3 December 2024)
- W3P89-0054, Forwards Summary of Personnel Monitoring Ending 881231 & Tech Spec 6.9.1.5 End of Yr Rept,1988 + (08:19:07, 3 December 2024)
- ML20235Z543 + (08:19:08, 3 December 2024)
- ML20235Z547 + (08:19:08, 3 December 2024)