ML20235Z587
| ML20235Z587 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 03/07/1989 |
| From: | Kemper J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20235Z590 | List: |
| References | |
| NUDOCS 8903160003 | |
| Download: ML20235Z587 (4) | |
Text
_ - _ - _ _ _
4
(
PHILADELPHIA ELECTRIC CO'MPANY.
l 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA A, PA.19101 (215)841 45oo s2NIOR VI RES EN NUCLEAR U.S. Nuclear Regulatory Conmission Document Control Desk Washington, D.C. 20555
Subject:
Limerick Generating Station Unit 2 Equipment Qualification Prograin
. As requested by the Nuclear Regulatory Conmission staff, this letter provides confirmation that the Equipment Qualification programs used for dynamic and environmental qualification of Limerick Generating Station (LGSl Unit 2 are consistent with the programs utilized for LGS Unit _1.
While the programs are consistent, as described in the attached " Extension of Equipment Qualification Programs to Limerick Generating Station - Un!t 2","there are differences between the two units due to changes In equipment design or location. The attachment also Indicates those differences and the results of our cuall-fication' programs for that equipment.
Should you have any questions or require additional Information, please do not hesitate to contact us.
$5f J. S. Kemper l
WJC/ss/02138901 Attactment 04 l'\\
t 8903160003 890307 y
PDR ADOCK 05000353 p A
PDC b
3
bec:
C. A. McNelli - S26-1 S. J. Koaalski - S25-1 E. J. Bradley - S23-1 L. B. Pyrlh - N2-1 E.
P.' Foga rty - S7-1 D. R. Helwig - S7-1 G. A. Hunger, Jr. - N7-1 f
A. J. Marie - N3-1 J. T. Robb - S7-1 l
H. D. Honan - N2-1 D. P. Helker - S7-1 G. M. Leitch - LGS R. J. Lees - N2-1 W. J. Boye r, Jr. - N2-1 W. J. Coyle - N2-1 D. J. Thompson, dr. - N2-1 H. W. Vollmer - N2-1 P. J. Duca, Jr. - LGS C. R. Endriss - LGS
- d. M. Corcoran - LGS T. E. Shannon - N2-1 R. M. Krich -- N7-1 M. S. Iyer - BPC/SF D. B. Fetters - N4-1 DAC (NG-8) 1 k
l j
l
':,rch 1, I Ni9 U.S. Nuclear Regulatory Ccmnission Doctment Control Desk Washington, D.C. 20555
Subject:
Limerick Generating Station Unit 2 Equipment Qualification Program As requested by the Nuclear Regulatory Conmission staff, this letter provides confirmation that the Equipment Qualification programs used for dynamic and environmental qualification of Limerick Generating Station (LGS) Unit 2 are consistent with the programs utilized for LGS Unit 1.
While the programs are consistent, as described in the attached " Extension of Equipment Qualification Programs to Limerick Generating Station - Unit 2", there are differences between the two units due to changes in equipment design or location. The attachment also Indicates those differences and the results of our quall-fication programs for that equipment.
Should you have any questions or require additional Information, please do not hesitate to contact us.
J. S. Kemper g!
a t n Y
p WJC/ss/02138901 Attachment
l bec:
C. A. McNelli - S26 S. J. Kcrvatski - S25-1 E. J. Bradley - S23-1 L. B. Pyrlh - N2-1 E. P. Fogarty - S7-1 D. R. Helwig - S7-1 G. A. Hunger, Jr. - N7-1 A. d. Marie - N3-1
- d. T. Robb - S7-1 H. D. Honan - N2-1 D. P. Helker - S7-1 G. M. Leitch - LGS R. J. Lees - N2-1 W. J. Boyer, dr. - N2-1 W. J. Coyle - N2-1 D. J. Thompson, Jr. - N2-1 H. W. Vollmer - N2-1 P. J. Duca, Jr. - LGS C. R. Endrfss - LGS
- d. M. Corcoran - LGS T., E. Shannon - N2-1.
R. ' M. Krich - N7-1 M. S. Iyer - BPC/SF D. B. Fetters - N4-1 DAC (NG-8) i
_