- 05000269/LER-1987-006-05, :on 870521,during QA Review Determined That Required Valve Body Pressure Test Not Performed on Valves 3HP-43 & 3LPSW-18.Caused by Personnel Error.Required Pressure Test Performed & Individual Counseled + (07:59:08, 3 December 2024)
- ML20236B624 + (07:59:09, 3 December 2024)
- ML20236B625 + (07:59:09, 3 December 2024)
- IR 05000354/1989003 + (07:59:10, 3 December 2024)
- 05000373/LER-1988-029-01, :on 881230,discovered That Reactor Vessel Low Water Level 3 Switch LS-1B21-N038B Found W/Setpoint out-of- Tolerance in Excess of Reject Limit.Caused by Degradation of Contact on Microswitch.Rejected Switch Removed + (07:59:12, 3 December 2024)
- ML20236B617 + (07:59:13, 3 December 2024)
- ML20236B621 + (07:59:13, 3 December 2024)
- ML20236B615 + (07:59:16, 3 December 2024)
- NL-87-1322, Monthly Operating Rept for Sept 1987 + (07:59:16, 3 December 2024)
- ML20236B613 + (07:59:17, 3 December 2024)
- ML20236B611 + (07:59:18, 3 December 2024)
- ML20236B612 + (07:59:18, 3 December 2024)
- AECM-87-0135, Confirms Jul 1987 Telcon W/Nrc Re Validity of Loss of Feedwater Heating Analysis & Use of Cotransa Computer Code in Support of Cycle 3.Addl Analyses at Four Cycle 3 Exposures Performed.Schedule Requested to Support Review + (07:59:19, 3 December 2024)
- ML20236B606 + (07:59:20, 3 December 2024)
- ML20236B607 + (07:59:20, 3 December 2024)
- 05000455/LER-1987-016, :on 870831,during Surveillance Test,Inadvertent Train a Safety Injection Occurred.Caused by Personnel Communication Breakdown.Prof Program Will Be Covered W/ Operating Dept for 6 Wks + (07:59:22, 3 December 2024)
- ML20236B604 + (07:59:22, 3 December 2024)
- ML20236B602 + (07:59:23, 3 December 2024)
- ML20236B603 + (07:59:23, 3 December 2024)
- ML20236B599 + (07:59:24, 3 December 2024)
- ML20236B597 + (07:59:25, 3 December 2024)
- ML20236B596 + (07:59:26, 3 December 2024)
- IR 05000220/1987016 + (07:59:42, 3 December 2024)
- ML20236B594 + (07:59:42, 3 December 2024)
- ML20236B593 + (07:59:43, 3 December 2024)
- ML20236B590 + (07:59:44, 3 December 2024)
- NRC-87-0189, Ro:On 870926,emergency Diesel Generator Failed to Start. Caused by Inadvertent Closure of Instrument Isolation Valve. Instrumentation & Controls Repairman Involved Will Be Counseled + (07:59:45, 3 December 2024)
- ML20236B588 + (07:59:45, 3 December 2024)
- ML20236B585 + (07:59:46, 3 December 2024)
- ML20236B584 + (07:59:47, 3 December 2024)
- ML20236B583 + (07:59:47, 3 December 2024)
- ML20236B582 + (07:59:48, 3 December 2024)
- 05000455/LER-1989-001-08, :on 890211,inadvertent Safety Injection Actuation of Trains a & B Equipment Occurred During Performance of Diesel Generator Operability Surveillance. Caused by Procedural Inadequacy + (07:59:52, 3 December 2024)
- ML20236B574 + (07:59:53, 3 December 2024)
- ML20236B573 + (07:59:54, 3 December 2024)
- ML20236B571 + (07:59:58, 3 December 2024)
- ML20236B568 + (08:00:00, 3 December 2024)
- ML20236B565 + (08:00:02, 3 December 2024)
- TXX-6590, Interim Deficiency Rept CP-86-68 Re Weather Protection for Class 1E Components Used in Outdoor Installations.Initially Reported on 861002.Evaluation Continuing.Submittal of Next Rept Anticipated by 870904 + (08:00:03, 3 December 2024)
- ML20236B562 + (08:00:04, 3 December 2024)
- ML20236B563 + (08:00:04, 3 December 2024)
- ML20236B560 + (08:00:05, 3 December 2024)
- ML20236B559 + (08:00:05, 3 December 2024)
- ML20236B558 + (08:00:06, 3 December 2024)
- 05000395/LER-1987-023, :on 870922 & 23,control Room Ventilations Aligned to Emergency Recirculation Mode as Result of Spurious High Radiation Signals.Caused by Dirty Card Edges. All Card Edges Cleaned + (08:00:08, 3 December 2024)
- ML20236B555 + (08:00:08, 3 December 2024)
- ML20236B554 + (08:00:09, 3 December 2024)
- ML20236B553 + (08:00:10, 3 December 2024)
- 05000366/LER-1989-002-02, :on 890223,discovered That Current Rev to Procedure Re Daily Inside Rounds Did Not Verify That Two Circuits in Panel 2R25-S105 de-energized Once Per 24 H. Caused by Personnel Error.Mgt Memo Issued + (08:00:12, 3 December 2024)
- 05000482/LER-1987-038, :on 870918,determined That Operability of Electric & Diesel Driven Fire Pumps Not Properly Verified. Caused by Procedural Deficiency.Surveillance Procedure Revised & Surveillance Test Performed + (08:00:14, 3 December 2024)
- ML20236B550 + (08:00:14, 3 December 2024)