Text
9, y
y
-m
'I L
m
~
iMarch 14, 1989
't.
i
- Alabama Power Company ATTN: Mr. W. G.-Hairston, III y
' Senior Vice Presidentt
+
l P.
0.. Box 1295 Birmingham, AL -35201
-Gentlemen:
L
SUBJECT:
J. M. FARLEY' NUCLEAR PLANT EXAMINATION REPORT _- 50-348/0L-88-01 The NRC administered examinations on November 14-18, 1988 to employees of-your company who had applied for. licenses to operate the J. M. Farley Nuclear Plant.
. At the conclusion of'the written examination, a copy of the exam was left with l
. your staff; at the conclusion of the site visit, preliminary findings on the operating tests were discussed with those members of your st6ff identified in l
i the Examination Report, Enclosure 1.
Copies of the' written examination questions and answer key are included in 3
this report as Enclosure 2.
Facility comments regarding the written-examination are-included in this report as Enclosure 3.
summarizes simulator performance deficiencies cbserved during conduct of the simulator portion of the operating examinations.
Your attention is directed to information'in paragraph 4 of Enclosure 1 of this report.concerning reference material provided by your staff to the NRC for exam prepartion.
In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in NRC's Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, (Original signed by C. A Julian)
Caudie A. Julian, Chief Operations Branch l
Division of Reactor Safety
Enclosures:
1.
Exam Report 50-348/0L-88-01 2.
R0/SR0 Exam Questions & Answer Key l
3.
Facility Comments 4.
Simulation Facility Fidelity Report gdh cc w/encls 1 & 3:
/
8 D. N. Morey, Plant Manager cc w/encls 1, 2, 3 & 4:
L. S. Williams, Training Director bec:
(Seepage 2)'
g 32 gly gg$
43
_ u _ __
- t. -
l Alabama Power Company 2
March 14, 1989 1
l bec w/ enc 1 1:
~
Project Manager, NRR Section Chief, DRP Jim Moorman,- OL Examiner, DRS.
State of Alabama bec w/encls 1, 2, 3, & 4:
j Senior Resident inspector i
Operator. Licensing Branch, DLPQ:NRR Document Control Desk Sonclysts, Contractor i
RI s /
rA RII[fM 3
R11 RII J
rman JMunro HDance CA u'ian 01/g/89 01/\\]/89 01/ /89 01/1 /89 I