Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236C859 + (07:40:10, 3 December 2024)
- ML20236C857 + (07:40:11, 3 December 2024)
- ML20236C854 + (07:40:12, 3 December 2024)
- ML20236C853 + (07:40:12, 3 December 2024)
- IR 05000416/1987023 + (07:40:20, 3 December 2024)
- ML20236C851 + (07:40:21, 3 December 2024)
- ML20236C849 + (07:40:22, 3 December 2024)
- ML20236C847 + (07:40:22, 3 December 2024)
- ML20236C844 + (07:40:24, 3 December 2024)
- ML20236C842 + (07:40:24, 3 December 2024)
- ML20236C840 + (07:40:25, 3 December 2024)
- IR 05000458/1989006 + (07:40:26, 3 December 2024)
- BSEP-87-1173, Revised Semiannual Radioactive Effluent Release Rept for Jan-June 1987 + (07:40:27, 3 December 2024)
- ML20236C836 + (07:40:27, 3 December 2024)
- ML20236C834 + (07:40:28, 3 December 2024)
- ML20236C835 + (07:40:28, 3 December 2024)
- ML20236C833 + (07:40:29, 3 December 2024)
- ML20236C829 + (07:40:30, 3 December 2024)
- ML20236C830 + (07:40:30, 3 December 2024)
- ML20236C828 + (07:40:31, 3 December 2024)
- ML20236C825 + (07:40:32, 3 December 2024)
- TXX-6866, Interim Deficiency Rept CP-87-10 Re Inadequate Design Change Document Control Measures.Initially Reported on 870511. Design Documents Reviewed to Establish Technical Adequacy. Next Report Will Be Submitted by 880112 + (07:40:32, 3 December 2024)
- ML20236C821 + (07:40:33, 3 December 2024)
- BECO-87-120, Forwards Results of thermal-hydraulic Stability Analysis Performed by GE for Cycle 8 Operation.Reactor Core Stability Decay Ratio of 0.64 Concluded as Acceptable + (07:40:34, 3 December 2024)
- ML20236C819 + (07:40:34, 3 December 2024)
- ML20236C818 + (07:40:35, 3 December 2024)
- ML20236C817 + (07:40:36, 3 December 2024)
- ML20236C815 + (07:40:36, 3 December 2024)
- ML20236C814 + (07:40:37, 3 December 2024)
- ML20236C813 + (07:40:37, 3 December 2024)
- ML20236C806 + (07:40:40, 3 December 2024)
- ML20236C811 + (07:40:40, 3 December 2024)
- ML20236C805 + (07:40:41, 3 December 2024)
- IR 05000211/2013001 + (07:40:42, 3 December 2024)
- ML20236C803 + (07:40:42, 3 December 2024)
- ML20236C799 + (07:40:43, 3 December 2024)
- NRC-87-0113, Ro:On 870625,emergency Diesel Generators (Edgs) 12,13, & 14 Automatically Started Simultaneously Due to ESF Actuation Signal.Edgs 12 & 14 Synchronized & Loaded Successfully.Edg 1 Trouble Alarm Annuciated.Cause Unknown + (07:40:43, 3 December 2024)
- ML20236C798 + (07:40:44, 3 December 2024)
- ML20236C794 + (07:40:45, 3 December 2024)
- ML20236C797 + (07:40:45, 3 December 2024)
- ML20236C792 + (07:40:46, 3 December 2024)
- ML20236C791 + (07:40:47, 3 December 2024)
- ML20236C788 + (07:40:48, 3 December 2024)
- 05000338/LER-1985-003-01, :on 850319,review of Facility Main Dam & Hydro Structures Revealed Previous Studies Failed to Identify Units 3 & 4 Const Area as Potential Flood Path to Units 1 & 2 Turbine Bldg.Concrete Wall Constructed + (07:40:49, 3 December 2024)
- ML20236C786 + (07:40:50, 3 December 2024)
- ML20236C785 + (07:40:51, 3 December 2024)
- ML20236C782 + (07:40:52, 3 December 2024)
- ML20236C781 + (07:40:52, 3 December 2024)
- B12633, Responds to Request for Addl Info Re Question 10 Concerning NULAP5.Current Results w/NULAP5 Shown to Predict All Test Data Pertinent to Major Phenomenon Associated W/Small Break LOCA Response.Evaluation Will Be Submitted by Nov 1988 + (07:40:53, 3 December 2024)
- ML20236C780 + (07:40:53, 3 December 2024)
- ML20236C777 + (07:40:54, 3 December 2024)