Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236P610 + (05:31:33, 3 December 2024)
- ML20236P608 + (05:31:34, 3 December 2024)
- ML20236P609 + (05:31:34, 3 December 2024)
- 05000423/LER-1998-033, :on 980610,manual ESF Actuation of Motor Driven Auxiliary FW Pumps Was Noted.Caused by Trip of Motor Driven SG FW Pump.Motor Driven FW Pump Impeller Was Replaced + (05:31:36, 3 December 2024)
- ML20236P605 + (05:31:37, 3 December 2024)
- IR 05000423/1987023 + (05:32:42, 3 December 2024)
- ML20236P602 + (05:32:43, 3 December 2024)
- ML20236P601 + (05:32:43, 3 December 2024)
- ML20236P600 + (05:32:44, 3 December 2024)
- ML20236P598 + (05:32:45, 3 December 2024)
- ML20236P596 + (05:32:47, 3 December 2024)
- ML20236P595 + (05:32:47, 3 December 2024)
- ML20236P594 + (05:32:48, 3 December 2024)
- ML20236P591 + (05:32:49, 3 December 2024)
- ML20236P589 + (05:32:50, 3 December 2024)
- ML20236P590 + (05:32:50, 3 December 2024)
- ML20236P588 + (05:32:51, 3 December 2024)
- ML20236P586 + (05:32:52, 3 December 2024)
- ML20236P585 + (05:32:53, 3 December 2024)
- 05000412/LER-1998-011-01, :on 980612,confirmed That cross-connect Lines W/No Isolation Valves Connecting to Hydogen Recombiners, Fails to Comply W/Ts.Caused by Lack of Attention to Detail. Rev to UFSAR Will Be Made Re Hydrogen Recombiner Piping + (05:32:54, 3 December 2024)
- ML20236P582 + (05:32:55, 3 December 2024)
- 05000412/LER-1998-011, Forwards LER 98-011-00, Cross-Connect Piping Installed Between Suction Lines of Hydrogen Recombiners, IAW 10CFR50.73(a)(2)(i) & (II) + (05:32:56, 3 December 2024)
- ML20236P578 + (05:32:56, 3 December 2024)
- ML20236P577 + (05:32:57, 3 December 2024)
- 05000348/LER-1987-013, :on 870710,five Sectors of Land Identified W/Increased Calculated Dose.Caused by Presence of Indicator Milk Animal & Movement of Residents Into or Outside Area + (05:32:59, 3 December 2024)
- ML20236P573 + (05:33:00, 3 December 2024)
- IR 05000219/1987024 + (05:33:36, 3 December 2024)
- ML20236P569 + (05:33:36, 3 December 2024)
- ML20236P568 + (05:33:37, 3 December 2024)
- ML20236P567 + (05:33:38, 3 December 2024)
- ML20236P566 + (05:33:38, 3 December 2024)
- IR 05000443/1987023 + (05:33:41, 3 December 2024)
- ML20236P563 + (05:33:43, 3 December 2024)
- ML20236P560 + (05:33:44, 3 December 2024)
- NOC-AE-000222, Special Rept:On 980614,nonvalid Failure of Standby Diesel Generator Occurred.Caused by Inadequate Procedure.Failed Potential Transformer Was replaced,B-train 4.16 Kv ESF Switchgear Was Reenergized & Procedure Was Revised + (05:33:45, 3 December 2024)
- ML20236P559 + (05:33:45, 3 December 2024)
- 05000395/LER-1998-006, :on 980611,missed Surveillance on Post Accident Monitoring Sys Neutron Flux Instrumentation Channel Check Occurred.Caused by Procedural Inadequacy.Proper Channel Check Performed + (05:33:48, 3 December 2024)
- TXX-6948, Forwards Rev 0 to Corrective Action Program Project Status Rept Conduit Supports Train C 2-Inch Diameter & Less. Resolution of Issues Identified in Generic Technical Issues Rept...Resolution of Cygna Train...Issues Included in Rept + (05:33:49, 3 December 2024)
- 05000458/LER-1987-015, :on 870621,scram Initiation Occurred While Transferring Reactor Protection Sys Power.Caused by Intermediate Range Monitor Channel E Spike.Maint Work Request Generated to Investigate Problem + (05:33:51, 3 December 2024)
- ML20236P551 + (05:33:51, 3 December 2024)
- ML20236P550 + (05:33:52, 3 December 2024)
- ML20236P543 + (05:33:53, 3 December 2024)
- ML20236P547 + (05:33:53, 3 December 2024)
- ML20236P542 + (05:33:54, 3 December 2024)
- ML20236P538 + (05:33:55, 3 December 2024)
- ML20236P536 + (05:33:57, 3 December 2024)
- ML20236P534 + (05:33:57, 3 December 2024)
- ML20236P533 + (05:33:58, 3 December 2024)
- ML20236P528 + (05:33:59, 3 December 2024)
- ML20236P530 + (05:33:59, 3 December 2024)
- ML20236P527 + (05:34:00, 3 December 2024)
- TXX-6943, Forwards Comanche Peak Response Team Results Repts Issue Specific Action Plans Ii.C, Train C Conduit & Supports, Ii.A, Reinforcing Steel in Reactor Cavity & Ii.D Seismic Design of Control Room Ceiling Elements + (05:34:01, 3 December 2024)