Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000272/LER-1982-030-03, /03L-0:on 820419,discovered That Valve 1WR81 Leakage Rate Greater than Max Range of Volumetric Test Equipment.Unable to Verify That Leakage Exceeded Tech Spec Limit.New Test Equipment W/Proper Range Will Be Purchased + (05:18:30, 27 May 2025)
- 05000219/LER-1982-014-01, /01T-0:on 820410,local Leak Rate Testing Found That Five Containment Isolation Valves & One Gasket Did Not Meet 11.9 Scfh Acceptance Criteria.Caused by 1-8 Sump Discharge Seats Degrading.Valves Repaired & Gasket Replaced + (05:18:47, 27 May 2025)
- 05000247/LER-1982-015-03, /03L-0:on 820421,during Routine Surveillance,One of Two Redundant Heat Tracing Circuits Associated W/Safety Injection Pump Train 23 Inoperable.Caused by Lead Wiring Failure.Wiring Repaired & Heaters re-energized + (05:18:51, 27 May 2025)
- IR 05000293/1981026 + (05:18:54, 27 May 2025)
- ML20053C929 + (05:19:06, 27 May 2025)
- ML20053C925 + (05:19:08, 27 May 2025)
- ML20053C911 + (05:19:13, 27 May 2025)
- ML20053C819 + (05:19:55, 27 May 2025)
- IR 05000458/1981010 + (05:20:03, 27 May 2025)
- ML20053C791 + (05:20:05, 27 May 2025)
- ML20053C751 + (05:20:16, 27 May 2025)
- ML20053C706 + (05:20:31, 27 May 2025)
- 05000285/LER-1982-002-03, /03L-1:on 820114,stack Particulate Process Radiation Monitor RM-061 Tripped Causing Containment Radiation High Signal Actuation Due to Failure of Lockout Relay 86B1 to Trip.Caused by Burnt Coil.Coil Replaced + (05:21:02, 27 May 2025)
- 05000285/LER-1982-002, Forwards LER 82-002/03L-1 + (05:21:06, 27 May 2025)
- A820000, Responds to NRC Re Violations Noted in IE Insp Rept 50-298/82-04.Corrective Actions:Administrative Procedure 1.11 Will Be Revised to Include Shelf Life Control Program + (05:21:30, 27 May 2025)
- ENS 57717 + (11:20:03, 27 May 2025)
- ENS 57720 + (11:20:04, 27 May 2025)
- ENS 57721 + (11:20:05, 27 May 2025)
- ENS 57731 + (11:20:07, 27 May 2025)
- Pu-238 + (13:15:25, 27 May 2025)
- Pu-239 + (13:15:50, 27 May 2025)
- RIPE + (20:09:10, 27 May 2025)
- NEI 21-01, Industry Guidance to Support Implementation of NRC Risk-Informed Process for Evaluations + (20:16:11, 27 May 2025)
- RA-23-0008, Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations + (20:23:58, 27 May 2025)
- ML24143A041 + (20:28:29, 27 May 2025)
- Risk-Informed Process for Evaluation + (20:39:22, 27 May 2025)
- ENS 57724 + (11:20:04, 28 May 2025)
- ENS 57723 + (11:20:04, 28 May 2025)
- ENS 57726 + (11:20:02, 29 May 2025)
- ENS 57727 + (11:20:03, 29 May 2025)
- ENS 57733 + (11:20:03, 29 May 2025)
- ENS 57734 + (11:20:03, 30 May 2025)
- ENS 57732 + (11:20:02, 2 June 2025)
- ENS 57737 + (11:20:02, 2 June 2025)
- Solenoid valve + (11:44:33, 2 June 2025)
- CLA + (11:02:47, 3 June 2025)
- NRC Bulletin 79-08, Events Relevant to Boiling Water Power Reactors Identified During Three Mile Island Incident + (18:49:07, 3 June 2025)
- ENS 57685 + (11:20:03, 4 June 2025)
- RSCC + (11:30:16, 4 June 2025)
- ELBP + (18:47:21, 4 June 2025)
- NRC Inspection Manual 0612, Power Reactor Inspection Reports + (11:27:13, 5 June 2025)
- ENS 57735 + (11:20:02, 6 June 2025)
- ENS 57741 + (11:20:04, 6 June 2025)
- ENS 57736 + (11:20:02, 9 June 2025)
- ENS 57743 + (11:20:03, 9 June 2025)
- ML993640216 + (05:50:09, 10 June 2025)
- ML993640212 + (05:50:18, 10 June 2025)
- ML993640100 + (05:50:26, 10 June 2025)
- ML993640096 + (05:50:31, 10 June 2025)
- ML993640089 + (05:50:35, 10 June 2025)
- ML993540271 + (05:50:44, 10 June 2025)