Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20091N259 + (05:18:39, 26 May 2025)
- 05000327/LER-1984-034, :on 840509,valve 1-67-537B Found Mispositioned When Valves 1-FCV-67-123 & 1-FCV-67-124 Opened.Caused by Valve Being Closed Since 840424.Valve Throttled to Proper Position + (05:18:50, 26 May 2025)
- ML20091N215 + (05:19:01, 26 May 2025)
- 05000373/LER-1984-025, :on 840517,trapdoor on Auxiliary Bldg Roof Neither Posted as High Radiation Area Nor Secured to Prevent Unauthorized Entry.Entrance Posted as High Radiation Area, Access Controlled & Door Secured + (05:19:03, 26 May 2025)
- ML20091N203 + (05:19:09, 26 May 2025)
- ML20091N137 + (05:19:17, 26 May 2025)
- ML20091N119 + (05:19:23, 26 May 2025)
- ML20091N103 + (05:19:25, 26 May 2025)
- ML20091N089 + (05:19:27, 26 May 2025)
- ML20091N060 + (05:19:31, 26 May 2025)
- 05000271/LER-1984-006, :on 840508,during Normal Operation,Torus Level Instruments 16-19-46A & 16-19-46B Discovered Reading High. Caused by Hot Slug of Demineralizer Water.Instrument Ref Legs Refilled + (05:19:41, 26 May 2025)
- ML20091N016 + (05:19:45, 26 May 2025)
- ML20091M987 + (05:19:48, 26 May 2025)
- ML20091M974 + (05:19:50, 26 May 2025)
- ML20091M965 + (05:19:54, 26 May 2025)
- ML20091M948 + (05:19:56, 26 May 2025)
- ML20091M917 + (05:20:01, 26 May 2025)
- ML20091M898 + (05:20:03, 26 May 2025)
- ML20091M857 + (05:20:17, 26 May 2025)
- ML20091M845 + (05:20:20, 26 May 2025)
- ML20091M832 + (05:20:27, 26 May 2025)
- ML20091M793 + (05:20:39, 26 May 2025)
- ML20091M791 + (05:20:40, 26 May 2025)
- ML20091M779 + (05:20:43, 26 May 2025)
- ML20091M777 + (05:20:44, 26 May 2025)
- ML20091M772 + (05:20:47, 26 May 2025)
- ML20091M767 + (05:20:49, 26 May 2025)
- 05000311/LER-1984-013, :on 840511,reactor Trip Occurred While Troubleshooting & Calibr Steam Generator narrow-range Level Recorder 22.Caused by Personnel Error.Troubleshooting/Calibr Check Off Sheets Provided to Reduce Accidents + (05:20:51, 26 May 2025)
- ML20091M756 + (05:20:53, 26 May 2025)
- ML20091M737 + (05:20:55, 26 May 2025)
- ML20091M732 + (05:20:57, 26 May 2025)
- ML20091M728 + (05:20:59, 26 May 2025)
- ML20091M708 + (05:21:03, 26 May 2025)
- ML20091M706 + (05:21:04, 26 May 2025)
- ML20091M700 + (05:21:05, 26 May 2025)
- ML20091M690 + (05:21:07, 26 May 2025)
- ML20091M688 + (05:21:08, 26 May 2025)
- 05000374/LER-1984-021-01, :on 840515,during Repair of Filter Demineralizer 2C Post Strainer Section,Outlet Valve Opened & Reactor Water Cleanup Sys Isolated on High Differential Flow.Cause Not Stated + (05:21:12, 26 May 2025)
- ML20091M678 + (05:21:14, 26 May 2025)
- ML20091M676 + (05:21:15, 26 May 2025)
- 05000374/LER-1984-022-01, :on 840521,Door 213,controlling Access to Area Behind Turbine Shield Walls,Found Open.Caused by Personnel Error.Security Contacted to Determine Which Individuals Passed Through Door + (05:21:20, 26 May 2025)
- ML20091M668 + (05:21:21, 26 May 2025)
- ML20091M665 + (05:21:22, 26 May 2025)
- 05000275/LER-1984-015, :on 840508,high Steam Flow Coincident w/low-low Tavg Reactor Trip & Safety Injection Initiated Due to Opened Steam Dump Valves.Caused by Steam Dump Control Sys Malfunction.Pressure Control Module Replaced + (05:21:25, 26 May 2025)
- 05000296/LER-1980-032-03, Lead Wires Accidentally Pulled Out of RCIC Speed Feedback Magnetic Pickup Connector. Caused by Personnel Accidentally Stepping on Lead Wires to Connectors.Wiring to Connector Repaired + (05:21:31, 26 May 2025)
- 05000317/LER-1991-007-01, :on 911224,containment Integrity Breached When Emergency Air Lock Inner & Outer Doors Opened at Once. Caused by Slipped Chain & Misaligned Cam in Interlock Mechanism.Chain & Cam Realigned + (05:21:39, 26 May 2025)
- 05000259/LER-1984-021-01, :on 840505,cabling for Main Steam Relief Valves Not Adequately Separated from Cabling for Nonautomatic Depressurization Sys Main Relief Valves.Caused by Design Error During Recovery from 1975 Fire + (05:21:48, 26 May 2025)
- 05000445/LER-1991-032, :on 911206,incomplete Calibr of Four Channels & Nonconserative Indication of Reactor Power Noted.Caused by Error in Wording of Work Order Instructions.Steps Have Been Revised in Surveillance Database + (05:21:57, 26 May 2025)
- 05000324/LER-1982-088-03, Suppression Pool Suction Supply Valve 2-E11-F004B Stem Spun Beyond Full Open Valve Position.Caused by IGSCC Due to Improper Heat Treating.New Valve Stem Installed + (05:22:05, 26 May 2025)
- 05000275/LER-1984-014, :on 840506,while in Mode 2,spurious Reactor Protection Sys Signal Resulted in Reactor Trip.Caused by Faulty Temp Modifier in Protection Set II Control Cabinet. Component Replaced + (05:22:13, 26 May 2025)
- 05000353/LER-1991-029-01, On 911223,reactor Containment & Isolation Control Sys Activated.Caused by Failure of PCRVICS Fuse B21 H-F15A.All Sys Responded as Designed.Fuse Replaced & All Isolations Reset + (05:22:18, 26 May 2025)