Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140E877 + (02:07:41, 25 May 2025)
- ML20140E747 + (02:08:24, 25 May 2025)
- ML20140E389 + (02:10:09, 25 May 2025)
- ML20140E382 + (02:10:12, 25 May 2025)
- NPL-97-0181, Annual Monitoring Rept for Jan-Dec 1996 + (02:10:18, 25 May 2025)
- DD-84-19, Order Extending Time Until 841221 for Commission to Decide Whether to Review Directors Decisions DD-84-19 & DD-84-20. Served on 841218 + (02:12:42, 25 May 2025)
- IR 05000729/2008001 + (02:12:48, 25 May 2025)
- IR 05000410/1985048 + (02:12:52, 25 May 2025)
- ML20140D827 + (02:13:23, 25 May 2025)
- ML20140D822 + (02:13:26, 25 May 2025)
- ML20140D816 + (02:13:28, 25 May 2025)
- 05000266/LER-1997-022, :on 970507,discovered That Postulated Control Room Fire May Cause Electrical Hot Short That Disables Limit or Torque Switches for Certain Movs.Mods Initiated to Remedy Condition + (02:13:50, 25 May 2025)
- ML20140D754 + (02:14:01, 25 May 2025)
- ML20140D607 + (02:14:46, 25 May 2025)
- 05000341/LER-1997-011, :on 970507,condition Prohibited by Ts,Due to Turbine Stop Valve & Turbine Control Valve Missed Occurred. Caused by Failure to Recognize,During Development of Applicable Surveillance Procedures.Power Verified + (02:14:50, 25 May 2025)
- ML20140D434 + (02:15:39, 25 May 2025)
- ML20140D352 + (02:16:18, 25 May 2025)
- ML20140D341 + (02:16:21, 25 May 2025)
- ML20140D323 + (02:16:28, 25 May 2025)
- ML20140D277 + (02:16:42, 25 May 2025)
- ML20140D187 + (02:17:09, 25 May 2025)
- IR 05000461/1982002 + (02:17:20, 25 May 2025)
- ML20140D128 + (02:17:26, 25 May 2025)
- 05000424/LER-1997-004, :on 970322,declared Atmospheric Relief Valves (Arvs) Inoperable Due to Unqualified Cabling.Cause Unknown.Repaired ARV Splices & All Remaining ARVs in Both Units 1 & 2 Were Inspected + (02:20:54, 25 May 2025)
- 05000336/LER-1996-029, :on 960715,discovered That Evaluation for Removal of Startup Rate Trip Feature Was Potentially non-conservative.Caused by Failure to Adequately Identify Design Basis Requirements.Modified Procedures + (02:21:01, 25 May 2025)
- ML20140C762 + (02:23:08, 25 May 2025)
- NSD-NRC-97-5161, Provides Responses to Three Open Items Re Structural Issues. Monitoring of Passive Containment CW Storage Tank,Membrane Forces in Shear Walls & Types of Stirrups Used in Basemat Slab Addressed.Rev 13 of AP600 SSAR Will Include Update + (02:23:11, 25 May 2025)
- ML20140C699 + (02:23:31, 25 May 2025)
- 05000266/LER-1997-013, :on 970304,CCWS Found Not in Accordance W/ Plant Design Basis.Caused by Inoperable Valve Due to Overtorquing in Closed position.Cross-tie Will Be Resolved + (02:25:15, 25 May 2025)
- ML20140C383 + (02:25:25, 25 May 2025)
- ML20140C328 + (02:25:45, 25 May 2025)
- ML20140C250 + (02:26:11, 25 May 2025)
- IR 05000244/1985018 + (02:26:37, 25 May 2025)
- IR 05000397/1985036 + (02:27:27, 25 May 2025)
- IR 05000083/1982001 + (02:27:31, 25 May 2025)
- 05000263/LER-1997-004, :on 970220,failure to Submit Relief Requests for Limited ISI Exams Discovered.Caused by Missed Interpretation of Sections.Required Relief Requests Will Be Submitted for Limited Exams Performed in Future + (02:27:46, 25 May 2025)
- TAC:46909 + (02:27:51, 25 May 2025)
- TAC:54986 + (02:27:57, 25 May 2025)
- IR 05000206/1986004 + (02:28:12, 25 May 2025)
- 05000366/LER-1986-007, :on 860213,HPCI Steam Supply Outboard Isolation Valve 2E41-F002 Isolated Due to Unplanned Isolation Signal from Differential Pressure Transmitter.Caused by Defective Procedure.New Procedure Written + (02:30:03, 25 May 2025)
- 05000323/LER-1985-022-01, :on 851221,automatic Reactor & Turbine Trips Occurred.Caused by Loose Wiring to Feedwater Regulating Valve Solenoid & Personnel Error Causing Momentary Opening of Connection.Connection Properly Terminated + (02:30:12, 25 May 2025)
- ML20140B730 + (02:30:19, 25 May 2025)
- 05000219/LER-1985-019, :on 850821,nonconservative Direction of Main Steam Line High Flow Detectors of Established Setpoints Noted.Cause Undetermined.Correct Value Calculated,Reviewed & Implemented.Investigation Ongoing + (02:30:20, 25 May 2025)
- 05000325/LER-1985-066, :on 851222,primary Containment Group 6 Isolation Occurred.Caused by Momentary Electrical Groundpath During Calibr of Reactor Bldg Ventilation Exhaust Radiation Monitor.Review Conducted + (02:30:26, 25 May 2025)
- 05000374/LER-1986-004-04, :on 860216,reactor Scram Occurred,Resulting from Turbine Control Valve Fast Closure Following Offsite phase-to-phase Fault on Transmission Line 0101.Probably Caused by Missing Shorting Link + (02:30:30, 25 May 2025)
- 05000374/LER-1986-003-05, :on 860217,after Completing Startup Procedures, Mode Switch Moved to Run Position Instead of Shutdown Position,Resulting in ESF Actuation.Caused by Personnel Error.Switch Correctly Positioned + (02:30:32, 25 May 2025)
- 05000346/LER-1983-020-03, /03X-1:on 830428,pressurizer Sample Isolation Valve Failed to Close.Caused by Personnel Error & Inadequate Maint Procedures.Torque Switch Reset,Valve Stem Cleaned & Lubricated & Maint Order 1-83-3114-00 Rewritten + (02:30:39, 25 May 2025)
- ML20140B685 + (02:30:45, 25 May 2025)
- ML20140B676 + (02:30:49, 25 May 2025)
- ML20140B601 + (02:31:13, 25 May 2025)