Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140J253 + (01:49:50, 25 May 2025)
- ML20140J070 + (01:50:53, 25 May 2025)
- A002678, Amend to NPDES Permit GA0026786,issued to Southern Nuclear Operating Co + (01:50:57, 25 May 2025)
- ML20140J019 + (01:51:05, 25 May 2025)
- 05000302/LER-1997-003-03, Forwards LER 97-003-03 Re GL 96-01 Testing Deficiencies + (01:51:08, 25 May 2025)
- ML20140J006 + (01:51:10, 25 May 2025)
- ML20140H699 + (01:52:14, 25 May 2025)
- 05000369/LER-1997-007, :on 970514,Unit 1 RT Occurred During Power Range Nuclear Instrumentation Testing.Caused by Personnel Utilizing Inappropriate Procedure for Existing Plant Conditions.Reviewed Subject & Associated Procedures + (01:54:45, 25 May 2025)
- ML20140H403 + (01:55:12, 25 May 2025)
- 05000266/LER-1997-018, :on 970403,potential for RHR Overpressure During Accidents Was Discovered.Original Design Did Not Provide Overpressure Protection for Isolated Piping Section. Evaluation Was Performed to Determine Stress on Piping + (01:56:21, 25 May 2025)
- ML20140H105 + (01:56:24, 25 May 2025)
- 05000382/LER-1997-013, :on 970407,refueling Machine Failed to Meet TS Requirements.Caused by Failure to Assure Refueling Machines Circuitry Design Complied W/Ts.Software Controlling Overload Protection Features,Upgraded + (01:56:50, 25 May 2025)
- NPL-97-0230, Provides Documentation for Review by Staff to Support Restart Issues as Identified on Unit 2 Startup Commitment List,Per Discussions Conducted at 970131 Nrc/Wisconsin Senior Mgt Meeting + (01:58:15, 25 May 2025)
- ML20140G749 + (01:58:18, 25 May 2025)
- 05000423/LER-1997-031, :on 970507,RHR Valve Low Pressure Open Permissive Bistable Setting Was Set non-conservatively. Caused by Implementation of Incorrect Calibration Info. Re-evaluated RHR Suction/Isolation Valve LPI Calibrations + (01:58:52, 25 May 2025)
- TAC:M86396 + (01:59:07, 25 May 2025)
- NPL-97-0256, Requests Exemption from Requirements of 10CFR70.24, Criticality Accident Requirements, for Areas Designated for New Unirradiated Fuel Handling & Storage at Pbnp Units 1 & 2,per 10CFR70.14 & 10CFR70.24(d) + (01:59:22, 25 May 2025)
- NPL-97-0329, Requests Exemption for Emergency Lighting Requirement of 10CFR50 App R,Section Iii.J to Allow Use of hand-held Portable Lights for Access & Egress Routes in Particular Plant Bldgs Exterior to Main Power Block + (01:59:26, 25 May 2025)
- ML20140G334 + (02:00:08, 25 May 2025)
- ML20140G138 + (02:01:05, 25 May 2025)
- ML20140G103 + (02:01:13, 25 May 2025)
- ML20140F958 + (02:01:56, 25 May 2025)
- TAC:11311 + (02:02:07, 25 May 2025)
- ML20140F837 + (02:02:25, 25 May 2025)
- 05000336/LER-1997-009, Forwards LER 97-009-00,which Documents an Event That Occurred on 970325.Commitments Made within Ltr,Submitted + (02:03:31, 25 May 2025)
- L-83-283, Forwards Response to Request for Addl Info Re 851217 Draft Technical Evaluation Rept Written in Response to Generic Ltr 83-28,Item 1.2 Concerning Salem ATWS + (02:03:33, 25 May 2025)
- 05000354/LER-1997-005, :on 940407,TS Surveillance Test Deficiency Was Identified Due to Personnel Errors & Review Process Failures.Performed Separate Evaluation of 10CFR50.59 & Engineering Performance Issues + (02:03:50, 25 May 2025)
- ML20140F494 + (02:04:09, 25 May 2025)
- ML20140F368 + (02:04:41, 25 May 2025)
- ML20140F265 + (02:05:08, 25 May 2025)
- IR 05000259/1997003 + (02:05:58, 25 May 2025)
- TAC:52631 + (02:06:13, 25 May 2025)
- ML20140E914 + (02:07:04, 25 May 2025)
- ML20140E877 + (02:07:41, 25 May 2025)
- ML20140E747 + (02:08:24, 25 May 2025)
- ML20140E389 + (02:10:09, 25 May 2025)
- ML20140E382 + (02:10:12, 25 May 2025)
- NPL-97-0181, Annual Monitoring Rept for Jan-Dec 1996 + (02:10:18, 25 May 2025)
- DD-84-19, Order Extending Time Until 841221 for Commission to Decide Whether to Review Directors Decisions DD-84-19 & DD-84-20. Served on 841218 + (02:12:42, 25 May 2025)
- IR 05000729/2008001 + (02:12:48, 25 May 2025)
- IR 05000410/1985048 + (02:12:52, 25 May 2025)
- ML20140D827 + (02:13:23, 25 May 2025)
- ML20140D822 + (02:13:26, 25 May 2025)
- ML20140D816 + (02:13:28, 25 May 2025)
- 05000266/LER-1997-022, :on 970507,discovered That Postulated Control Room Fire May Cause Electrical Hot Short That Disables Limit or Torque Switches for Certain Movs.Mods Initiated to Remedy Condition + (02:13:50, 25 May 2025)
- ML20140D754 + (02:14:01, 25 May 2025)
- ML20140D607 + (02:14:46, 25 May 2025)
- 05000341/LER-1997-011, :on 970507,condition Prohibited by Ts,Due to Turbine Stop Valve & Turbine Control Valve Missed Occurred. Caused by Failure to Recognize,During Development of Applicable Surveillance Procedures.Power Verified + (02:14:50, 25 May 2025)
- ML20140D434 + (02:15:39, 25 May 2025)
- ML20140D352 + (02:16:18, 25 May 2025)
- ML20140D341 + (02:16:21, 25 May 2025)