Text
y
.
'.
Docket No. 50-271
Vermont Yankee Nuclear Power Corporation
ATTN:
Mr. Warren P. Murphy
Vice President and Manager
of Operations
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
Gentlemen:
Subject:
Inspection No. 50-271/85-19
This refers to your letter dated January 23, 1986 in response to our letter
dated December 31, 1985.
Thank you for informing us of the results of your review which we requested
in our letter. We will review the progress on your engineering evaluation and
hardware modifications during a subsequent inspection of your program.
Your cooperation with us is appreciatea.
Sincerely,
.
c:13 rc\\;.+- .1:12
1
cn,c e r. :r
-
Thomas T. Martin, Director
Division of Radiation Safety
and Safeguards
cc:
R.'W. Capstick, Licensing Engineer
W. F. Convay, President and Chief Executive Officer
J. P. Pelletier, Plant Manager
~ Donald Hunter, Vice President
Public Docurent Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Hampshire
State of Vermont.
8604040245 860327
ADOCM 05000271
G
veric1AL RECORD COPY
RL VY 85-19 - 0001.0.0
03/12/86
I\\
I E '. oi
.
.
..
.,
Vermont Yankee Nuclear Power Corp.
2
MAR 2 71986
,
1
bcc:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP
M. McBride, SRI, Pilgrim
H.'Eichenholz, SRI, Yankee
V. Rooney, LPM, NRR
.
RI:
RI . RSS
Madde/fi
Kelmig
03//3 /86
03//3/86
,
OFFICIAL RECORD COPY
RL VY-85-19 - 0002.0.0
03/12/86
-
-
---. .
. .
.
. - -
/"~
("}
L)/
U
e. ,
_a
-
. ' VERMONT YANKEE
,
-
, NUCLEAR POWER CORPORATION
RD 5, Box 169, Ferry Road, Brattleboro, VT 05301
.
y
hg[
'
ENGINEERING OFFICE
1871 WORCESTER ROAD
FRAMINGHAM. M ASSACHUSETTS 01701
TELEPHopeE 6174724100
January 23, 1986
U.S. Nuclear Regulatory Commission
Office of Inspection and Enforcement
Region I
631 Park Avenue
.
King of Prussia, PA 19406
Attention:
Dr. Thomas E. Murley
Regional Administrator
References:
a)
License No. DPR-28 (Docket No. 50-271)
b)
Letter, USNRC to VYNPC, NVY 85-275, dated 12/31/85
c)
Letter, VYNPC to USNRC, FVY 85-92, dated 10/04/85
Dear Sir:
Subject:
Supplemental Information Pertaining to
Inspection No, 50-271/85-19
In response to your letter of December 31, 1985 (Reference (b)], we have
reviewed the schedule identified in our October 4, 1985 letter (Reference (c)]
regarding the implementation of certain hardware modifications. We have
concluded that we are unable to expedite the schedule for the following reasons:
1)
The engineering evaluation to determine the exact scope of the
necessary hardware modification is in progress and is presently being
done on an expedited schedule.
2)
We cannot finalize the schedule for completing the hardware modifica-
tion until the engineering evaluation is completed.
In addition, a
detailed design change package has to be developed and approved prior
to,the actual modification taking place.
As stated in our October 4 letter, we believe the current schedule is
justified since interim measures have been implemented which assure CAS-SAS
,
monitoring effectiveness until the permanent modification is made.
In addition,'
we will submit a temporary change to our Physical Security Plan within ten (10)
.?
days which formally incorporates the interim compensatory measures described in
our October 4 letter.
'
..
- *~7"T1 v v /
'
'
.
Q
..
-.
,
-
b
VERMONT YANKEIhdUCLEAR POWER CORPORATION
,
,
g
U.S. Nuclear Regulatory Commission
January 23, 1966
Page 2
Based on the above, we believe that the current schedule for completing the
necessary hardware modifications is justified. However, should you have any
questions or desire additional information, please contact Mr. James B.
Sinclair, Security Supervisor, at our plant site.
Very truly yours,
WarrenP.lMurphyN'*g*U
_
"
Vice President and
Manager of Operations
WPM /RP/de:sp4.1
!