Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RNP-RA/06-0014, Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power + (01:21:17, 24 November 2019)
- NLS2006008, Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power, Dated February 1, 2006 + (01:26:56, 24 November 2019)
- ML060940307 + (01:27:55, 24 November 2019)
- ML060940180 + (01:29:22, 24 November 2019)
- ML060940176 + (01:29:27, 24 November 2019)
- ML060940170 + (01:29:30, 24 November 2019)
- ML060940166 + (01:29:32, 24 November 2019)
- ML060940135 + (01:29:41, 24 November 2019)
- NOC-AE-06001985, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-44) + (01:34:35, 24 November 2019)
- NOC-AE-06001995, Organization Changes as Described in the Operation Quality Assurance Plan + (01:35:50, 24 November 2019)
- ML060870178 + (01:43:05, 24 November 2019)
- ML060870144 + (01:43:17, 24 November 2019)
- SBK-L-06044, Notification of Deviation from MRP-139 Inspection Requirement + (02:04:31, 24 November 2019)
- NRC 2006-0023, Supplement to 60-Day Response to Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. + (02:04:52, 24 November 2019)
- ML060680434 + (02:16:49, 24 November 2019)
- ML060680387 + (02:17:08, 24 November 2019)
- NOC-AE-06001982, Response to Request for Additional Information Regarding the IRE12 Refueling Outage Inservice Inspection Results for Steam Generator Tubing + (02:27:08, 24 November 2019)
- ML060650461 + (02:29:26, 24 November 2019)
- HNP-06-029, Day Response to NRC Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications. + (02:43:38, 24 November 2019)
- LR-N06-0054, Response to NRC Generic Letter 2006-01: Steam Generator Tube Integrity and Associated Technical Specifications + (02:43:44, 24 November 2019)
- ML060590515 + (02:49:29, 24 November 2019)
- L-2006-042, 30-day Response to NRC Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications, January 20, 2006 + (03:06:17, 24 November 2019)
- RC-06-0038, 30-Day Response to NRC Generic Letter 2006-01 Steam Generator Tube Integrity and Associated Technical Specifications + (03:06:50, 24 November 2019)
- RNP-RA/06-0013, Response to NRC Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications. + (03:08:32, 24 November 2019)
- ML060520462 + (03:10:31, 24 November 2019)
- ML060520435 + (03:10:36, 24 November 2019)
- NOC-AE-06001978, Semiannual Fitness for Duty Program Performance Report for the Second Half of 2005 + (03:10:51, 24 November 2019)
- LIC-06-0011, Day Response to Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications + (03:11:45, 24 November 2019)
- L-HU-06-006, Nuclear Management Company 30-Day Response to Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications. + (03:14:05, 24 November 2019)
- RS-06-023, Exelon/Amergen Response to NRC Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications. + (03:14:08, 24 November 2019)
- L-06-019, Response to Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications + (03:15:05, 24 November 2019)
- ML060480030 + (03:16:34, 24 November 2019)
- NL-06-0252, Response to NRC Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications. + (03:25:33, 24 November 2019)
- RC-06-0030, Supplemental Response to NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (03:28:05, 24 November 2019)
- ULNRC-05253, Additional Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors. + (03:34:06, 24 November 2019)
- NOC-AE-06001968, Supplement 2 to the Response to Generic Letter 2004-02 + (03:37:44, 24 November 2019)
- L-2006-006, December 2005 Monthly Operating Report for Turkey Point Units 3 and 4 + (03:47:40, 24 November 2019)
- L-2006-028, Supplement to Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors + (03:48:23, 24 November 2019)
- NOC-AE-05001952, Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 1 + (03:51:54, 24 November 2019)
- NOC-AE-06001960, Inservice Inspection Summary Report + (03:52:58, 24 November 2019)
- NRC Generic Letter 2006-01 + (04:06:45, 24 November 2019)
- NRC 2006-0013, Supplement to 60-Day Response to Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. + (04:08:14, 24 November 2019)
- NRC Generic Letter 2006-02 + (04:10:47, 24 November 2019)
- NRC Generic Letter 2006-03 + (04:35:03, 24 November 2019)
- NL-05-133, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (04:38:21, 24 November 2019)
- ML053260557 + (04:48:13, 24 November 2019)
- ML052710219 + (04:58:30, 24 November 2019)
- ML052710145 + (04:58:48, 24 November 2019)
- ML052420507 + (05:06:29, 24 November 2019)
- TAC:D91736 + (05:10:19, 24 November 2019)
- TAC:D91617 + (05:10:53, 24 November 2019)