Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:00022 + (16:03:06, 24 May 2025)
- ML20154M564 + (16:03:17, 24 May 2025)
- ML20154M547 + (16:03:24, 24 May 2025)
- L-98-203, Application for Amend to License NPF-73,incorporating Temporary License Condition That Would Extend TS Surveillance Interval,Specified in Surveillance Requirement 4.8.1.1.1.b to First Entry Into Mode 4 After Cycle 7 RFO + (16:03:59, 24 May 2025)
- 05000413/LER-1998-015-01, Forwards LER 98-015-01, TS Required Shutdown & Operation Prohibited by TS Associated with Ice Condenser. Rev 0 to Ler,Dtd 980902,contained Abstract Since Event Investigation Had Not Been Completed.Rev 1 Contains All 10CFR50. + (16:04:10, 24 May 2025)
- ML20154M370 + (16:04:21, 24 May 2025)
- ML20154M364 + (16:04:23, 24 May 2025)
- ML20154M243 + (16:05:45, 24 May 2025)
- 05000423/LER-1998-038, :on 980915,manual Reactor Trip Was Initiated When Condensate Pump Discharge Conductivity Exceeded Limits Allowed by Ts.Caused by Failure of Implementing Procedure to Fully Address All Design Conditions.Revised Procedures + (16:06:03, 24 May 2025)
- ML20154M160 + (16:07:23, 24 May 2025)
- ML20154M087 + (16:07:47, 24 May 2025)
- ML20154M025 + (16:08:07, 24 May 2025)
- 05000423/LER-1998-037, :on 980910 & 18,both SE Trains Were Declared Inoperable Due to Failure of Cvs Associated with Injection of Sodium Hypochorite.Caused by Inadequate Work Practice. Sodium Hypochlorite Injection Point Was Isolated + (16:08:24, 24 May 2025)
- IR 05000315/1997017 + (16:08:32, 24 May 2025)
- 05000424/LER-1998-001-02, Forwards LER 98-001-02 Re Discovery of Concrete Degradation in DG Exhaust Stacks.Completion Date for Implementation of New Design Is Being Changed from 981015 to 1115 Due to Design & Installation Problems + (16:08:45, 24 May 2025)
- 05000498/LER-1998-007, :on 980915,failure to Perform Quarterly Surveillance of Td Afp.Caused by Inadequate on-shift Surveillance Test Preparation.Checklist Was Developed for Surveillance Preparation,Performance & Review Requirements + (16:08:53, 24 May 2025)
- ML20154L797 + (16:09:09, 24 May 2025)
- ML20154L755 + (16:09:26, 24 May 2025)
- ML20154L705 + (16:09:44, 24 May 2025)
- 05000266/LER-1998-026, :on 980914,determined That Operation of Potential Dilution in Progress Alarm Was Not Controlled IAW Ts.Caused by Failure to Address Plant Heatup Procedures. Revised Procedure OP-1A, Cold Shutdown to Hot Shutdown + (16:11:02, 24 May 2025)
- ML20154L422 + (16:11:30, 24 May 2025)
- ML20154L410 + (16:11:33, 24 May 2025)
- ML20154L406 + (16:11:36, 24 May 2025)
- ML20154L395 + (16:11:39, 24 May 2025)
- L-98-198, Requests Withdrawal of LARs 242 & 113 Which Were Submitted on 970310,to Allow Use of Framatome SG Sleeving Methodology on Permanent Basis + (16:11:49, 24 May 2025)
- TAC:MA3711 + (16:12:15, 24 May 2025)
- ML20154L232 + (16:12:29, 24 May 2025)
- ML20154L175 + (16:13:01, 24 May 2025)
- ML20154L161 + (16:13:05, 24 May 2025)
- 05000361/LER-1998-018, :on 980909,ECCS Was Inoperable Due to Inadequate Surveillance Test.Cause Was Not Determined Due to Length of Time.Ts SR 3.0.3,required Surveillance Tests Were Successfully Completed + (16:13:06, 24 May 2025)
- IR 05000298/1988200 + (16:13:52, 24 May 2025)
- ML20154L014 + (16:14:14, 24 May 2025)
- ML20154K898 + (16:14:42, 24 May 2025)
- ML20154K796 + (16:15:15, 24 May 2025)
- ML20154K785 + (16:15:18, 24 May 2025)
- ML20154K781 + (16:15:20, 24 May 2025)
- ML20154K731 + (16:15:29, 24 May 2025)
- ML20154K460 + (16:15:46, 24 May 2025)
- ML20154K313 + (16:16:33, 24 May 2025)
- ML20154K230 + (16:16:55, 24 May 2025)
- ML20154J989 + (16:17:51, 24 May 2025)
- ML20154J988 + (16:17:52, 24 May 2025)
- ML20154J887 + (16:18:29, 24 May 2025)
- ML20154J736 + (16:19:27, 24 May 2025)
- IR 05000483/1985024 + (16:19:39, 24 May 2025)
- 05000352/LER-1998-018, :on 980911,potential Loss of EDG Control in Event of Fire,Was Determined.Caused by fire-induced Damage to Unprotected Voltage & Speed Control Cables.Ncr 98-02422 Was Generated to Disposition Identified Deficiencies + (16:19:55, 24 May 2025)
- TAC:51141 + (16:21:25, 24 May 2025)
- ML20154J387 + (16:21:27, 24 May 2025)
- ML20154J304 + (16:22:16, 24 May 2025)
- ML20154J031 + (16:25:11, 24 May 2025)
- ML20154J022 + (16:25:14, 24 May 2025)