Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-254/98-12 & 50-265/98-12 Issued on 980811.Since New Info Shows That Condition Corrected,No Violation of 10CFR50.59 Occurred
ML20154L422
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 10/09/1998
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
References
50-254-98-09, 50-254-98-12, 50-254-98-9, 50-265-98-09, 50-265-98-12, 50-265-98-9, EA-98-388, NUDOCS 9810190284
Download: ML20154L422 (3)


See also: IR 05000254/1998012

Text

, ,

,m

. . . . - .

.

__

.

.

. . . . . . -

..-.m

_ . . , -.- -- ___ - ..

.~ -.

'; *' <

>

,

,

r

b

>% Eug

UNITED STATES

,/

k-

NUCLEAR REGULATORY COMMISSION

4

58'

'y

801 WARRENVILLE ROAD

o

REGloN 118

"E

e

LISLE, ILLINOIS 60532-4351

--T.,*****f

October 9, 1998

1

l-

EA 98-388 -'

i

Mr. Oliver D. Kingsley

[

President, Nuclear Generation Group

r'

Commonwealth Edison Company

ATTN: Regulatory Services

. Executive Towers West lil

l

1400 Opus Place, Suite 500

'

' Downers Grove, IL 60515

l

>

SUBJECT:

NOTICE OF VIOLATION (QUAD CITIES INSPECTION

'

,

r

REPORT 50-254/98012(DRP); 50-265/98012(DRP))

-

Dear Mr. Kingsley:

'

This will' acknowledge receipt of your letter deted September 10,1998, in response to our letter

dated August 11,1998, transmitting a Notice of Violation associated with inspection -

Report 50-254/98012(DRP); 50-265/98012(DRP).

'

In. your response to Violation 50-265/98012-05, a 10 CFR 50.59 violation regarding equipment

not meeting the National Electric Manufacturers Association standard for minimum running

,

voltage, you provided additional information that.was not made available during the inspection.

Specifically, a calculation (QDC-7800-E-0192) had been performed that showed the motors for

. the 2C and 2D residual heat removal service water pump room cooler ventilation fans would

i

meet the < National Electric Manufacturers Association standard and, in May 1997, the power -

feed cable to' MCC 29-2 was replaced which increased the minimum running voltage for the

Unit 2 emergency diesel generator cooling water pump. This new information showed that the

UFSAR discrepancy had been corrected at the first available opportunity after discovery of the

r

condition. Since the new information 3 hows that the condition was corrected, no violation of

f

,

10 CFR 50.59 occurred, and the violation is being retracted. in discussions with the

9

'

- engineering staff, we learned that the new infonTiation was discovered during the preparation of

the response to the notice of violation. However, there were numerous opportunities for your

~

staff to provide this information prior to the issuance of the violation. The issue of the UFSAR

discrepancy was first raised as a , Unresolved item in inspection Report 50-254/98009;

'

50-265/98009,1 and the issue was discussed at both the exit meetings for that report and for

inspection Report 50-254/98012; 50-265/98012. If this new information had been available

After the identification of the discrepancy in inspection Report 50-254/98009; 50-265/98009, the

unresolved item would have been closed and no violation issued. Therefore, in the future, we

t

would encoura9e timely resolution of identified unresolved issues in order to minimize the

impact of enforcement related issues on the staff of Comed and the NRC.

,

!.

L

'

.

'9810190284'981009

PDR

ADOCK O

24

{

4

-

n

F

..

,

- . _ . . . , . -

. . . _

. _ .

. _

_ _ _

_

. _ _ . . . . . _ - _ _ . _ _ _ . . _ . _

.

. ..

,

l

O. Kingsley

' 2-

-

l ..

. With respect to the three other violations associated with inspection

l

Report 50-254/98012(DRP); 50-265/98012(DRP), we have reviewed your corrective actions

j:

and have no further questions'at this time. These corrective actions will be examined during

l.

future inspections.

No response to this letter is required. In accordance with'10 CFR Part'2.790 ef the NRC's

i.

'

- " Rules of Practice," a copy of this letter will be placed in the NRC Public Docuraent Room.

Sincerely,

L

l

./s/ Mark A.-Ring

L

1

Mark Ring, Chief

Reactor Proje. cts Branch 1

b

Docket Nos.: 50-254; 50-265

l

'

License Nos.'; DPR-29; DPR-30

,

cc:

D. Helwig, Senior Vice President

. "

' H. Stanley, PWR Vice President

' C. Crane, BWR Vice President

R. Krich, Regulatory Services Manager

D. Greene, Licensing Director'

i

DCD - Licensing

J. Dimmette, Jr., Site Vice President

W. Pearce, Quad Cities Station Manager

C. Peterson, Regulatory Affairs Manager

R. Hubbard

M. Aguilar, Assistant Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

W. Leech, Manager of Nuclear

,

MidAmerican Energy Company

i

L

l

!

' DOCUMENT NAME: G:\\ QUAD lQUA98012.TY -

To receive a copy of this document, indicate in the box "C" = Copy w/o attach /enci"E" =

[

Copy w/ attach /enci "N" = No copy

l

OFFICE

Rlli

lC

Rlli

_lC

Rill

16

l

,

.

l

NAME

Lerch/ml@n-

Clayton /k-

RingT(/

DATE

10/9/98

10/9'/98

10/q/98

,

i

OFFICIAL RECORD COPY

1

i.

.

4

_

-.

_

_

__

_

...

.

. _ _ _ . . . . ..

.

. _ _

__ ,

- . . ._ -.._. .. . .- ._. .

. c

, - . -

.

i

O. Kingsley

-3-

i

i

Distribution:

J. Lieberman, OE

J. .Goldberg, OGC

B. Boger, NRR

' Project Mgr.; NRR

J. Caldwell, Rlli

C. Pederson, Rill '

. B. Clayton, Rill

- i

. SRI Quad Cities -

DRP

--TSS

. DRS (2)

Rill PRR

PUBLIC IE-01

' Docket File

. GREENS

.

e

-

l

l

p.

l

I-

I

'

]

'q

r

4

8

'

u v

,o

^ ( '.'

.

.

--

_e