LEP 081933
,
!
Docket No. 50-293
License No OPR-35
,
l
Boston Edison Company
n
ATIN: Mr. Ralph G. Bird
L
Senior Vice President - Nuclear
i
'
803 Boylston Street
i
Boston, Massachusetts
02199
Gentlemen:
[
Subject:
Inspection No. 50-293/88-29
l
This letter refers to the special s nfety iMpection conducted by Dr. Walter J.
I
Pasciak and Mr. James Kottan of this office on August I M O, 1938, at the
j
Pilgrim Nucle v Power Station, Plymouth, Massachusetts, of activities
i
j
authorized by NRC License No. OPR-35 and to the discussions of our findings
held by Dr. Pasciak,with you at the conclusion of the inspection.
'
I
Areas examined during this inspection are described in the GRC Region !
Inspection Report which is enclosed with this letter. We are concerned that
measures taken to protect the onsite contaminated dirt storagc pile may not be
adequate to prevent potential rain and wind erosis.t. We request that you
respond to us in writing and outline corrective steps which will be taken to
a
protect the contaminated dirt from wind and rain erosion and when these
j
corrections will be in place.
Within the scope of this inspection, no violations were observed.
'
i
Your cooperation with us in this matter is appreciated,
t
l
Sincerely,
[
f
l
Ohna' Sign:d cy-
I
R WJ R. Gwlanj
l
i
!
Ronald R. Bellamy, Chief
I
facilities Radiological Safety
,
and Safeguards Branch
!
'
Division of Radiation Safety and
Safeguards
i
Enclosure:
NRC Region ! Inspection Report No. 50-293/88-29
l
,
f
1
t
I
I
t
,
1
,
j
OFFICIAL RECORD COPY
AI 8S-138 - 0001.0.0
08/23/83
e ~'='
'n
I
f,I h"
k#
sso9220321 eso90s
AD0CK 05000193
g tL.
'
Q
FDC
I
-
_______
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
'
.
.
Boston Edison Company
2
septs y
ec w/ encl:
K. Highfill, Station Director
R. Anderson, Plant Manager
J. Keyes, Licensing Division Manager
E, Robinson, Nuclear Information Manager
R. Swanson, Nuclear Engineering Department Manager
lhe Honorable Edward J. Markey
The Honorable Edward P. Kirby
The Horiorable Pettr V. Forman
B. McIntyre, Chairman, Department of Public Uttitties
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Plymouth Civil Defense Director
P. Agnes, Assistant Secretary of Public Safety,
Commonwealth of Massachusetts
S. Pollard, Massachusetts Secretary of Energy Resources
R. Shimshak, MAS $P!kG
Public Document Room (POR)
local Public Document Room (LDPR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of M m achusetts (2)
bec v/ encl:
Region ! Docket Room (w/ concurrences)
Management Assistant
R. Blough, DRP
L. Doerflein, ORP
0. Mcdonald, FM, NRR
PA0 (15) Salp Reports and All Inspection Reports
R. Bores, OR$$
S. Collins, ORP
h(
i
RI:0RSS
h:
)Wiggins
!:0RP
RI:0R$$
Kottan/cy/slj
Pas iak
Bellamy
8/$/83
f/fl/83
8/)l/83
f
' /83
0FFICIAL RECORD COPY
Al SS-138 - 0002.0.0
03/23/83
.
.
l