Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000336/LER-1999-009, :on 990525,manual RT Due to Steam Leak in Turbine Bldg Was Noted.Caused by Inadequate Controls.Refined Controls for Adjusting FW Heater String Controls + (11:51:56, 24 May 2025)
- ML20196G516 + (11:52:40, 24 May 2025)
- ML20196G491 + (11:52:49, 24 May 2025)
- NUREG-1338, Responds to Ltr to Wd Travers, Re Small,Modular, pebble-bed Reactor Design.Some Background Info & Guidance on Licensing gas-cooled Reactor Designs Can Be Found in NRC Staff repts;NUREG-1226,NUREG-1338 & NUREG-1512 + (11:53:14, 24 May 2025)
- ML20196G402 + (11:53:24, 24 May 2025)
- TAC:MA0555 + (11:54:28, 24 May 2025)
- IR 05000220/1999004 + (11:55:50, 24 May 2025)
- TAC:M93436 + (11:56:38, 24 May 2025)
- TAC:MA1845 + (11:57:00, 24 May 2025)
- 05000289/LER-1999-006, :on 990525,inability of Pressurizer Support Bolts to Meet FSAR Requirements,Was Determined.Cause Not Identified.Performed Operability Review & Determined That Pressurizer Would Remain Operable Under Design Conditions + (11:57:02, 24 May 2025)
- TAC:MA5059 + (11:57:37, 24 May 2025)
- L-99-080, Application for Amend to License NPF-73,updating TS Heatup, Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 Efpys.Proprietary LTOP Sys Setpoint Review, Encl.Proprietary Info Withheld,Per 10CFR2.709 + (11:58:02, 24 May 2025)
- ML20196F606 + (11:58:22, 24 May 2025)
- ML20196F546 + (11:58:39, 24 May 2025)
- 05000412/LER-1988-002, :on 880127,reactor Tripped & Control Room Emergency Bottled Air Pressurization Sys Actuation Occurred. Caused by Reactor Coolant Pump 21A Trip on Undervoltage Due to Loss of Bus 2A.Transmitter Calibr + (12:00:35, 24 May 2025)
- 05000317/LER-1988-010, :on 880628,containment Personnel Air Lock Interlock Discovered Inoperable During Performance of Surveillance Test Procedure.Caused by Improper Use of Procedure W/Lack of Clarity.Training Provided + (12:01:13, 24 May 2025)
- ML20196F291 + (12:01:18, 24 May 2025)
- NPL-99-0369, Application for Amends to Licenses DPR-24 & DPR-27 to Reflect Required Changes to TS as Result of Using Upgraded Fuel at plant.Non-proprietary,WCAP-14788 & Proprietary WCAP- WCAP-14787 Repts Encl.Proprietary Rept Withheld + (12:01:20, 24 May 2025)
- ML20196F269 + (12:01:27, 24 May 2025)
- 05000423/LER-1998-043, :on 981028,manual RT Was Noted.Caused by High Conductivity in Condensate Sys.Leaking Condenser Tube in C Waterbox Was Plugged + (12:01:31, 24 May 2025)
- ML20196F229 + (12:01:41, 24 May 2025)
- ML20196F205 + (12:01:48, 24 May 2025)
- L-99-062, Forwards Final TS Pages for LARs 262 & 135,including Summary Description of Plants Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages + (12:02:50, 24 May 2025)
- ML20196E965 + (12:03:05, 24 May 2025)
- 05000458/LER-1999-012, :on 990520,inadequate Surveillance Testing of DG Trip Functions,Was Discovered.Caused by Improper Implementation of Its.Comparison of Other DG Surveillance Requirements to Info in TS Bases Will Be Completed + (12:05:37, 24 May 2025)
- ML20196E488 + (12:05:43, 24 May 2025)
- ML20196E438 + (12:06:03, 24 May 2025)
- ML20196E366 + (12:06:57, 24 May 2025)
- ML20196E349 + (12:07:01, 24 May 2025)
- ML20196E341 + (12:07:04, 24 May 2025)
- ML20196E304 + (12:07:13, 24 May 2025)
- ML20196E082 + (12:08:33, 24 May 2025)
- ML20196E026 + (12:08:50, 24 May 2025)
- ML20196E022 + (12:08:53, 24 May 2025)
- ML20196D648 + (12:10:37, 24 May 2025)
- ML20196D446 + (12:11:36, 24 May 2025)
- ML20196D310 + (12:12:23, 24 May 2025)
- ML20196D159 + (12:14:06, 24 May 2025)
- ML20196D151 + (12:14:08, 24 May 2025)
- ML20196D072 + (12:14:50, 24 May 2025)
- 05000277/LER-1999-004, :on 990521,multiple Unplanned Esfas Occurred During Planned Electrical Bus Restoration Following Maint Activities.Caused by Inadequate Configuration Control.Power Was Restored to 3E Transformer Per Plant Procedures + (12:16:24, 24 May 2025)
- ML20196C871 + (12:16:39, 24 May 2025)
- ML20196C864 + (12:16:41, 24 May 2025)
- 05000341/LER-1988-004, :on 880110,north Reactor Feed Pump Speed Control Failed Resulting in Low Reactor Vessel Water Level. Caused by Overvoltage Trip for Power Supply.Failed Power Supply Replaced + (12:16:46, 24 May 2025)
- ML20196C789 + (12:17:02, 24 May 2025)
- ML20196C528 + (12:18:27, 24 May 2025)
- 05000336/LER-1997-023-01, Forwards LER 97-023-01 Documenting non-conservative HPSI Flow Assumptions That Were Identified at Mnps,Unit 2,on 970612.LER Supplement Provides Results of re-evaluation of Affected Accident Analysis,Concluding That Criteria + (12:18:35, 24 May 2025)
- 05000254/LER-1998-024, :on 981022,noted That TS LCO Was Not Met When PCIV Was Made Inoperable by Maint.Caused by Improper Authorization to Start Work.Operations Completed Required Testing for 1-1601-21 PCIV on 981022 + (12:19:28, 24 May 2025)
- 05000482/LER-1997-026, :on 971109,heavy Loads Moved in Containment Outside of Heavy Load Analysis Requirements.Caused by Procedural Inadequacy.Revised Controlling Procedure + (12:20:09, 24 May 2025)
- 05000362/LER-1997-003-01, Forwards LER 97-003-01 Re Out of Tolerance Condition Identified During Testing of Pressurizer Safety Valve Setpoints.Ler Contains No New Commitments + (12:20:41, 24 May 2025)
- ML20196C132 + (12:21:52, 24 May 2025)