7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHEAST NUCLEAR ENERGY COMPANY ET AL.
x DOCKET NO. 50-336 NOTICE OF ISSUANCE OF AMENDMENT TO FACTI.ITT M UtATIYG LICENSE The U.S. Nuclear Regulatory Comission (the Comission) has issued Amendment No.124 to Facility Operating License No. DPR-65, to Northeast Nuclear Energy Company, The Connecticut Light and Power Company, and Western j
Massachusetts Electric Company, which revised the Technical Specifications for
. operation of the Millstone Nuclear Power Station, Unit No. 2, located'in the Town of Waterford, Connecticut. The amendment was effective as of the date of its issuance.
The amendment provides changes to the Technical Specification (TS) 4.6.1.2, "Containment Leakage" as follows:
(1)thereferencetoANSIStandardN45.4-1972 is deleted and (2) the error analysis requirements are modified to allow the use of alternate methods. In con.juction with an exemption to the requirements or 10 CFR Part 50, Appendix J.Section III.A.3, the above changes to the TS allow for use of ANSI /ANS Standard 56.8-1981 for "mass point" determination of containnent leakage rate and for addressing the inherent errors associated with such testing.
The application for the amendnent complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.
0*0 aff-
2 1
Notice of Consideration of Issuance of Amendment and Opportunity fer Prior Hearing in connection with this action was published in the FEDERAL PEGISTER on January 12, 1988 (53 FR 766).
No request for a hearing or petition for leave to intervene was filed following this notice.
The Comission has prepared an Environmental Assessment and Finding of No Significant Impact related to the action and has concluded that an cnvironn. ental impact statement is not warranted because there will be no environmental impact attributed to the action beyond that which has been predicted and described in the Commission's Final Environtrental Statement for the facility dated June 1973.
For further details with respect to this action, see (1) the application for amendment dated December ?8,1987, as supplemented by letter dated January 5,1988,(2) Amendment No. 124 to Facility Operating License No. DRP-65, and (3) the Environmental Assessment and Finding of No Significant Impact (53FR3801). All of these items are available for public inspection at the Comission's Public Document Room,1717 H Street, N.W., Washington, D.C., and at the Waterford Public Library, 49 Rope Ferry Road, Waterford, Connecticut. A copy of items (2) and (3) may be obtained upon request addressed to the U.S.
Nuclear Regulatory Comission, Washington, D. C. 70555, Attention:
- Director, Division of Reactor Projects I/II.
Dated at Rockville, Maryland, this lith day of February,1988.
FOR THE NUCLEAR REGULATORY COMMISSION e
,\\ Qu David H. M fd, Projec Manager Project Directorate I-A Division of Reactor Projects 1/II