ML20196D072
| ML20196D072 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 02/09/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Trevors G NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| EA-87-237, EA-88-002, EA-88-2, NUDOCS 8802170008 | |
| Download: ML20196D072 (5) | |
See also: IR 05000298/1987027
Text
,.
. - _
_ _ _ .
..
.
.
In Reply Refer To:
Docket:
50-298/87-27
FEB
9 M
50-298/87-31-
,
50-298/87-32
EA 87-237, 88-02
~,
Nebraska Public Power District
ATTN:- George A. Trevors
Division Manager - Nuclear Support
P.O. Box 499
Columbus NE
68601
Gentlemen:
This refers to the Enforcement Conference conducted in the NRC Region IV
office on January 28, 1988, with you and other members of your staff, and
Region IV and Office of Nuclear Reactor Regulation personnel. This conference
was related to the findings of NRC inspections conducted during the periods
.
October 26-29, November 1-30, and December 1-21, 1987, which were documented
in our NRC Inspection Reports 50-298/87-27, 87-32, and 87-31, dated
December 30, 1987, January 11, and January 8,1988.
f
The subjects discussed at this meeting are described in the enclosed Meeting
Sumary.
t
.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter. will be placed in
the NRC's Public Document Room.
'
Should you have any questions concerning this matter, we will be pleased to
i
'
discuss them with you.
Sincerely,
?$h at
Y
4 8.Beacli v
s$MjNj$WZv3
t
L. J. Callan,. Director
Division of Reactor Projects
Enclosure:
Meeting Sumary
cc w/ encl: (see next page)
DAP6w[ers
E0 d
RIV:DRP/C
LJCallan
EJHoller:gb
A/f/88
A /5 /88
2/ 9/88
/
/!Yb
i
,
8802170000 800209
ADOCK 05000298
g\\
8
Q
PDH
. - _
. . ,
. - --
.
- . -
. ,
. . - ,
--
-
.
.
_ .
.
.
..
,
R
d
Nebraska Public Power District
2
3
cc w/ enclosure:
Cooper Nuclear Station
ATTN: Guy Horn Division Manager
of Nuclear Operations
P.O. Box 98
Brownville, Nebraska
68321
il
Kansas Radiation Control Program Director
,
'
Nebraska Radiation Control Program Director
!
Cooper Nuclear Station
ATTN: Guy Horn, Division Manager.
of Nuclear 6gerations-
!
P.O. Box 98
Brownville, Nebraska
68321
.
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec to DMB (IE45)
bec distrib. by RIV:
i
- RR1
R. D. Martin, RA
.
- SectionChief(DRP/C)
Lisa Shea, RM/ALF
RPSB-DRSS
- RIV File
- Project Engineer, DRP/C
- W. Long, NRR Project Manager
- DRS
- DRP
J
D. Powers
I
l
q
l
-
l
I
!
l
l
l
,
J
i
1
,-. ..
,
,_.
-
, _ . _ , . _ _ , ,
,~
_
_
. _ _ . . , _
,
_ _ _ - _ _ _ _
_.
L
> .
s
ATTACHMENT
NEBRASKA PUBLIC POWER DISTRICT
JANUARY 28, 1988
MEETING SUMMARY
Licensee:
Nebraska Public Pnwer District (NPPD)
Facility:
CooperNuclearStemon(CNS)
License:
DRP-46
Docket:
50-237
SUBJECT:
ENFORCEMENT CONFERENCE CONCERNING NRC INSPECTION FINDINGS
(Inspection Reports 50-298-87-27, 87-31, and 87-32)
l
On January 28,1988, representatives of Nebraska Public Power District met in
Arlington, Texas, with NRC Region IV and NRR personnel to discuss the findings
documented in NRC Inspection Reports dated December 30, 1987, January 8, and
January 11, 1988.
The attendance list and licensee material presented at the
conference are attached. The meeting was held at the request of NRC, Region IV.
The NRC discussed its concern regarding security matters as described in NRC
Inspection Reports 50-298/87-27. and 87-32 and its concern regarding design
review of a motor operated valve installed to bypass the Drywell Exhaust
Inboard Isolation Valve as described in NRC Inspection Report 50-298/87-31.
The licensee discussed the security matters and the design review of the
bypass valve, including how the items were discoverd, their safety
significance, and co rective actions taken by the licensee.
I
Enclosures:
1.
Attendance List
2.
NPPD '4aterial Presented at Conference
- - -
_ _ _ _ .
-
. . . .
ENCLOSURE 1
ENFORCEMENT CONFERENCE ATTENDANCE LIST - REGION IV
NE8RASKA PUBLIC POWER DISTRICT
NRC Attendecs:
L. Callan Director, Division of Reactor Projects
R. Bangart, Director, Division of Radiation Safety and
Safeguards
J. i411hoan, Director, Division of Reactor Safety
I. Barnes, Chief, Materials and Quality Programs Section
R. Everett, Chief, Plant Security Section
D. Hunter, Chief. Technical Support Staff
.<
L. Yandell, Chief, Radiation Protection Safety Branch
E. Holler, Chief, Projects Section C
W. Bennett, Senior Resident Inspector
G. Madsen, Reactor Inspect :a
?
-D. Powers, Enforcement Of " er
,
'
H. Scott, Enforcement Starf
W. Long, Project Manager, NRR
Licensee Attendees:
H. G. Parris, Vice President, Production
L. G. Kuncl, Manager, Nuclear Power Group
t
G. R. Horn, Division Manager, Nuclear Operations
G. A. Trevors, Manager, Nuclear Support
R. E. Wilbur, Division Manager, Nuclear Engineering
,
and Construction
V. L. Wolstenholm, Division Manager, Quality
Assurance
!
M. D. Hamm Security Supervisor, Cooper Nuclear
Station
J. M. Pilant, Manager, Configuration Management
J. M. Meachem, Senior Manager, Technical Support
G. S. McClure, Engineering Management Department
[
i
i
e
1
(
!
l
,
-
..
...
.
.-
-
-
.-
COOPER NUCLEAR STATION SECURITY PROCEDURES
.
.
.
, SECURITY OPERATIONAL PROCEDURE
SP 2.6
VEHICLE ENTRY / EXIT
,
, ,,
,
j
Attachment A
SP 2.6
,
VEHICLE ENTRY GATE PASS
l
Each vehicle, except Emergency vehicles, that enters the protected area will require
i
completion of this form.
1.
Vehicle entrance approved by:
Driver's Names
2.
Ask driver if any of the following items are aboard the vehicles weapons;
drugs; alcohol; ammunition; explosives; incendiary devices;_ photographic
equipment.
Explain to driver that items will be returned if declared but if
!
items are not declared and found during scarch, access will be deni'._
3.
Driver response is yes/no.
If yes, remove the items and issue the driver a
receipt for the items. Secure the items in vault.
If no, continue checklist.
!
4.
Conduct vehicle search:
( ) Under carriage
(
) Cab
,
(
) Engine compartment
(
) Cargo area
'
-
J
j
5.
Contraband items found in search:
(
) Yes
(
) No
,
If yes, vehicle will be denied entry into protected area. Contact Security
.
Shift Supervisor immediately.
If no, notify CAS that search is complete and the vehicle may be allowed on
site.
.
b
Date:
Time
l
,
'
i
I
Vehicle searched by and all items complete:
__
(Signature)
Vehicle Escorted By:
Vehicle No.:
4
(Name)
(i.e., DV 006)
Vehicle Departed Protectej Area Date:
Time
,
HP Cleared By:
(Name)
j
This form will normally be maintained in Access Control while the vehicle is on site.
L
i
i
!
,
'
Procedure Number
sp ?.6
Date
12-23-87
Revision
s.
Page
1 Of
1
Pagesj
j
i
,
d
I
_ _ _ _ _ _ _ _
__
e
@
N
.
.
1
_-
w]
T
\\
/)
,
I
\\
/
'
/
/
/!
1
'
J
. ,, ,
_ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _