Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000382/LER-1997-031, :on 971120,HR Analyzer Valves Position Did Not Meet TS Requirements.Caused by Inadequate Design.Verified Valves Were in Closed Position,Declared Remote Position Indication for Valves Inoperable & Entered TS 3.3.3.6 + (10:59:39, 24 May 2025)
- ML20197E790 + (11:00:49, 24 May 2025)
- IR 05000255/1986001 + (11:00:50, 24 May 2025)
- 05000344/LER-1985-013-01, Forwards Rev 0 to 01-0300-1471, Preliminary Thermal Expansion Evaluation of Reactor Coolant Loop for Trojan Nuclear Plant, as Clarification of LER 85-013-01 in Response to 860430 Telcon + (11:01:07, 24 May 2025)
- ML20197E685 + (11:01:17, 24 May 2025)
- IR 05000395/1997003 + (11:01:37, 24 May 2025)
- NUREG-0427, Discusses Reassessment of Reported Manpower & External Contractural Costs for Radiological Safety CP Review by Comparison w/man-yrs Recorded in NUREG-0427.Expenditures Considered Reasonable + (11:01:43, 24 May 2025)
- ML20197E589 + (11:01:50, 24 May 2025)
- IR 05000188/1988001 + (11:02:03, 24 May 2025)
- IR 05000382/1988005 + (11:02:13, 24 May 2025)
- IR 05000261/1997010 + (11:02:17, 24 May 2025)
- IR 05000298/1988006 + (11:02:42, 24 May 2025)
- ML20197E338 + (11:02:49, 24 May 2025)
- ML20197D928 + (11:04:19, 24 May 2025)
- ML20197D920 + (11:04:21, 24 May 2025)
- IR 05000259/1988005 + (11:05:29, 24 May 2025)
- 05000282/LER-1997-016, :on 971119,condition That Did Not Fully Comply W/Prescriptive Requirements of 10CFR50,App R Section Iii.O, Was Noted.Caused by Inadequate Review.Revised Alarm Response Procedures C47012 & C47512 to Inspect Area Around RCP + (11:05:37, 24 May 2025)
- TAC:07551 + (11:05:49, 24 May 2025)
- ML20197D396 + (11:06:11, 24 May 2025)
- 05000255/LER-1986-017, :on 860410,excess Primary Coolant Leakage Detected.Plant Placed in Hot Shutdown.Caused by Failure of Valves RV-2006,PRV-1067,-1068 & -1072 to Seat Fully.Valves Repaired & Reseated + (11:06:21, 24 May 2025)
- 05000461/LER-1997-028, :on 971126,identified Inoperability of All in-service 33 480-volt K-line safety-related Circuit Breakers.Caused by Failure of ABB to Supply Properly Qualified Components Per 10CFR21.Will Replace Components + (11:06:30, 24 May 2025)
- TAC:51655 + (11:06:43, 24 May 2025)
- ML20197D211 + (11:07:01, 24 May 2025)
- TAC:64136 + (11:07:13, 24 May 2025)
- TAC:M99222 + (11:07:50, 24 May 2025)
- TAC:M99213 + (11:07:52, 24 May 2025)
- ML20197C965 + (11:08:15, 24 May 2025)
- 05000366/LER-1978-062-01, /01T-0 on 781101:dimensions of Condensing Pots 2B21-D004 a & B Were Found to Be Installed Per Design Causing RCIC & HPCI High Level Trips to Exceed Tech Spec + (11:08:20, 24 May 2025)
- NUREG-1560, Forwards Draft NUREG-1560 Public Workshop Summary Rept from Workshop Held on 970407-09 in Austin,Texas.Rept Summarizes Discussions Held During Workshop & Documents All of Presentation Matl Distributed to Workshop by Attendees + (11:08:50, 24 May 2025)
- ML20197C788 + (11:09:04, 24 May 2025)
- ML20197C773 + (11:09:10, 24 May 2025)
- L-98-177, Forwards Typed Final TS Pages for LAR 235.Summary Description of Editorial Changes Incorporated in Addition Changes Previously addressed.Marked-up Pages Provided in Attachment B + (11:09:58, 24 May 2025)
- 05000373/LER-1997-041, :on 971120,failure to Verify Thermal Limits Prior to Exceeding 25% Power During Unit Startups Prior to 1996 Due to Misinterpretation of TS Requirements.Procedure (LGP-1-1) Will Be Revised + (11:11:51, 24 May 2025)
- 05000461/LER-1997-030-01, Forwards LER 97-030-01,re Failure to Verify That RWCU Sys Was Available as Alternate Means of Shutdown Cooling Due to Procedural Inadequacy.Commitments Made within Ltr,Listed + (11:11:57, 24 May 2025)
- ML20197C249 + (11:12:05, 24 May 2025)
- ML20197C185 + (11:12:18, 24 May 2025)
- ML20197C119 + (11:12:33, 24 May 2025)
- ML20197C066 + (11:12:58, 24 May 2025)
- ML20197C030 + (11:13:26, 24 May 2025)
- ML20197B911 + (11:13:56, 24 May 2025)
- ML20197B807 + (11:15:24, 24 May 2025)
- TAC:M98393 + (11:15:52, 24 May 2025)
- ML20197B722 + (11:16:01, 24 May 2025)
- 05000255/LER-1986-016, :on 860310,LPSI Pump P-67B Inadvertently Started.Caused by Closing Corresponding Pair of Contacts on DBA Sequencer During Cleaning Procedure.New Tool Used During Cleaning.Incident Discussed W/Personnel + (11:16:58, 24 May 2025)
- 05000461/LER-1997-031, :on 971113,inadequate Testing of SR Logic Circuits Resulted in Failure to Meet TS Sr.Cause Has Not Been Determined.No Actions Have Been Taken at Present Time + (11:17:26, 24 May 2025)
- ML20197B395 + (11:17:29, 24 May 2025)
- ML20197B392 + (11:17:30, 24 May 2025)
- ML20197B264 + (11:18:07, 24 May 2025)
- NUREG-0309, Forwards Safety Evaluation Rept for Subj Facil + (11:18:09, 24 May 2025)
- IR 05000346/1978023 + (11:18:19, 24 May 2025)
- ML20197B181 + (11:18:28, 24 May 2025)