Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197G862 + (10:49:01, 24 May 2025)
- IR 05000322/1986003 + (10:49:05, 24 May 2025)
- IR 05000413/1997003 + (10:49:31, 24 May 2025)
- TAC:51701 + (10:49:35, 24 May 2025)
- 05000373/LER-1984-028, :on 840513,spurious Closure of Div II RCIC Steam Line High Temp Isolation Switch Caused Steam Line to Isolate & Turbine to Trip.Temp Switches Recalibr + (10:49:40, 24 May 2025)
- 05000339/LER-1986-007-01, :on 860416,trip Occurred During Throttle valve- Governor Valve Transfer.Caused by Turbine First Stage Pressure Spike.Investigation of Electro Hydraulic Control Sys Underway + (10:49:42, 24 May 2025)
- ML20197G694 + (10:49:44, 24 May 2025)
- IR 05000324/1996013 + (10:49:46, 24 May 2025)
- ML20197G674 + (10:49:50, 24 May 2025)
- ML20197G668 + (10:49:52, 24 May 2025)
- ML20197G657 + (10:49:55, 24 May 2025)
- ML20197G645 + (10:49:59, 24 May 2025)
- ML20197G627 + (10:50:05, 24 May 2025)
- ML20197G619 + (10:50:08, 24 May 2025)
- 05000282/LER-1998-017, :on 981103,failure to Test SR Hi Flux Trip Functions During non-refueling Outages as Required by TS 4.1-1A Was Noted.Caused by No Sp Existing to Test SR Hfr Trip Logic Function.Developed Procedure for Testing + (10:50:14, 24 May 2025)
- 05000304/LER-1997-009-08, :on 971202,test Relay SIX1-AX Did Not Unlatch as Required During Restoration of PT 10-3.Caused by Failure to Follow Procedures.Rewired Test Relay SIX1-AX + (10:50:18, 24 May 2025)
- IR 05000298/1988004 + (10:50:26, 24 May 2025)
- ML20197G534 + (10:50:31, 24 May 2025)
- IR 05000267/1988003 + (10:50:34, 24 May 2025)
- ML20197G511 + (10:50:37, 24 May 2025)
- ML20197G497 + (10:50:41, 24 May 2025)
- ML20197G485 + (10:50:48, 24 May 2025)
- TAC:51953 + (10:50:49, 24 May 2025)
- 05000295/LER-1997-025-02, :on 971124,visual Insp of Reactor Cavity Area Was Not Performed Per Ts.Caused by Inadequate Review of TSS 15.6.21 Procedure Performed in 1991.Revised TSS 15.6.21 Procedure + (10:50:52, 24 May 2025)
- ML20197G419 + (10:51:05, 24 May 2025)
- NUREG-0801, Forwards Comments on Program Plan for Detailed Control Room Design Review (Dcrdr).Program Plan Addresses All Required Elements of DCRDR.In-progress Audit Not Planned + (10:51:09, 24 May 2025)
- 05000445/LER-1997-004-02, Forwards LER 97-004-02 Re Issues Discovered During Review of GL 96-01 Associated W/Ts Surveillances + (10:51:37, 24 May 2025)
- 05000295/LER-1997-021-01, Forwards LER 97-021-01,per 10CFR50.73(a)(2)(i)(B). Commitments Associated W/Correspondence,Encl + (10:52:13, 24 May 2025)
- IR 05000344/1986006 + (10:52:30, 24 May 2025)
- IR 05000192/1988001 + (10:52:35, 24 May 2025)
- IR 05000443/1996003 + (10:52:49, 24 May 2025)
- ML20197F960 + (10:52:52, 24 May 2025)
- CY-97-155, Requests Exemption from Requirements of 10CFR70.24(a), Criticality Accident Requirements. Request Is That Applicable Parts of Previously Granted Exemption to 10CFR70.24 Be Reapproved.Justification for Request,Encl + (10:53:07, 24 May 2025)
- IR 05000298/1988010 + (10:53:23, 24 May 2025)
- ML20197F748 + (10:53:38, 24 May 2025)
- 05000352/LER-1997-012, :on 971120,unplanned Closure of Primary Containment Isolation Valve Occurred.Caused by an Inaccurate Drawing & an Inadequate Partial Surveillance Test. Engineering Change Request Was Initiated + (10:53:54, 24 May 2025)
- ML20197F684 + (10:53:55, 24 May 2025)
- NUREG-0812, Forwards Response to Comments on Des.Only Lochstet Comments Require Reply + (10:53:59, 24 May 2025)
- IR 05000293/1988011 + (10:54:34, 24 May 2025)
- ML20197F431 + (10:54:55, 24 May 2025)
- A06968, Responds to NRC 871215 Request for Addl Info on SEP Topic III-6, Seismic Reevaluation & Clarifies Questions Raised During 880406 meeting.W/13 Oversize Drawings + (10:55:00, 24 May 2025)
- IR 05000482/1988009 + (10:55:05, 24 May 2025)
- ML20197F371 + (10:55:11, 24 May 2025)
- IR 05000498/1988007 + (10:55:26, 24 May 2025)
- ML20197F286 + (10:57:03, 24 May 2025)
- TXX-8849, Forwards Endorsement 24 to Nelia Policy NF-274 + (10:57:55, 24 May 2025)
- ML20197F054 + (10:59:24, 24 May 2025)
- 05000382/LER-1997-031, :on 971120,HR Analyzer Valves Position Did Not Meet TS Requirements.Caused by Inadequate Design.Verified Valves Were in Closed Position,Declared Remote Position Indication for Valves Inoperable & Entered TS 3.3.3.6 + (10:59:39, 24 May 2025)
- ML20197E790 + (11:00:49, 24 May 2025)
- IR 05000255/1986001 + (11:00:50, 24 May 2025)
- 05000344/LER-1985-013-01, Forwards Rev 0 to 01-0300-1471, Preliminary Thermal Expansion Evaluation of Reactor Coolant Loop for Trojan Nuclear Plant, as Clarification of LER 85-013-01 in Response to 860430 Telcon + (11:01:07, 24 May 2025)