IR 05000293/1988011

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Accepting Util 871120 & 1214 Submittals of Facility Procedures Generation Package as Required by Suppl 1 to NUREG-0737.Unresolved Items Noted in Insp Rept 50-293/88-11 Must Be Resolved
ML20197F525
Person / Time
Site: Pilgrim
Issue date: 06/06/1988
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20197F530 List:
References
RTR-NUREG-0737, RTR-NUREG-0800, RTR-NUREG-0899, RTR-NUREG-737, RTR-NUREG-800, RTR-NUREG-899 GL-82-33, TAC-44328, NUDOCS 8806140014
Download: ML20197F525 (2)


Text

'

, June 6, 1988 Docket No. 50-293 Mr. Ralph '

Senior Vice President . Nuclear Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199

Dear Mr. Bird:

SUBJECT: PILGRIM PROCEDURES GENERATION PACKAGE . SAFETY EVALUATION REFERENCE: TAC # 44328 By letters dated November 20, 1987 and December 14, 1987 you submitted the Pilgrim Procedures Generation Package (PGP) which +;as revised by a letter dated April 6, 1988. Enclosed is the staff's safety evaluation of the Pilgrim PGP required by Supplement 1 to NUREG-0737, "Requirements for Emergency Response Capability" (Generic Letter 82-33). The review was conducted in conjunction with the Emergency Operating Procedure (EOP)

inspection the week of March 14. The results of the inspection are documented in Inspection Report No. 50-293/88 11, dated May 17, 1988. Four unresolved itects in relation to the implementation of the E0Ps are noted in the inspection report.

Based on our review, we conclude that, the revised Pilgrim PGP adequately addresses the requirements stated in Generic Letter 82-33 (Supplement 1 to ,

NUREG.0737) and provides acceptable methods for accomplishing the objectives stated in NUREG-0899 in accordance with the guidance provided in the Standard

,

ReviewPlan(NRUEG.0300).

Inis completes our action related to the above referenced TAC number. The unresolved items noted in the inspection report referred to above must be resolved.

Sincerely, Original signed by:

Daniel G. Mcdonald, Senior Project Manager l Project Directorate I-3 '

Division of Reactor Projects I/II i

Enclosures:

1. Safety Evaluation  ;

8806140014 880606 3 I cc: w/ enclosures: PDR ADOCK 050 See next page P 1 Distribution: Docket FilefNRC & Local PDRs, PDI-3 r/f, RWessman, RBoger, l

.Vushbrook, DMcDonald, OGC, EJordan, JPartlow Tech Branch, ACRS (10), '

JWiggins Region I, WKennedy, WRegan, WHodges, JCraig, TMurley, AThadani

~

0FC :PD : :PDI 3 :  : : : !

.....:.... ... .......:.... ...:............:............:............:...........

NAME :MRus o :D onald:ck:RWes n :  : : : :

DATE : W ........:............:,.E.........:............:............:............:...........

.....:c..h/88 :R/[a /88 :6/ /88 : *

:

OFFICIAL RECORD COPY

i

.

Mr. Ralph Boston Edison Company Pilgrim Nuclear Power Station

cc:

Mr. K. L. Highf111 Boston Edison Company Station Director ATTN: Mr. Ralph Pilgrim Nuclear Power Station Senior Vice President - Nuclear RFD #1 Rocky Hill Road 800 Boylston Street Plymouth, Massachusetts 02360 Boston, Massachusetts 02199 Resident inspector's Office Mr. Richard N. Swanson, Manager U. S. Nuclear Regulatory Comission Nuclear Engineering Department Post Office Box 867 Boston Ed! son Company Plymouth, Massachusetts 02360 25 Braintree Hill Park Braintree, Massachusetts 02184 Chairman, Board of Selectmen 11 Lincoln Street Ms. Elaine D. Robinson Plymouth, Massachusetts 02360 Nuclear Information Manager Pilgrin Nuclear Power Station Office of the Comissioner RFD #1, Rocky Hill Road Massachusetts Dopartment of Plymouth, Massachusetts 0?360 Environmental Ouality Engineering One Winter Street Charles V. Berry Boston, Massachusetts 02108 Secretary of Public Safety Executive Office of Public Safety Office of the Attorney General One Ashburton Place 1 Ashburton Place Roston, Massachusetts 0?108 20th Floor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of

,

'

i Public Health i 150 Tremont Street 2nd Floor l Boston, Massachusetts 02111 1 I

Regicnal Administrator, Region I U. S. Nuclear Regulatory Comission -

475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. James D. Keyes 3 Regulatory Affairs and Programs Group Leader Boston Edison Company 25 Braintree Mill Park  !

Braintree, Massachusetts 02184

l i

'