Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198N612 + (09:13:46, 24 May 2025)
- 05000302/LER-1997-046, :on 971220,circuits Required for Operation of EDG Exciters Were Not Protected from Effects of Postulated App R Fire in MCR or Csr.Caused by Engineering Oversight. Individuals Involved Have Been Briefed & Counseled on Event + (09:14:13, 24 May 2025)
- IR 05000196/1997001 + (09:14:15, 24 May 2025)
- B17603, Special Rept:On 981212, Start of B-EDG Was Attempted from CR Following Completion of Heat Exchanger Insps.Caused by Trapped Air Pocket within CW Loop.Performed OPs as Required in Order to re-vent Sys + (09:14:16, 24 May 2025)
- 05000293/LER-1997-028, :on 971217,intake Structure in Configuration Was Inconsistent W/Tornado Depressurization Analysis Assumptions.Caused by Inadequate Control of Tornado Barriers.Revised Station Tornado Procedure + (09:14:21, 24 May 2025)
- 05000361/LER-1997-017, :on 971216,STAs Were Questioned Re Respirator Qualifications & Requirements Re Corrective Lense Wearers. Cause Not Determined.Util Has Requalified & Certified All STAs for Respirator Use + (09:14:33, 24 May 2025)
- 05000295/LER-1994-005-03, :on 940403,Unit 1 Main Reactor Trip & Subsequent Start of 1A Afp Following Generator Fire & Isophase Bus Duct Fault,Occurred.Caused by Main Generator Phase C Bushing Failure.Internal Insp Was Performed + (09:14:46, 24 May 2025)
- ML20198N362 + (09:15:02, 24 May 2025)
- 05000482/LER-1997-016-01, Forwards LER 97-016-01,documenting Violation of Plant OL & TS Re Use of Fire Protection Sys Pumps for non-fire Protection Purposes + (09:15:03, 24 May 2025)
- ML20198N329 + (09:15:11, 24 May 2025)
- ML20198N303 + (09:15:20, 24 May 2025)
- ML20198N246 + (09:15:34, 24 May 2025)
- ML20198N196 + (09:15:45, 24 May 2025)
- IR 05000445/1997015 + (09:15:46, 24 May 2025)
- ML20198N177 + (09:15:50, 24 May 2025)
- ML20198N163 + (09:15:53, 24 May 2025)
- TAC:M79569 + (09:16:06, 24 May 2025)
- ML20198N115 + (09:16:07, 24 May 2025)
- ML20198N085 + (09:16:14, 24 May 2025)
- TAC:MA0229 + (09:17:01, 24 May 2025)
- 05000302/LER-1997-031-01, Forwards LER 97-031-01,discussing Results of Evaluation Performed for Cables Identified in LER 97-031-00 + (09:17:07, 24 May 2025)
- B110078, Rev 1 to GE-NE-B1100786-01, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 1 + (09:17:22, 24 May 2025)
- 05000382/LER-1997-034, :on 971217,missed Mechanical Snubber Surveillance Was Revealed.Caused by Failure to Perform Snubber Functional Test.Spare PSA-100 Snubber Was Satisfactorily Tested & Installed + (09:17:27, 24 May 2025)
- ML20198M718 + (09:17:44, 24 May 2025)
- ML20198M686 + (09:17:51, 24 May 2025)
- ML20198M431 + (09:18:09, 24 May 2025)
- ML20198M280 + (09:18:34, 24 May 2025)
- ML20198M202 + (09:18:54, 24 May 2025)
- IR 05000387/1997006 + (09:19:04, 24 May 2025)
- ML20198L953 + (09:19:54, 24 May 2025)
- ML20198L923 + (09:20:01, 24 May 2025)
- ML20198L914 + (09:20:03, 24 May 2025)
- ML20198L911 + (09:20:04, 24 May 2025)
- 05000382/LER-1995-002, :on 950610,reactor Trip,Partial Loss of Offsite Power & non-safety Related Switchgear Fire Occurred.Caused by Improper Automatic Bus Transfer.New Automatic Bus Transfer Scheme Installed + (09:20:16, 24 May 2025)
- ML20198L721 + (09:21:25, 24 May 2025)
- ML20198L699 + (09:21:33, 24 May 2025)
- IR 05000456/1997001 + (09:21:34, 24 May 2025)
- ML20198L524 + (09:23:05, 24 May 2025)
- IR 05000277/1998008 + (09:23:27, 24 May 2025)
- ML20198L436 + (09:23:29, 24 May 2025)
- ML20198L398 + (09:23:50, 24 May 2025)
- ML20198L332 + (09:24:19, 24 May 2025)
- ML20198L323 + (09:24:22, 24 May 2025)
- ML20198L246 + (09:24:49, 24 May 2025)
- 05000354/LER-1997-024, :on 971001,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Occurred.Caused by Corrosion Bonding of Pilot Disc to Pilot Seat Due to Radiolytic Oxygen.Srvs Inspected + (09:24:55, 24 May 2025)
- ML20198L190 + (09:25:02, 24 May 2025)
- CLI-98-25, Erratum.* Advises That Citation to CLI-98-12 on Page 7 of CLI-98-25 (Issued on 981223),immediately Following First Indented Quotation,Should Read 48 NRC 18, Not 48 NRC 1 + (09:25:15, 24 May 2025)
- ML20198L106 + (09:25:28, 24 May 2025)
- DD-97-20, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-97-20 Has Expired.Commission Declined Any Review.Decision Became Final on 971003.W/Certificate of Svc.Served on 971007 + (09:25:29, 24 May 2025)
- ML20198L091 + (09:25:36, 24 May 2025)
- ML20198L047 + (09:25:45, 24 May 2025)