Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000313/1997019 + (07:18:36, 24 May 2025)
- ML20202C341 + (07:18:46, 24 May 2025)
- IR 05000254/1997006 + (07:19:05, 24 May 2025)
- IR 07100016/2011014 + (07:19:10, 24 May 2025)
- IR 05000010/1997009 + (07:21:42, 24 May 2025)
- IR 05000254/1997008 + (07:22:02, 24 May 2025)
- ML20202C114 + (07:22:26, 24 May 2025)
- ML20202C058 + (07:22:39, 24 May 2025)
- ML20202B993 + (07:22:53, 24 May 2025)
- TAC:M97883 + (07:23:03, 24 May 2025)
- ML20202B941 + (07:23:05, 24 May 2025)
- ML20202B940 + (07:23:06, 24 May 2025)
- ML20202B863 + (07:23:29, 24 May 2025)
- IR 05000445/1980015 + (07:24:46, 24 May 2025)
- IR 05000010/1997024 + (07:24:54, 24 May 2025)
- ML20202B316 + (07:25:59, 24 May 2025)
- ML20202B298 + (07:26:04, 24 May 2025)
- IR 05000400/1996099 + (07:26:10, 24 May 2025)
- 05000413/LER-1997-012, :on 971231,determined That TS 3.3.2 Violated in Past History of Plant Due to Method of Performing Incore Thermocouple & RTD Cross Calibrs.Caused by Inadequate Process for Identifying Commitments.Instructions Provided + (07:26:14, 24 May 2025)
- IR 05000445/1979026 + (07:26:26, 24 May 2025)
- ML20202B100 + (07:27:01, 24 May 2025)
- ML20202B050 + (07:27:15, 24 May 2025)
- 05000443/LER-1998-001, :on 980103,inadequate ECCS Venting Surveillance Occurred.Caused by Not Using Piping Isometric Drawings in Selection of Vent Points,Inappropriately Crediting Dynamic Venting of Operating Pumps.Procedures Revised + (07:27:21, 24 May 2025)
- IR 05000282/1997019 + (07:27:30, 24 May 2025)
- IR 05000458/1997011 + (07:27:36, 24 May 2025)
- 05000528/LER-1986-038, :on 860603,technician Discovered Flow Rate Monitor & Sampler Flow Rate Measuring Device Daily Channel Checks Not Performed.Caused by Personnel Error.Radiation Protection Technicians Counseled Re Compliance + (07:27:45, 24 May 2025)
- 05000445/LER-1997-009, :on 971027,reactor Trip Initiated Due to Main Turbine Generator Trip.Caused by Slow Operation of East Bus Supply Breaker.Inspected & Exercised East Bus Supply Breaker & Chartered Task Team to Evaluate Event + (07:27:54, 24 May 2025)
- IR 07100116/2012027 + (07:27:57, 24 May 2025)
- NSD-NRC-97-5441, Forwards Responses to Questions Related to Plugging of Screens & Safety Classification of Paint & Draft SSAR Changes.Listed Open Items Will Be Statused as Action N or Confirm W Pending Inclusion in SSAR Rev + (07:28:11, 24 May 2025)
- 05000293/LER-1997-024, :on 971023,plant Valve Configuration for Inerting Primary Containment Was Outside Design Basis.Caused by Failure to Recognize Procedure Specified Valve line-up Could Result in Bypass Flow Path from Drywell Atmosphere + (07:28:27, 24 May 2025)
- 05000321/LER-1997-006-03, :on 971031,apparent LPRM TIP Calibr Tube Failure Resulted in Primary Sys Pressure Boundary Leakage. Caused by Small Matl or Mfg Flaw in TIP Calibr Tube.Replaced Entire LPRM Assembly + (07:28:30, 24 May 2025)
- 05000423/LER-1997-053, :on 971024,channel Check Surveillance Requirements Were Not in Compliance W/Ts.Caused by Inadequate Monitoring by Mgt of Surveillance Program. Procedures That Need to Require Channel Checks,Corrected + (07:28:35, 24 May 2025)
- ML20202A856 + (07:28:45, 24 May 2025)
- IR 05000254/1997027 + (07:28:51, 24 May 2025)
- 05000369/LER-1997-010, :on 971023,determined That Potential Existed for Inadequate Margin to Be Maintained W/Regard to RCS Flow Rate Due to Analysis Deficiency.Ts Change Will Be Submitted to Eliminate Potential non-conservatism + (07:28:56, 24 May 2025)
- TAC:59974 + (07:29:20, 24 May 2025)
- IR 05000458/1997020 + (07:29:24, 24 May 2025)
- ML20202A654 + (07:29:43, 24 May 2025)
- ML20199M380 + (07:30:18, 24 May 2025)
- ML20199M235 + (07:30:30, 24 May 2025)
- ML20199M093 + (07:30:45, 24 May 2025)
- IR 05000361/1997021 + (07:31:00, 24 May 2025)
- 05000443/LER-1997-015, :on 971028,potentially non-conservative W Fuel Rod Performance Model Was Discovered.Caused by W Fuel Rod Performance Code That Is Potentially non-conservative.W Planning to Perform plant-specific Analyses + (07:31:05, 24 May 2025)
- 05000454/LER-1997-021-03, :on 971028,CR Door Was Removed & non-seismically Qualified Structure Was Relied on to Maintain Pressure Boundary.Caused by Inadequate Procedure. Temporary Barrier Was Provided + (07:31:15, 24 May 2025)
- 05000374/LER-1998-001, :on 980106,indications,isolations & Alarms Occurred Due to Trip of 2B RPS MG Set Output Breaker & Concurrent Tripping of Electrical Protection Assembly. Replaced Circuit Board Containing Overvoltage Relay + (07:31:33, 24 May 2025)
- 05000265/LER-1997-002-01, :on 970301,Unit 2 Was Shutdown Per TS 3.5.A & 3.6.F.Caused by Personnel Cognitive Error.Containment Procedure Changes Were Implemented to Prevent Containment Pressure Suppression Bypass + (07:32:03, 24 May 2025)
- IR 05000498/1997015 + (07:32:27, 24 May 2025)
- 05000445/LER-1997-004-01, Forwards LER 97-004-01 Re Issues Discovered During Review of GL 96-01 Associated W/Ts Surveillances at Cpses,Unit 1. Condition Discovered on 971009 & Reported on 971025. Commitments Re CPSES Units 1 & 2 as Noted in Attachmen + (07:32:40, 24 May 2025)
- 05000266/LER-1997-041, :on 971023,potential Common Mode Failure in Afws Control Circuits Was Noted.Caused by AFW Control Circuits Installed by Plant Mods.Temporary Mods Will Restore Physical Separation for Cables + (07:33:03, 24 May 2025)
- 05000302/LER-1979-005-01, Discusses Commitment Stated in LER 79-005-01T-1 Re MSIV Valves Not Closing within Design Time of Five Seconds During Double Ended Pipe Rupture.Util Has Determined That Upgrading Air Circuit to Seismic Class I Will Not Be Nec + (07:33:07, 24 May 2025)
- IR 05000302/1997021 + (07:33:17, 24 May 2025)