Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19345A430 + (15:43:36, 24 December 2024)
- ML19345A429 + (15:43:37, 24 December 2024)
- ML19345A428 + (15:43:39, 24 December 2024)
- ML19345A426 + (15:43:40, 24 December 2024)
- ML19345A425 + (15:43:41, 24 December 2024)
- ML19345A424 + (15:43:42, 24 December 2024)
- ML19345A423 + (15:43:43, 24 December 2024)
- ML19345A421 + (15:43:44, 24 December 2024)
- ML19345A420 + (15:43:45, 24 December 2024)
- ML19345A416 + (15:43:46, 24 December 2024)
- 05000029/LER-1976-007-01, /01T-0:on 760624,investigation of RO 76-06 Revealed That Assumed Boron Concentration of LOCA Analysis Was Exceeded During Hydrostatic Leak Test of Reactor Vessel. Caused by Personnel Error.Personnel Reinstructed + (15:43:48, 24 December 2024)
- ML19345A414 + (15:43:50, 24 December 2024)
- 05000029/LER-1976-007, Forwards LER 76-007/01T-0 + (15:43:51, 24 December 2024)
- ML19345A410 + (15:43:52, 24 December 2024)
- 05000029/LER-1977-004-03, /03L-0:on 770114,charging Pump 2 Discharge Pressure Failed to Meet Tech Specs Surveillance Requirement. Caused by Requirements Based on Centrifugal Instead of Reciprocating Type Pump.Proposed Change Initiated + (15:43:54, 24 December 2024)
- ML19345A408 + (15:43:55, 24 December 2024)
- ML19345A406 + (15:43:56, 24 December 2024)
- 05000029/LER-1977-004, Forwards LER 77-004/03L-0 + (15:44:01, 24 December 2024)
- ML19345A403 + (15:44:03, 24 December 2024)
- ML19345A401 + (15:44:04, 24 December 2024)
- 05000029/LER-1977-006-03, /03L-0:on 770131,eight Temp Readout Points on Boric Acid Line Found Below Tech Specs Limit.Caused by Sys Evolutions Not Adequately Analyzed During Review of Westinghouse Sts.Proposed Change Initiated + (15:44:05, 24 December 2024)
- ML19345A399 + (15:44:07, 24 December 2024)
- 05000029/LER-1977-006, Forwards LER 77-006/03L-0 + (15:44:08, 24 December 2024)
- ML19345A395 + (15:44:10, 24 December 2024)
- ML19345A394 + (15:44:11, 24 December 2024)
- 05000029/LER-1976-006-01, /01T-0:on 760624,during Normal Operation,Routine Safety Injection Tank Makeup Was Performed Per Plant Procedure.Acceptance Criteria Not Met.Caused by Change 117, Suppl 3,requiring Limits on Boron Concentration + (15:44:12, 24 December 2024)
- ML19345A391 + (15:44:14, 24 December 2024)
- 05000029/LER-1976-006, Forwards LER 76-006/01T-0 + (15:44:15, 24 December 2024)
- ML19345A388 + (15:44:17, 24 December 2024)
- ML19345A387 + (15:44:18, 24 December 2024)
- ML19345A385 + (15:44:19, 24 December 2024)
- ML19345A384 + (15:44:20, 24 December 2024)
- ML19345A383 + (15:44:21, 24 December 2024)
- ML19345A381 + (15:44:22, 24 December 2024)
- ML19345A380 + (15:44:23, 24 December 2024)
- ML19345A378 + (15:44:24, 24 December 2024)
- ML19345A377 + (15:44:25, 24 December 2024)
- ML19345A375 + (15:44:26, 24 December 2024)
- ML19345A374 + (15:44:28, 24 December 2024)
- ML19345A373 + (15:44:29, 24 December 2024)
- ML19345A371 + (15:44:30, 24 December 2024)
- ML19345A370 + (15:44:31, 24 December 2024)
- ML19345A369 + (15:44:32, 24 December 2024)
- ML19345A368 + (15:44:36, 24 December 2024)
- ML19345A367 + (15:44:37, 24 December 2024)
- ML19345A365 + (15:44:38, 24 December 2024)
- ML19345A364 + (15:44:40, 24 December 2024)
- ML19345A363 + (15:44:41, 24 December 2024)
- ML19345A362 + (15:44:42, 24 December 2024)
- ML19345A361 + (15:44:43, 24 December 2024)
- ML19345A359 + (15:44:44, 24 December 2024)