Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-2278, Forwards Annual Financial Repts for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station & Form 10-K, Annual Rept to Us Securities & Exchange Commission for Fiscal Year Ended 971231 + (09:36:38, 23 May 2025)
- 05000346/LER-1997-008-12, Forwards LER 97-008-12,providing Addl Info on 970318 Occurrence.Changes Marked W/Rev Bar in Margin.Util Requests That NRC Destroy or Mark Superseded on Previous Copies of LER + (09:36:45, 23 May 2025)
- ML20217D690 + (09:36:50, 23 May 2025)
- ML20217D677 + (09:36:52, 23 May 2025)
- IR 05000280/1999301 + (09:37:28, 23 May 2025)
- IR 05000458/1997019 + (09:37:59, 23 May 2025)
- IR 05000133/1997002 + (09:38:17, 23 May 2025)
- VPN-021-98, Trojan Nuclear Plant Annual Radiological Environ Monitoring Rept for 970101-1231 + (09:38:25, 23 May 2025)
- ML20217D614 + (09:38:37, 23 May 2025)
- NG-97-1613, Forwards Revised Contents of MOR for Aug 1997 Per GL 97-02 + (09:38:43, 23 May 2025)
- ML20217D539 + (09:38:55, 23 May 2025)
- ML20217D497 + (09:39:06, 23 May 2025)
- L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 + (09:39:09, 23 May 2025)
- ML20217D476 + (09:39:14, 23 May 2025)
- L-98-074, Responds to NRC Re Violations Noted in Insp Repts 50-334/97-11 & 50-412/97-11.Corrective Actions:Suppl Work Instruction That Was Not Properly Controlled Was Removed from Work Package + (09:39:21, 23 May 2025)
- ML20217D434 + (09:39:25, 23 May 2025)
- L-98-077, Forwards Beaver Valley Unit 1,Cycle 13 Voltage-Based Repair Criteria 90-Day Rept, Which Supports Continued Implementation of 2.0 Volt Repair Criteria as Outlined in NRC GL 95-05 + (09:39:34, 23 May 2025)
- IR 05000295/1998003 + (09:39:36, 23 May 2025)
- BSEP-98-0090, Provides Comments on Draft SE Re Conversion to Improved Tech Specs.Encl 2 Provides Draft SE pages,marked-up to Reflect Comments as Well as Addl Editorial Comments + (09:39:46, 23 May 2025)
- IR 05000254/1998002 + (09:39:48, 23 May 2025)
- IR 05000331/1998002 + (09:39:53, 23 May 2025)
- IR 05000321/1997011 + (09:40:15, 23 May 2025)
- TAC:M97263 + (09:40:28, 23 May 2025)
- IR 05000454/1998008 + (09:41:10, 23 May 2025)
- ML20217D113 + (09:41:15, 23 May 2025)
- ML20217D094 + (09:41:26, 23 May 2025)
- ML20217D080 + (09:41:32, 23 May 2025)
- ML20217D067 + (09:41:37, 23 May 2025)
- IR 05000461/1997313 + (09:42:51, 23 May 2025)
- ML20217C998 + (09:43:02, 23 May 2025)
- ML20217C981 + (09:43:08, 23 May 2025)
- ML20217C974 + (09:43:10, 23 May 2025)
- 05000456/LER-1997-009, :on 971028,potential Failure of W Fuel Rod Design Criteria Discovered by W.Caused by Use of Inadequate Methods & Incorrect Assumptions in Fuel Rod Design Code.W Completed plant-specific Analyses on 980306 + (09:43:13, 23 May 2025)
- ML20217C958 + (09:43:21, 23 May 2025)
- ML20217C940 + (09:43:25, 23 May 2025)
- 05000317/LER-1998-006, :on 980325,1B DG Failed to Start During Performance of Routine Surveillance Test.Caused by Piece of Nylon in Governors Shutdown Solenoid Valve.Conducted Review + (09:43:27, 23 May 2025)
- ML20217C920 + (09:43:32, 23 May 2025)
- ML20217C902 + (09:43:38, 23 May 2025)
- ML20217C891 + (09:43:41, 23 May 2025)
- 05000414/LER-1998-001-04, :on 980312,both Trains of Unit 2 Annulus Ventilation Sys Became Inoperable.Caused by Inadequate Process for Determining Compensatory Actions Were Needed to Perform Work on Door.Improved Programs + (09:43:50, 23 May 2025)
- ML20217C851 + (09:43:56, 23 May 2025)
- ML20217C849 + (09:44:00, 23 May 2025)
- ML20217C841 + (09:44:03, 23 May 2025)
- ML20217C806 + (09:44:12, 23 May 2025)
- IR 05000309/1997004 + (09:45:07, 23 May 2025)
- ML20217C767 + (09:45:14, 23 May 2025)
- TAC:L31023 + (09:45:18, 23 May 2025)
- 05000254/LER-1999-003-05, :on 990907,noted That HPCI Was Inoperable Due to Manual Closure of HPCI Steam Supply Isolation Valve.Cause Indeterminate.Suppl LER Will Be Issued Upon Determination of Root Cause of Control Switch Failure + (09:45:20, 23 May 2025)
- IR 05000282/1997007 + (09:45:32, 23 May 2025)
- TAC:M96777 + (09:45:35, 23 May 2025)
- ML20217C662 + (09:45:38, 23 May 2025)