Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000260/LER-1981-002, Forwards LER 81-002/03L-0 + (20:04:14, 23 December 2024)
- ML20003A345 + (20:04:15, 23 December 2024)
- 05000265/LER-1981-001-03, /03L-0:on 810116,during High Drywell Pressure Calibr & Functional Test,Pressure Switch PS-1-1001-88D Trip Point Found Above Tech Spec Limit.Caused by Setpoint Drift.Switch Recalibr & Tested + (20:04:16, 23 December 2024)
- ML20003A342 + (20:04:17, 23 December 2024)
- 05000265/LER-1981-001, Forwards LER 81-001/03L-0 + (20:04:18, 23 December 2024)
- ML20003A338 + (20:04:22, 23 December 2024)
- ML20003A339 + (20:04:22, 23 December 2024)
- ML20003A336 + (20:04:23, 23 December 2024)
- 05000368/LER-1981-001-03, /03L-0:on 810102,during Mode 1 Operation,Leak Was Found at Vent Line Weld on Charging Pump Stabilizer 2M115C. Leak Isolation Rendered Charging Pump 2P36C Inoperable. Caused by Dissolving Slag Inclusion.Weld Was Repaired + (20:04:24, 23 December 2024)
- ML20003A334 + (20:04:25, 23 December 2024)
- ML20003A333 + (20:04:26, 23 December 2024)
- ML20003A332 + (20:04:27, 23 December 2024)
- 05000368/LER-1981-001, Forwards LER 81-001/03L-0 + (20:04:28, 23 December 2024)
- ML20003A328 + (20:04:29, 23 December 2024)
- 05000325/LER-1981-005-03, /03L-0:on 810101,during Normal Surveillance, Discovered Secondary Containment 20 Ft Elevation Inner Air Lock Door Inoperable Due to Missing Gasket Sealing Matl. Caused by High Personnel Traffic.Gasket Replaced + (20:04:30, 23 December 2024)
- ML20003A325 + (20:04:31, 23 December 2024)
- 05000325/LER-1981-005, Forwards LER 81-005/03L-0 + (20:04:32, 23 December 2024)
- B10148, Interim Deficiency Rept Re Misaligned Shopwelds on Main Steam Line Flued Head Penetrations Supplied by Graver Tank Co,Initially Reported on 801205.Review Underway + (20:04:34, 23 December 2024)
- ML20003A322 + (20:04:34, 23 December 2024)
- ML20003A317 + (20:04:37, 23 December 2024)
- ML20003A318 + (20:04:37, 23 December 2024)
- ML20003A316 + (20:04:38, 23 December 2024)
- ML20003A315 + (20:04:39, 23 December 2024)
- ML20003A314 + (20:04:40, 23 December 2024)
- ML20003A313 + (20:04:40, 23 December 2024)
- 05000254/LER-1981-002-03, /03L-0:on 810107,Unit 1 Emergency Diesel Generator Tripped & Failed to Restart.Caused by Loose Fuse in 125 Vdc Engine Starting & Fuel Control Circuit & Misalignment of Output Breaker Auxiliary Contacts.Fuse Holder Tightened + (20:04:42, 23 December 2024)
- ML20003A311 + (20:04:43, 23 December 2024)
- ML20003A310 + (20:04:43, 23 December 2024)
- 05000254/LER-1981-002, Forwards LER 81-002/03L-0 + (20:04:44, 23 December 2024)
- ML20003A307 + (20:04:45, 23 December 2024)
- ML20003A306 + (20:04:46, 23 December 2024)
- ML20003A305 + (20:04:46, 23 December 2024)
- ML20003A303 + (20:04:47, 23 December 2024)
- ML20003A304 + (20:04:47, 23 December 2024)
- ML20003A302 + (20:04:48, 23 December 2024)
- ML20003A301 + (20:04:48, 23 December 2024)
- ML20003A300 + (20:04:50, 23 December 2024)
- ML20003A299 + (20:04:51, 23 December 2024)
- ML20003A297 + (20:04:52, 23 December 2024)
- ML20003A296 + (20:04:53, 23 December 2024)
- 05000296/LER-1981-002, Forwards LER 81-002/03L-0 + (20:04:54, 23 December 2024)
- ML20003A293 + (20:04:56, 23 December 2024)
- 05000338/LER-1981-003-03, /03L-0:on 810104,loop 3 Reactor Coolant Flow Protection Channel II,F-1435,found Out of Tolerance High. Caused by Voltage Drift in Flow Transmitter Serving Loop. Channel Recalibr + (20:04:57, 23 December 2024)
- 05000318/LER-1981-005-01, /01T-0:on 810118,w/reactor Coolant Sys at 220 F & 230 Psia,Presssure Transmitter Failed High,Causing Power Relief Valve RC-404-ERV to Open.Caused by Loose Oscillator/ Amplifier Assembly within Transmitter 2-PT-103-1 + (20:04:59, 23 December 2024)
- 05000338/LER-1981-003, Forwards LER 81-003/03L-0 + (20:05:01, 23 December 2024)
- 05000318/LER-1981-005, Forwards LER 81-005/01T-0 + (20:05:03, 23 December 2024)
- 05000133/LER-1980-008-03, /03L-0:on 801222,during Shutdown,Breaker Supplying Power to One of Four Screen Wash Pumps in Adjacent Fossil Units Failed.Pumps Are Backup Sources of Cooling Water to Suppression Pool Cooler.Caused by Shock of Repeated Cycli + (20:05:04, 23 December 2024)
- 05000133/LER-1980-008, Forwards LER 80-008/03L-0 + (20:05:06, 23 December 2024)
- ML20003A281 + (20:05:08, 23 December 2024)
- 05000320/LER-1980-059, Forwards LER 80-059/03L-0 + (20:05:13, 23 December 2024)
- ML20003A275 + (20:05:15, 23 December 2024)