ML20003A306

From kanterella
Jump to navigation Jump to search
Informs NRC That Info Requested in Re Adequacy of Station Electric Distribution Sys Voltages Was Inadvertently Submitted to Region 2 on 801007.Proposed Tech Specs Will Be Finalized at 810206 Meeting in Bethesda,Md
ML20003A306
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/27/1981
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8102030463
Download: ML20003A306 (1)


Text

Albya Power Company 600 North 18th street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 250-1000 m

F. L CLAYTON, JR.

Senior Vice Presicent Alabama Power the southern electrc system January 27, 1981 Docket No. 50-348 fir. Steven A. Varga, Chief Operating Reactor Branch #1 Division of Licensing U. S. Nuclear Regulatory Comission Washington, D. C.

20555

Dear fir. Varga:

Farley Nuclear Plant - Unit 1 Adequacy of Station Electric Distribution System Voltages The information requested in your July 7,1980 letter on this subject was inadvertently submitted to fir. James P. O'Reilly of Region II by letter dated October 7,1980 entitled " Joseph fi. Farley fluclear Plant -

Units 1 and 2, Degraded Electrical Power Grid Conditions, NRC Staff Position 4," of which you were copied. That response provided a description of the test method used for performing the verification of the analysis and includes the test results. These results validate the voltage profiles and analytical methodology utilized to determine the adequacy of station electric distribution voltages as provided in the December 11, 1979 letter.

The proposed Technical Specifications which were submitted by our letter of October 10, 1979 will be finalized at our meeting in Bethesda on February 6, 1981.

If there are any questions, please contact us.

Very truly yours,

\\

p D

0 y. j-t FN. -Clayto k (n Jr.

FLC/ TLC:de cc: fir. R. A. Thomas

/

lir. G. F. Trowbridge 5

fir. E. A. Reeves O

g fir. W. II. Bradford g

], : D, f ffgj f