Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20003B309 + (19:49:52, 23 December 2024)
- ML20003B308 + (19:49:52, 23 December 2024)
- ML20003B306 + (19:49:53, 23 December 2024)
- ML20003B307 + (19:49:53, 23 December 2024)
- ML20003B305 + (19:49:55, 23 December 2024)
- ML20003B304 + (19:49:56, 23 December 2024)
- ML20003B303 + (19:49:56, 23 December 2024)
- ML20003B301 + (19:49:59, 23 December 2024)
- ML20003B300 + (19:50:00, 23 December 2024)
- ML20003B298 + (19:50:04, 23 December 2024)
- ML20003B297 + (19:50:04, 23 December 2024)
- ML20003B295 + (19:50:05, 23 December 2024)
- ML20003B292 + (19:50:07, 23 December 2024)
- ML20003B291 + (19:50:08, 23 December 2024)
- ML20003B290 + (19:50:09, 23 December 2024)
- ML20003B289 + (19:50:13, 23 December 2024)
- ML20003B286 + (19:50:17, 23 December 2024)
- 05000336/LER-1981-003-03, /03L-0:on 810106,during Routine Insp While in Cold Shutdown,Main Steam Line Snubber 413019 Found W/No Visible Fluid Level.Caused by Plastic Fluid Reservoir Damaged by Overheating During Outage.Defective Snubber Replaced + (19:50:18, 23 December 2024)
- ML20003B282 + (19:50:22, 23 December 2024)
- 05000336/LER-1981-003, Forwards LER 81-003/03L-0 + (19:50:25, 23 December 2024)
- ML20003B277 + (19:50:26, 23 December 2024)
- 05000260/LER-1981-006-03, /03L-0:on 810121,core Max Fraction of Limiting Power Density Exceeded Limit.Caused by Power Increase in Conjunction W/Inoperable Process Computer.Power Reduced & Control Rod Pattern Adjustment Made on 810123 + (19:50:27, 23 December 2024)
- ML20003B273 + (19:50:30, 23 December 2024)
- ML20003B271 + (19:50:31, 23 December 2024)
- ML20003B272 + (19:50:31, 23 December 2024)
- 05000260/LER-1981-006, Forwards LER 81-006/03L-0 + (19:50:32, 23 December 2024)
- ML20003B268 + (19:50:33, 23 December 2024)
- ML20003B267 + (19:50:34, 23 December 2024)
- ML20003B266 + (19:50:35, 23 December 2024)
- ML20003B263 + (19:50:37, 23 December 2024)
- ML20003B260 + (19:50:38, 23 December 2024)
- ML20003B262 + (19:50:38, 23 December 2024)
- ML20003B259 + (19:50:39, 23 December 2024)
- ML20003B258 + (19:50:40, 23 December 2024)
- 05000293/LER-1981-002-03, /03L-0:on 810107,main Stack Sample Flow Alarm Received Twice on Panel C903 in Control Room.Caused by Frozen Suction Line (First Occurrence) & Blown Power Supply Fuse (Second Occurrence) + (19:50:41, 23 December 2024)
- 05000327/LER-1981-007-03, /03L-0:on 810116,level Channel for Steam Generator 3 (L-3-97) Declared Inoperable.Caused by Failure of Trip Bistable 1-LS-3-97F to de-energize.Module Replaced,Calibr & Returned to Svc + (19:50:43, 23 December 2024)
- 05000267/LER-1981-005-03, /03L-0:on 810107,during Surveillance Testing,Trip Setting on PDIS-21177 Bearing Water Differential Pressure Switch Found Below Tech Spec Limit.Caused by Instrument Drift.Switch Adjusted & Returned to Svc + (19:50:45, 23 December 2024)
- ML20003B254 + (19:50:47, 23 December 2024)
- ML20003B253 + (19:50:48, 23 December 2024)
- 05000293/LER-1981-002, Forwards LER 81-002/03L-0 + (19:50:49, 23 December 2024)
- 05000327/LER-1981-007, Forwards LER 81-007/03L-0 + (19:50:51, 23 December 2024)
- ML20003B248 + (19:50:52, 23 December 2024)
- ML20003B247 + (19:50:53, 23 December 2024)
- 05000267/LER-1981-002-03, /03L-0:on 810107,during Normal Operation,Sampling Requirements of SR NR1.1 Found Not Met for Day shift,801225. Caused by Personnel Error.Sampling Resumed on Next Shift & Personnel Reinstructed Re Importance of Requirements + (19:50:55, 23 December 2024)
- 05000327/LER-1981-005-03, /03L-0:on 810114,capacitor C1A in A10 Power Supply & Control Card RB-8 Failed While in Svc.Caused by Failure of Vital Inverter 2-II.Components Replaced & Inverter Returned to Svc on 810114 + (19:50:56, 23 December 2024)
- 05000267/LER-1981-005, Forwards LER 81-005/03L-0 + (19:50:58, 23 December 2024)
- ML20003B241 + (19:51:01, 23 December 2024)
- 05000327/LER-1981-005, Forwards LER 81-005/03L-0 + (19:51:02, 23 December 2024)
- ML20003B238 + (19:51:03, 23 December 2024)
- ML20003B237 + (19:51:03, 23 December 2024)
- 05000260/LER-1981-005-03, /03L-0:on 810119,core Max Fraction of Limiting Power Density Exceeded Limit for One Node in Core.Caused by Operation Close to Limit in Conjunction W/Minor (Normal) Perturbation in Monitored Parameters.Power Reduced Slightly + (19:51:05, 23 December 2024)