Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 2CAN068105, Forwards Response to NRC Verbal Request for Addl Info Re Applicability of Existing Cycle 2 Physics Reload Analysis to Reconstitute Fuel Assemblies + (15:52:10, 23 December 2024)
- ML20004E223 + (15:52:12, 23 December 2024)
- ML20004E224 + (15:52:12, 23 December 2024)
- ML20004E221 + (15:52:16, 23 December 2024)
- ML20004E219 + (15:52:17, 23 December 2024)
- ML20004E218 + (15:52:17, 23 December 2024)
- ML20004E217 + (15:52:18, 23 December 2024)
- ML20004E216 + (15:52:18, 23 December 2024)
- ML20004E215 + (15:52:19, 23 December 2024)
- IR 05000413/1981007 + (15:52:20, 23 December 2024)
- ML20004E213 + (15:52:21, 23 December 2024)
- ML20004E211 + (15:52:22, 23 December 2024)
- ML20004E210 + (15:52:23, 23 December 2024)
- ML20004E209 + (15:52:24, 23 December 2024)
- ML20004E208 + (15:52:25, 23 December 2024)
- ML20004E207 + (15:52:26, 23 December 2024)
- ML20004E206 + (15:52:27, 23 December 2024)
- ML20004E204 + (15:52:29, 23 December 2024)
- ML20004E203 + (15:52:30, 23 December 2024)
- ML20004E202 + (15:52:31, 23 December 2024)
- ML20004E200 + (15:52:32, 23 December 2024)
- 05000348/LER-1981-035-03, /03L-0:on 810511,containment Isolation Valve CCW-MOV-3052,was Declared Inoperable When Valve Position Indication Was Lost.Caused by Blown Control Power Fuse.Fuse Replaced + (15:52:34, 23 December 2024)
- 05000348/LER-1981-034-03, /03L-0:on 810509,train a Refueling Water Storage Tank Level Indicator Failed Low.Cause Undetermined. Investigation Underway.Problem Has Not Recurred + (15:52:37, 23 December 2024)
- RBG-10-501, Advises That Concerns Identified by Instrumentation & Control Sys Branch Will Be Addressed in Amend to 810424 OL Application + (15:52:38, 23 December 2024)
- ML20004E195 + (15:52:39, 23 December 2024)
- 05000348/LER-1981-030-03, /03L-0:on 810505,B1F Sequencer Failed to Meet Time Requirements for Picking Up Step 6 During Testing. Caused by Agastat Timer Being Out of Adjustment.Timer Setpoint Adjusted + (15:52:41, 23 December 2024)
- ML20004E193 + (15:52:42, 23 December 2024)
- ML20004E190 + (15:52:48, 23 December 2024)
- ML20004E189 + (15:52:48, 23 December 2024)
- 05000247/LER-1981-012-01, /01T-0:on 810511,3/4-inch Swagelok Union in Remote Reactor Head Vent Line Parted During Test to Assure Operability of Low Power Injection/Rhr Check Valves Prior to Restart.Caused by Improper Installation.Valve Closed + (15:52:49, 23 December 2024)
- ML20004E187 + (15:52:54, 23 December 2024)
- 05000247/LER-1981-012, Forwards LER 81-012/01T-0 + (15:52:56, 23 December 2024)
- ML20004E182 + (15:52:57, 23 December 2024)
- ML20004E179 + (15:53:00, 23 December 2024)
- ML20004E176 + (15:53:03, 23 December 2024)
- ML20004E175 + (15:53:04, 23 December 2024)
- ML20004E174 + (15:53:06, 23 December 2024)
- ML20004E173 + (15:53:06, 23 December 2024)
- ML20004E172 + (15:53:07, 23 December 2024)
- ML20004E171 + (15:53:08, 23 December 2024)
- ML20004E170 + (15:53:08, 23 December 2024)
- ML20004E168 + (15:53:09, 23 December 2024)
- ML20004E167 + (15:53:09, 23 December 2024)
- ML20004E166 + (15:53:10, 23 December 2024)
- ML20004E164 + (15:53:11, 23 December 2024)
- ML20004E160 + (15:53:13, 23 December 2024)
- ML20004E161 + (15:53:13, 23 December 2024)
- ML20004E157 + (15:53:14, 23 December 2024)
- ML20004E159 + (15:53:14, 23 December 2024)
- ML20004E154 + (15:53:16, 23 December 2024)
- ML20004E156 + (15:53:16, 23 December 2024)