Forwards IE Insp Repts 50-413/81-07 & 50-414/81-07 on 810421-24.No Noncompliance Noted
ML20004E211
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/08/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20004E212 List:
References
NUDOCS 8106110355
Download: ML20004E211 (2)


See also: IR 05000413/1981007

Text

-

9

'.

-

.

>R KEI

d

4

UNITED STATES

!'

,, j")E

NUCLEAR REGULATORY COMMISSION

,

3

/o

REGION 11

"*

o,

101 MARIETTA ST.. N.W.. SUITE 3100

0

ATLANTA. GEORGIA 30303

0

MAY

8 1981

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

Subject: Report Nos. 50-413/81-07 and 50-4.M/81-07

This refers to the routine safety inspection conducted by Mr. A. B. Ruff of this

office on April 21-24, 1981, of activities authorized by NRC Construction Permit

Nos. CPPR-116 and CPPR-117 for the Catawba Nuclear facility and to the discussion

of our findings held with Mr. S. Dressler at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this irspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which it

is claimed that the information is proprietary, and should be prepared so that

proprietary information identified in the application is contained in a separate

part of the document.

If we do not hear from you within the specified period,

the report will be placed in the Public Document Room.

8106110 M

-

.

..

-

.

-

-

_ _,

-

..

y

9

.

/

MAY

81981

Duke Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

-

Sinc

ly

3

'

l1(&

'yg

Division 6f[ Resident and

ewi/ Acting # Director

v R.

Reactor Project Inspection

.

Enclosure:

Inspection Report Nos. 50-413/81-07,

and 50-414/81-07

cc w/ encl:

J. W. Hampton, Station Manager

.

D. G. Beam, Project Manager

!

i

'

l

l

t

l

i.

'

t