ML20004E195

From kanterella
Jump to navigation Jump to search
Responds to 810203 Generic Ltr 81-07 Re Control of Heavy Loads.Nrc Project Manager Confirmed That Util Should Answer Concerns at FSAR Stage
ML20004E195
Person / Time
Site: Marble Hill
Issue date: 06/05/1981
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
GL-81-07, GL-81-7, PSI-NRC-0004, PSI-NRC-4, NUDOCS 8106110327
Download: ML20004E195 (1)


Text

  • // / C)

!!$,bh.ysf()7\\

,s"

-?

~: 10 ;gg/

PUBLIC "W,pw d,$

4./

SERVICE

'U INDIANA

.:: _ L.:./

S. W. Shields Senior Vice President -

Nucteer Division June 5, 1981 PSI /NRC-0004 Mr. Darrell G. Eisenhut, Director Docket Nos.: STN 50-546 Division of Licensing STN 50-547 Of fice of Nuclear Rear.cor Regulation Construction Permit Nos.:

U.S. Nuclear Regulatory Commission CPPR - 170 Washington, D. C. 20555 CPPR - 171 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Eisenhut:

This is in response to Generic Letter 31-07, Control of Heavy Loads, dated February 3, 1981.

Public Jervice Company of Indians, Inc. (PSI) is currently investigating the control of heavy loads at the Marble Hill Nuclear Generating Station. Since PSI is a construction permit holder and does not yet have a final design, Mr. Ken Kiper, NRC Project Manager, confirmed that PSI should answer the concerns of Generic Letter 81-07 at the ?SAR stage.

If you have any questions, please feel free to contact me.

Sincerely, s

S. W. Shields LGY/mjg cc:

J. G. Keppler E. R. Schweibinz, P. E.

J. J. Harrison O'

QO3 /

// 0 4

P. O. Box 190, New Wasnington, Indiana 47162 812. 289.1000 8106.11 O M