Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20006B385 + (11:49:16, 23 December 2024)
- ML20006B384 + (11:49:17, 23 December 2024)
- ML20006B382 + (11:49:18, 23 December 2024)
- ML20006B381 + (11:49:19, 23 December 2024)
- ML20006B380 + (11:49:21, 23 December 2024)
- ML20006B378 + (11:49:22, 23 December 2024)
- ML20006B361 + (11:49:25, 23 December 2024)
- ST-HL-AE-3346, Forwards Rev 4 to Pump & Valve Inservice Test Plan. Rev Includes Addition of Component Cooling Water Valves FV-0864,FV-0862 & FV-0863 & Containment Sys Valves FV-1025, FV-1026,FV-1027 & FV-1028 + (11:49:27, 23 December 2024)
- ML20006B337 + (11:50:12, 23 December 2024)
- ML20006B333 + (11:50:17, 23 December 2024)
- ML20006B328 + (11:50:20, 23 December 2024)
- ML20006B316 + (11:50:23, 23 December 2024)
- ML20006B299 + (11:50:27, 23 December 2024)
- ML20006B296 + (11:50:28, 23 December 2024)
- ML20006B288 + (11:50:30, 23 December 2024)
- 05000416/LER-1989-017, :on 890718,determined That Isolation for Postulated RWCU Blowdown Line Breaks in Piping Cold Rooms Was 80 S,Causing Plant to Operate in Unanalyzed Condition. Tech Spec Change Request Will Be Submitted + (11:51:12, 23 December 2024)
- ML20006B277 + (11:51:21, 23 December 2024)
- ML20006B272 + (11:52:05, 23 December 2024)
- TAC:44315 + (11:52:06, 23 December 2024)
- ML20006B267 + (11:52:11, 23 December 2024)
- ML20006B266 + (11:52:15, 23 December 2024)
- ML20006B263 + (11:52:17, 23 December 2024)
- ML20006B260 + (11:52:20, 23 December 2024)
- B13437, Responds to NRC Re Violations Noted in Insp Rept 50-213/89-22 Re Health Physics Training Requirement. Violation Contested Based on NRC Misinterpretation of Tech Spec 6.4.1 Re Training/Replacement Training Program + (11:52:27, 23 December 2024)
- ML20006B258 + (11:52:31, 23 December 2024)
- ML20006B256 + (11:52:33, 23 December 2024)
- 05000498/LER-1989-022-01, :on 891205,discovered That ASME Section XI Pressure Test of Train C of Component Cooling Water Sys Not Performed Prior to Returning Sys to Svc.Sys Inoperable from 890909-1206.Test Control Procedures Revised + (11:53:06, 23 December 2024)
- ML20006B244 + (11:53:16, 23 December 2024)
- ML20006B238 + (11:53:18, 23 December 2024)
- PNO-IV-90-005, on 900122,solenoid Valve Failure Caused in-plant Spill of 10,000 to 20,000 Lb of Depleted UF4 Powder.One Worker Inhaled or Ingested Small Amount of Matl. Analysis of Urine & Fecal Samples Underway + (11:53:23, 23 December 2024)
- ML20006B232 + (11:53:25, 23 December 2024)
- ML20006B230 + (11:53:29, 23 December 2024)
- ML20006B229 + (11:53:32, 23 December 2024)
- TAC:74858 + (11:53:33, 23 December 2024)
- ML20006B227 + (11:53:38, 23 December 2024)
- ML20006B226 + (11:53:41, 23 December 2024)
- ML20006B223 + (11:53:42, 23 December 2024)
- 05000498/LER-1989-023-01, :on 891216,standby Diesel Generator 11 Failed Tech Spec Required Operability Test & Attempt to Secure Essential Chiller 12C Resulted in Trip.Caused by Failure of Voltage Regulator.Regulator Returned to Mfg + (11:54:16, 23 December 2024)
- ML20006B220 + (11:54:21, 23 December 2024)
- ML20006B218 + (11:54:28, 23 December 2024)
- ML20006B217 + (11:54:29, 23 December 2024)
- ML20006B216 + (11:54:30, 23 December 2024)
- ML20006B209 + (11:54:32, 23 December 2024)
- 05000456/LER-1989-019-04, :on 891219,discovered That Procedure Did Not Adequately Test Response Times for High Steamline Pressure Rate Steamline Isolation Signal.Caused by Deficient Procedure.Procedures Re Response Time Revised + (11:54:54, 23 December 2024)
- ML20006B201 + (11:55:03, 23 December 2024)
- ML20006B199 + (11:55:08, 23 December 2024)
- ML20006B193 + (11:55:11, 23 December 2024)
- ML20006B190 + (11:55:12, 23 December 2024)
- ML20006B188 + (11:55:15, 23 December 2024)
- ML20006B185 + (11:55:16, 23 December 2024)
- ML20006B184 + (11:55:17, 23 December 2024)