Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009G194 + (13:08:15, 21 December 2024)
- ML20009G193 + (13:08:16, 21 December 2024)
- 05000339/LER-1981-049-03, /03L-0:on 810612,during Periodic Test,Casing Cooling Pump 2-RS-P-3A Tripped.Caused by Power Supply Breaker Opening on Overcurrent Due to Excessive Load Created by Misalignment of Bearing Holders & Caps.Bearings Aligned + (13:08:18, 21 December 2024)
- 05000369/LER-1981-061, Forwards LER 81-061/03L-0.Detailed Event Analysis Encl + (13:08:20, 21 December 2024)
- ML20009G187 + (13:08:23, 21 December 2024)
- 05000260/LER-1980-058, Forwards Updated LER 80-058/03X-1 + (13:08:24, 21 December 2024)
- ML20009G184 + (13:08:25, 21 December 2024)
- 05000369/LER-1981-073-03, /03L-0:on 810428,RHR Isolation Valve 1ND1B Failed to Reopen Following Stroke Test.Cause Not Determined.Limit Switches Adjusted & Functioned Properly When Cycled + (13:08:27, 21 December 2024)
- ML20009G180 + (13:08:30, 21 December 2024)
- 05000339/LER-1981-049, Forwards LER 81-049/03L-0 + (13:08:31, 21 December 2024)
- 05000324/LER-1981-052-03, /03L-0:on 810609,reactor Recirculation Pump Motor Generator 2A Tripped During Unit Load Changes.Cause Unknown. Dirty Electrical Contacts Found in Field Breaker Closure Circuitry Cleaned + (13:08:33, 21 December 2024)
- 05000364/LER-1981-021-03, /03L-0:on 810606,overtemp-delta Temp Instrumentation Loop Trip Setpoint Failed to Meet Tolerance Requirements.Caused by Gain Potentiometer Being Out of Adjustment.Potentiometer Adjusted + (13:08:34, 21 December 2024)
- 05000335/LER-1981-029-03, /03L-0:on 810528,while Performing Engineered Safety Feature Channel Functional Test,Steam Generator Pressure Channel Mc Setpoint Was Less than Tech Specs. Cause of Drift Undetermined.Setpoint Adjusted + (13:08:36, 21 December 2024)
- ML20009G173 + (13:08:38, 21 December 2024)
- 05000369/LER-1981-073, Forwards LER 81-073/03L-0.Detailed Event Analysis Encl + (13:08:39, 21 December 2024)
- 05000324/LER-1981-059-01, /01T-0:on 810629,valve Lineup for Loop a of RHR in Standby Readiness Was Incorrect.Caused by Control Operator Commencing Plant Startup W/O Knowing That Valve F020A Was Open.Rods Inserted & Sys Lineup Verified + (13:08:41, 21 December 2024)
- 05000364/LER-1981-021, Forwards LER 81-021/03L-0 + (13:08:42, 21 December 2024)
- 05000324/LER-1981-052, Forwards LER 81-052/03L-0 + (13:08:47, 21 December 2024)
- 05000260/LER-1981-032-03, /03L-0:on 810702,equipment Air Lock Door 238 Was Not Properly Latched Before Opposite Door Was Opened.Caused by Personnel Error.Personnel Instructed in Correct Operation of Doors + (13:08:49, 21 December 2024)
- 05000369/LER-1981-055-03, /03L-0:on 810416,cold Leg Injection Accumulator Declared Inoperable Due to High Level Alarm.Caused by Cold Leg Accumulator Discharge Check Valves Leaking.Valves to Be Repaired & Retested + (13:08:51, 21 December 2024)
- ML20009G163 + (13:08:52, 21 December 2024)
- 05000335/LER-1981-029, Forwards LER 81-029/03L-0 + (13:08:53, 21 December 2024)
- 05000369/LER-1981-055, Forwards LER 81-055/03L-0.Detailed Event Analysis Encl + (13:08:57, 21 December 2024)
- 05000324/LER-1981-059, Forwards LER 81-059/01T-0 + (13:08:58, 21 December 2024)
- IR 05000333/1981014 + (13:09:01, 21 December 2024)
- 05000260/LER-1981-032, Forwards LER 81-032/03L-0 + (13:09:03, 21 December 2024)
- 05000335/LER-1981-032-03, /03L-0:on 810624,plant Personnel Determined Periodic Test of AB Battery Charger Had Not Been Performed. Caused by Interpreting Tech Specs Precisely.Test Satisfactorily Performed + (13:09:05, 21 December 2024)
- ML20009G151 + (13:09:06, 21 December 2024)
- ML20009G149 + (13:09:07, 21 December 2024)
- 05000335/LER-1981-032, Forwards LER 81-032/03L-0 + (13:09:08, 21 December 2024)
- ML20009G145 + (13:09:09, 21 December 2024)
- ML20009G144 + (13:09:10, 21 December 2024)
- ML20009G143 + (13:09:10, 21 December 2024)
- 05000259/LER-1981-033, Forwards LER 81-033/03L-0.Supersedes + (13:09:13, 21 December 2024)
- 05000311/LER-1981-039-03, /03L-0:on 810608,determined post-accident Monitoring Instrumentation Had Not Been Completed Since 810422.Caused by Personnel Failure to Enter New Procedure Info Notification Sys.Personnel Counseled + (13:09:15, 21 December 2024)
- ML20009G138 + (13:09:16, 21 December 2024)
- IR 05000352/1981009 + (13:09:17, 21 December 2024)
- IR 05000029/1981006 + (13:09:28, 21 December 2024)
- 05000311/LER-1981-043, Forwards LER 81-043/03L-0.Detailed Event Analysis Encl + (13:09:29, 21 December 2024)
- ML20009G132 + (13:09:31, 21 December 2024)
- 05000311/LER-1981-039, Forwards LER 81-039/03L-0.Detailed Event Analysis Encl + (13:09:33, 21 December 2024)
- 05000311/LER-1981-042-03, /03L-0:on 810609,RCS Allowed to Decrease to Less than 541 F.Caused by Overfeeding Steam Generators & Inserting Control Rods.Control Rods Withdrawn & Personnel Counseled on Plant Procedures & Practices + (13:09:34, 21 December 2024)
- ML20009G127 + (13:09:36, 21 December 2024)
- ML20009G128 + (13:09:36, 21 December 2024)
- ML20009G126 + (13:09:37, 21 December 2024)
- 05000311/LER-1981-041-03, /03L-0:on 810612,leakage of 13 Gpm Into Pressurizer Relief Tank Identified.Caused by RHR Suction Piping Relief Valve (2RH3) Actuating at Less than Design Lift Setting & Failing to Reseat.Lift Setting Readjusted + (13:09:38, 21 December 2024)
- ML20009G122 + (13:09:40, 21 December 2024)
- ML20009G123 + (13:09:40, 21 December 2024)
- 05000311/LER-1981-042, Forwards LER 81-042/03L-0.Detailed Event Analysis Encl + (13:09:42, 21 December 2024)
- 05000261/LER-1981-016-03, /03L-0:on 810611,during Startup,Motor Driven Auxiliary Feedwater Pump a Tripped Due to Low Discharge Pressure While Feeding Steam Generators.Event Reoccurred on 810716.Caused by Backleakage Through Discharge Valve AFW-40 + (13:09:44, 21 December 2024)
- ML20009G115 + (13:09:45, 21 December 2024)