ML20009G193

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-238/81-01 on 810618-19.No Noncompliance Noted.Major Areas inspected:14 Inspector/Hours Onboard Performing Radiation Surveys in Areas to Be Open for Public Tours
ML20009G193
Person / Time
Site: NS Savannah
Issue date: 07/16/1981
From: Franklin L, Hosey C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20009G174 List:
References
50-328-81-01, 50-328-81-1, NUDOCS 8108030411
Download: ML20009G193 (4)


See also: IR 05000238/1981001

Text

.

g

. 2-

m WL .- -

K: =2 WM MMAQ5255WE'*S'h,

.

'

' '

[p pr:0,D

' , '

o

UNITED ST ATES

/ *'n

NUCLEAR REGULATORY COMMISSION

J's

5 -h]h E

REGION 11

'y[4 ;/f

ici MAnn T t A sr . N w . stoT c 3100

<,y

w * f

AR A4 TA, GEORGI A 30303

.....

Report No. 50-238/81-1

\\

Licensee:

United States Department of Ccemerce

Maritime CcT. mission M-930

Washington, DC 20230

Facility flame:

N. S. 3avannah

Oc -ket tio. 50-238

License flo. NS-1

Inspection at North Charleston, SC

ejg.

'7 ~/ 6 - 8 /

Inspector: _c

,

L. A. Franklin '

Oata Signed

Acccmpanying Personnel:

P. McPhail

Approved by:

8

)

l

[

C. MT Ac

.n e f

- " Jate Signed

Technica/eh .kting Sc ction

!

l Inspection jranch

Engineering and Technical Inspection Division

,

SUMMARY

Inspectio~ on June 18-19, 1981

Areas Inspected

This spec 4al announcea inspection was confirmatory in natura.

The inspection

involved 14

nspector-hours onboard, primarily performing radiation surveys in

i

areas that will ultimately be open for public tours.

Within the scopc of this inspection, no violations or deviati ns we a disclosed.

8108030411 810724

PDR ADOCK 05000

P

____

_ _ _ _ _ _ _ _ _ _ _ _ _ .

.

,

,.

.

.

'

.

1,

i

1

REPORT DETAILS

'

'

1.

Persons Contacted

Licensee Employees

i

I

  • C

Clausen, Representative, Maritime Commissitn

I

Other Organizations

i

-

l

R. Marsh, Chief Contracting Officer, North Charleston Army Depot

!

  • T. Hathcock, Representative, Global Associates
  • J. Pitchell, Representative, Global Associates
  • Attended exit interview

j

,

j

2.

Exit Interview

i

i

The inspection scope 3nd findings were sum.,arized on June 19, 1981, with

i

those persons indicated in paragraph 1 above.

j

3.

Survey Results

-

i

l-

A proposed license amencnent, which will add the Soutn Carolina Patriots

l

Point Development Authority to the license, calls for all areas accessible

l

to the public and employees to have radiation levels of less than 5 pR/Hr,

above background, at 1 mettr from any surface. This inspection determined

tnat certain areas, presently accessible, exceed this level. The inspec-

I

tors stated that a followup survey should be performed af ter work in

progress is completed and actual tour routes, etc., are clearly defined.

,

,

Background readings were established at two points; the stern and the bow of

I

the ship. Both of these points showed a 3.0 pR/Hr reading.

In addition, a

background reading was taken on the bridge and showed 3.7 pR/Hr. A pres-

'

surized ion chamber was used for background readings.

Eberline micro

"R"

' meters were used for all survey points and showed a background, on tht bew

and stern of 2.5 pR/Hr.

(Micro R/Hr

i

"A" Deck

Includes Bkg).

At Fire Station #14, Port Passageway.

.2.5

.

. .

Center of Main Lobby.

.2.5

. .

....

.

.. . .

At Fire Station #16, Port Passageway.

.2.0

l

At Fire Station #17, Starboard Passageway

.2.0

. . ..

. .

.

At Fire Station #15, "tarbcard Passageway

Areas Outside Doctor s Office and Pealth Physics Lab..

.2.0

.

'

.2.5

i

.

,

!

I

.

NYY

'

,

s

e

,

'

o

2

"B" Deck

At Fire Station #20, Port Passageway.

.1.5

.

.

At Fire Station #22, Port Passageway.

.2.0

.

.

.

Passageway outside Steward's Mess & Lounge, Port Side

.5.0

Center of. Main Dining Roon.

Center of Conference Room, Af t.

.

.2.0

.

.

...

.2.0

..

.

.

At Fire Station #21, Starboard Side .

.1.5

..

Passageway Outside Reactor Space Water Tight Door, Closed .2.0

Inside Main Galley.

.2.0

. . . . . .

.

.

.

. .

Inside Main Scullery, Galley Area .

.

2.0

.

.

Officer & Mess, Port Side .

.2.0

. .

..

.

Fan Room, Starboard Side.

.4.0

. . . .

.

.

"C" Deck

Visi+or's Gallery, Port Side.

.2.0

.

Visit ( *'s Gallery, Mid-Ship .

.2.0

.

.

. .

Visitui's Gallery, Starboard Side

.2.0

.

.

Outside Forward Control Door, Port Side (Door Closed)

.2.0

Zone 9. .

55.0

.

.

. .

.

..

.

"0" Deck

At Reactcr Control Center .

.1.0

,

Outside of Hot Chem Lab Door.

.2.0

.

.

Engine Room Toilet, Port Side

.2.5

Upper Level, Engine Room, Port Side .

.1.0

.

.

.

Upper Level

Engine Room, Starboard Side.

.1.5

.

Machine shop, Aft of Control Center

.

.1.0

Fire Station No. 31, Starboard Side

95.0

.

ENGINE ROOM - LCWER LEVEL

Outside Port Pump Hatch, Closed .

.9.0

.

...

.

Outside Starboard Pump Room Hatch, Closed

10.3

.

Lower Level, Engine Room, Port Side .

.2.0

.

Lower Level, Engine.Rcom, Starboard Side.

.1.0

14' - 0" FLAT

Outside Port Stabilizer Room Hatch, Closed.

12.0

.

Outside Starboard Stabilizer Room Hatch, Closed

.2.0

.

CARGO HOLD NO. 4

At Aft Bulkhead, "B" Deck Level (Next to Forward Control) .6.0

At Aft Bulkhead, "C" Deck Level (Next to Forward Control) 30.0

At Aft Bulkhead,

"D" Deck Level

.

110.0

. . - .

.

,

3

NAVIGATION BRIDGE DECK

In Pilot House At Helm.

.1.0

....

Bridge Wing, Port Side. .

.

.

.l.0

.

. .

Bridge Wing, Starocara Side .

.

.1.0

..

At Fire Station #1, Near Chart Room

.

.1.5

In Fan Room, Port Side, Emergency Generator Room.

.

.

.

.1.0

.

BOAT DECK

Chief Engineer's State Room, Port Side.

.2.0

Captein's State Room, Starboard Side.

.

. .

2.0

At Fire Station #2, Port Side Passageway.

.

2.0

..

In Officer's Lounge, Aft.

.

.1.5

.

At Fire Station #2, Starboard Weather Deck. .

.

...

.1.0

.

..

PROMENADE DECK

At Aux. Reactor Hatch and Cucts, Forward of Reactor Hatch .1.0

Port Side of Main Reactor Hatch. .

.1.0

.

.

.

.

.

At Fire Station #5 near Starboard Side of Reactor Hatch

.1.0

At Fire Station #4, Fort Side Prom Deck .

'

.2.0

Center of Main Lounge .

...

.

. . . . .

2.0

.. ... .

....

'

Center of Veranda

.

2.0

. ..

......

At Fire Station #7, 'tarboard Side Prom Deck. . .

. . .

2.5

~

..

..

In Pantry, Port Side of Promenade Deck.

. . . . . .

2.0

Weather Decks Forward .

.

. . . .

1.1

....

..

..

Weather Decks Aft .

. .

1.0

. ...

.. ...

..

..

Flying Bridge and Top of Housing.

. .

1.0

..

.