Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20010A193 + (12:40:02, 21 December 2024)
- ML20010A191 + (12:40:03, 21 December 2024)
- ML20010A190 + (12:40:04, 21 December 2024)
- ML20010A189 + (12:40:05, 21 December 2024)
- ML20010A187 + (12:40:06, 21 December 2024)
- ML20010A186 + (12:40:07, 21 December 2024)
- ML20010A185 + (12:40:08, 21 December 2024)
- ML20010A184 + (12:40:09, 21 December 2024)
- ML20010A182 + (12:40:09, 21 December 2024)
- ML20010A181 + (12:40:11, 21 December 2024)
- ML20010A179 + (12:40:12, 21 December 2024)
- ML20010A178 + (12:40:13, 21 December 2024)
- ML20010A177 + (12:40:14, 21 December 2024)
- ML20010A175 + (12:40:15, 21 December 2024)
- ML20010A174 + (12:40:15, 21 December 2024)
- ML20010A173 + (12:40:17, 21 December 2024)
- ML20010A168 + (12:40:20, 21 December 2024)
- 05000298/LER-1981-017-03, /03L-0:on 810613,reactor Core Isolation Cooling Sys Steam Supply Valve RCIC-MOV-M016 Failed to Open.Caused by Improperly Wired Motor Operator Circuit.Jumper Installed + (12:40:21, 21 December 2024)
- 05000298/LER-1981-017, Forwards LER 81-017/03L-0.Detailed Event Analysis Encl + (12:40:23, 21 December 2024)
- 05000267/LER-1981-041-03, /03L-0:on 810616,control Room Exhaust Damper Failed to Close.Caused by Dust Accumulation on Damper Vanes. Damper Operated Properly When Retested.Preventive Maint Program to Be Developed to Inspect & Clean Vanes + (12:40:25, 21 December 2024)
- ML20010A159 + (12:40:26, 21 December 2024)
- 05000267/LER-1981-041, Forwards LER 81-041/03L-0.Detailed Event Analysis Encl + (12:40:27, 21 December 2024)
- ML20010A152 + (12:40:29, 21 December 2024)
- 05000366/LER-1981-070-03, /03L-0:on 810703,HPCI Turbine Exhaust Diaphragm Pressure Switches 2E41-N012A & D Actuated High During Testing.Caused by Setpoint Drift.Switches Recalibr Per Barksdale Pressure Switch Calibr Procedure & Tested + (12:40:30, 21 December 2024)
- AECM-81-296, Forwards Revised 810731 Response to Human Factors Engineering Branch Review of Control Room + (12:40:35, 21 December 2024)
- 05000366/LER-1981-070, Forwards LER 81-070/03L-0 + (12:40:39, 21 December 2024)
- 05000254/LER-1981-013-03, /03L-0:on 810717,while Performing High Drywell Pressure Calibr & Functional Test,Pressure Switch PS-1-1001-88C Tripped at 2.03 Psig.Caused by Instrument Setpoint Drift.Pressure Switch Recalibr & Tested + (12:40:40, 21 December 2024)
- ML20010A144 + (12:40:42, 21 December 2024)
- 05000254/LER-1981-013, Forwards LER 81-013/03L-0 + (12:40:43, 21 December 2024)
- ML20010A140 + (12:40:45, 21 December 2024)
- 05000298/LER-1981-018-03, /03L-0:on 810625,pressure Switch NBI-PS-52A Found W/Trip Point Less Conservative than Tech Spec.Apparently Caused by Setpoint Drift.Switch Readjusted.Setpoints for Switches Reset + (12:40:46, 21 December 2024)
- ML20010A138 + (12:40:49, 21 December 2024)
- 05000298/LER-1981-018, Forwards LER 81-018/03L-0.Detailed Event Analysis Encl + (12:40:51, 21 December 2024)
- ML20010A135 + (12:40:52, 21 December 2024)
- ML20010A134 + (12:40:52, 21 December 2024)
- ML20010A129 + (12:40:57, 21 December 2024)
- ML20010A130 + (12:40:57, 21 December 2024)
- ML20010A127 + (12:40:58, 21 December 2024)
- ML20010A125 + (12:40:59, 21 December 2024)
- ML20010A121 + (12:41:00, 21 December 2024)
- ML20010A120 + (12:41:01, 21 December 2024)
- ML20010A119 + (12:41:01, 21 December 2024)
- ML20010A118 + (12:41:02, 21 December 2024)
- ML20010A116 + (12:41:03, 21 December 2024)
- ML20010A117 + (12:41:03, 21 December 2024)
- ML20010A115 + (12:41:04, 21 December 2024)
- ML20010A113 + (12:41:05, 21 December 2024)
- ML20010A112 + (12:41:06, 21 December 2024)
- ML20010A111 + (12:41:07, 21 December 2024)
- IR 05000348/1981013 + (12:41:08, 21 December 2024)
- ML20010A109 + (12:41:09, 21 December 2024)