ML20010A125
| ML20010A125 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/24/1981 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20010A126 | List: |
| References | |
| CPPR-109-A-2, NUDOCS 8108110093 | |
| Download: ML20010A125 (4) | |
Text
.
y c[s f
y 1
e
+
1 s
+
4 -.
UNITED STATES NUCLEAR REGUALTORY COMMISSION DOCKET NO. 50-424 GEORGIA POWER C0ftPANY OGLETHORPE ELECTRIC MEMBERSHIP CORPORATION HUNICIPAL ELECTRIC AUTHORITY OF GEORGIA-CITY OF DALTON, CEORGIA ALVIN W. V0GTLE NUCLEAR PLANT, UNIT-l
NIENDMENT TO CONSTRUCTION PERHIT, s
-~ '
Amendment No. 2 Construction Permit Nn. CPPR-108 n
1.
The Nuclear Regulatory Coevaission (the Commission) having found that:
i A.
The application for amendment by Georgia Power Company, dated December 19, 1980, and supplemented by letter dated December 30, 1980, as previously_
discussed in a letter dated August 21, 1979, complies with the standards and requirements of the Atomic. Energy Act of 1954, as amended (the Act) and the Consatssion's regulations set forth in 10 CFR Chapter I; B.
The issuance of this amendment will~ not be inimical to the common defense and security nor to the health and safety of the public; and C.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
D.
hior public notice of this amendment was published in the. Federal i
egister on February 24,1981 (46 FR 13865).
2.
Accordingly, Construction Permit No. CPPR-108 is amended to reflect a change in the plant design as follows:
Revise paragraph 3.C. to read:
3.C.
This constructicn permit authorizes the applicant to construct the facility described in the application and the hearing record, as amended through Amendment No. 2 in accordance
'with the principal architectural and engineering criteria l
and environmental protection cocinitments set forth therein.
810g110093 8107 4eoa aoocx osooogag._...............
- ~ ~ ~ ~ ~ - - -
~ ~ ~ ~ ~ - - - -
- - ~ ~ ~ ~ ~ ~ -
~ ~ - - - - -
- -4
......,...........l.......................................
"O we ronu aiano soccu eno:
OFFICIAL RECORD COPY
.usceo i 80-meu
n y
y s
6q b,
g g
o
+
e
..~.,s--
a e '
Add a new paragraph 3.D.:
3.D.
The replacement of the enclosure building with an equipment building from grade to the 270 foot-level and a more l
restrictive containment leak rate is acceptable.
3.
This amendment is effective as of the date of its issuance.
l FOR TliE NUCLEAR REGULATORY C0hf11SSION L
l l
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Date of Issuance:
JUL 2 41981 l
l l
l l
l l
l
[
t p'(/*F
-x
,.h 9
L/
/
u m.
w orr,cr > D..L..: LB.# 1.. D..L..:7.B.#
.O..E. L.D..p.......D..L
..D. L...i.,/..L.........
..D..L..R..'.......
L 9
- **** "' ) MRustDy g
/,1,g,,JG,rgM,,,,,,
.BJ J
p.d..RL n'd.es.c9....
.. D.. j...gn b.y.ti...
og,p /UUl'..'...... 7/ 0/ 81 T
,,,9..,,...,... 7/i /8 7/ /81 7]
(..)g/81
. g /81
....A p..............
. OFFICIAL RECORD cop
- nac row sia no,soi nacu o24o
- usus2 e24
,7 g.-
7 g
g g'
y, e,
q 9 4, s
UhlTED STATES huCLEAR REGUALTORY C0 Hili 5SION DOCKET NO.30-425 GEORGIA POWER COMPANY OGLETHORPE ELECTRIC llEllBERSHIP CORPORATION Mul41CIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA ALVIH W. V0GTLL huCLE/R PLANT, UNIT 2 N!ENDNENT TO CONSTRUCTIOh PERHIT Amendment No. 2 Construction Pennit No. CPPR-109 1.
The Nuclear Regulatory Comaission (the Concission) having found that:
A.
The application for amendment by Georgia Power Company, dated Deceraber 19, 1980, and supplemented by letter dated December 30, 1980, as previously discussed in a letter dated August 21, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amer.ded (the Act) and the Coi.raission's regulations set forth in 10 CFR Cnapter I; 8.
The issuance of this anendment will not be iniaical to the cormon deferise ano security nor to the health and safety of the public; and C.
The issuance of this amenduent is in accordance with 10 CFR Part 51 of tne Cor.anission's regulations and all applicable requirements have been satisfied.
D.
Prior public notice of tnis anenoment was published in the Federal Register on February 24, 1981 (46 FR 13865).
2.
Accordingly, Construction Permit No. CPPR-109 is amended to reflect a change in the plant design as follows:
Revise paragraph 3.C. to read:
3.C.
This construction pennit authorizes the applicant to construct the facility described in the application and the hearing record, as amended through Amendment No. 2 in accordance with the principal architectural and engineering criteria and environmental protection corn 11tnents set forth therein.
omcM
" "')
om) m.c muu me no somcu cuo OFFICIAL RECOR0 COPY
' "" ** 3 2 * *2 '
- T1
[7-lT
.3
/
16 -
A LT A
O
-Q Add a new paragraph 3.D.:
3.D.
The replacement of the enclosure building with an equipment building from grade to the 270 foot-level and a more restrictive containment teak rate is acceptable.
3.
This amendment is effective as of the date of-its issuance.
l FOR THE NUCLEAR REGULATORY C0ft11SSI0h I
original signedtifg L.
Darrell G. Eisenhut' Darrell G. Eisenhut Director Division of Licensing Office of Nuclear Reactor Regulation Date of Issuance:
JUL 2 41981 e
l 4
d l
I q
,h f,(/
j
. L e*/
n_
e
- .1....... 0..E..L. D..$'I
.DL.
3. /........
D.. h...L......... -
R.......
...D.L.:..L.B,Mf 5 omce > D. L.:..L. B # 1......
- "'> ttR kl.1 g..JGrE
...................B d Y.o t oo.d..RL.T s.c n.......D... n. H t....
...g................7/ fpl81 7
/81 om) 7/7/ 1 7/6 /p1 7/ 4 /81 7/
/
...... s....
OFFICIAL RECORD COPY '
~
- = a- =2' wac ronu aisiio coinacu o24o