j JUN 10 'M Docket No. 99900741/81-01 Power Conversioi. Products, Inc.
ATTN: Mr. E. S. Weil
\\
0 President
.it D
42 East Street
\\d V,
^ 3/
Crystal Lake, Illinois 60014
{'
Gentlemen:
VQp This refers to the inspection conducted by L. E. Ellershaw of this office on April 13-16, 1981, of your facility at Crystal Lake, Illinois, associated with the fabrication of safety related Class IE battery chargers and to the discus-sions of our findings with you and members of your staff at the conclusion of the 'nspection.
This,wpection was made as a result of the issuance of a 10 CFR Part 21 Report by Brown & Root Inc. (B&R) pertaining to your control of procurement activities and manufacturing practices for battery chargers that have been furnished to the South Texas Project Units 1 and 2.
Areas examined and our findings are discussed in the enclosed report. Within these araas, the inspection consisted of an examination of procedures and represci.cative records, interviews with personnel, and observations by the inspector.
During the inspection it was found that the implementation of your QA program failed to meet certain HRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within 30 days of the date of this letter a written state-ment containing (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for a good cause shown.
TEo7 In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the erclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you
/f believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) sub-mit within 25 days from the date of tnis letter a written application to this 8100110163 810610 PDR OA999 EMVPOWER PDR 99900741 WPll/RI RISg.6, VI
,y,,,
M..w.l e. s.
p.IBames.
..UPqta m s.,
0.U m,
""> 6/4/84..
6(E(81..
6/g81...
6;'.. (81..
NiC FORM 318 0 0-80) NRCM 0240 OFFICIAL RECORD COPY
' f Yll[ff.' y c p u t p
(?
,fF Power Conversion Products, Inc.
, ' < 2, ]
1 qr.
4
.c s.
office ~to withhold such information.
If your mceipt of this letter has been e1, delayed such that less than seven days are available for your review, please notify this office promptly so that a new due data may be established.
, Consistent with Section 2.790(b)(1),any such application must be accompanied ~ ~
~_
- by an affidavit n aruted bf the owner of the information which identifies the
.7 document or part sought to be withheld, and which contains a full statement of the reasons en the basis which it is claimed that the infonmation should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted ateve, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
^
~
Sincerely.
- aristnet sisned b5
[ ; ',,.
. 12 s,p
- u. PcTAPCNS*'
- x..
-- " c ' Uldis Potapovs, Chief
.C Vendor Inspection Branch
Enclosure:
1.
Notice of Nonconformance 2.
Inspection Report No. 99900741/81-01 bec:
Chief, V&SPB, DR&RRI, HQS (Reinmuth)
IE Files NRR:DPM:QAB Reg. Directors, I, II, III, V Central Files PDR HQS JEGagliardo, RIV 9