Forwards QA Program Insp Rept 99900334/81-01 on 810406-08 & Notice of Nonconformance
ML20010A187
Person / Time
Issue date: 05/27/1981
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Boyer R
TRANSAMERICA DELAVAL, INC.
Shared Package
ML20010A188 List:
References
REF-QA-99900334 NUDOCS 8108110158
Download: ML20010A187 (2)


Text

q 2

O.

Q IE G~La copy x

\\

\\.b N[

%9

@/

-2 Docket No. 99900334/81-01 9

2 7 MAY 1981 M

[#

}'

Transamerica Delaval Inc.

Engine Compressor Division g#

ATTH: Mr. R. E. Boyer i \\z y Quality Assurance Manager o) 550 85th Avenue Oakland, California 94621 Gentlemen:

This refers to the QA program conducted by Mr. V. H. Hunter of this office on April 6-8,1981, of your facility at Oakland, California associated with the fabrication of diesel generators and to the discussions of our findings with Mr. C. S. Mathews and members of your itaff at the conclusion of the inspection.

This inspection was ns.de to confinn th.tt, in the areas inspected, your QA program is being effectively implemented.

The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being achieved; nor to assure that a specific product, component, or service provided by you to your customers is of acceptable quality. As you know, the NRC requires cach of its licensees to assume full responsibility

?

for the quality of specific products, components, or services procured from others. You should, therefore, not conclude that the NRC's inspection l

exempts you from inspections by an HRC licensee or his agents, nor from taking effective corrective action in response to their findings.

Areas examined and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your 0A program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within 30 days from the date of this letter a written

~IEo'/

statement containing, (1) a description of steps that have been, or will s

be taken, to correct these items, (2) a descri

/

or will be taken, to prevent recurrence; and (ption of steps that have been,

3) the date your corrective actions and preventive measures were, or will be, completed.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this 1

letter and the enclosed inspection report will be placed in the NRC's Public Docment Room. If this report contains any infonnation that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your (jf IE DD-R VIB j omcr >

-WPU C....g sdT1'

' "UF6tapon" "JG indu "D Cotlins-

...L istF/dsif

,_4 W......

8108110158 010527 3 ~/"81 5/3C/81 5/$s/81 5/329/81

~"""

PDR OA999 ENVTRANA N

> useo umo-m m.

~_

1ransamerica Delaval Inc.

2 intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven days are available for your review, please notify this office promptl{(1),

so that a new due date may be established. Consistent with Section 2.790(b, any such application must be accompanied bi an affidavit exac;ted by the owner of the information which identifies the document ur part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considera-tions listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely.

Uldis Potapovs Chief Vendor Inspection Branch

Enclosures:

1.

Notice of Deviation 2.

Inspection Report Ho. 99900334/81-01 bcc:

Chief, V&SPB, DR&RRI, HQS (Reinmuth)

IEFILES NRR:DPM:QAB REG. Directors I, II, III, & V PDR HQS CENTRAL FILES JEGagliardo, RIV ASME NBB&PVI 4

-