Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20011A834 + (09:56:47, 21 December 2024)
- ML20011A832 + (09:56:48, 21 December 2024)
- IR 05000546/1981014 + (09:56:49, 21 December 2024)
- ML20011A829 + (09:56:52, 21 December 2024)
- ML20011A827 + (09:56:53, 21 December 2024)
- ML20011A824 + (09:56:54, 21 December 2024)
- ML20011A825 + (09:56:54, 21 December 2024)
- ML20011A823 + (09:56:55, 21 December 2024)
- ML20011A822 + (09:56:56, 21 December 2024)
- 05000321/LER-1981-111-03, /03L-0:on 811003,after Reactor Startup,Discovered Drywell to Torus Delta Pressure 1.5 Psig Not Established within 24-h After Placing Reactor Mode Switch in Run.Caused by Personnel Error & Unavailability of Boiler + (09:56:57, 21 December 2024)
- LD-81-075, Provides Resolution of Six Open Items Identified by NRC During Review of Ser.Items Resolved Include Boron Dilution Alarm,Cold Shutdown Boration & Containment Isolation Valve Power + (09:56:58, 21 December 2024)
- AECM-81-398, Requests Approval of Exception to Staffing Time Guidelines in NUREG-0654,Table B-1.Majority of Personnel Live at Distances from Plant Which Preclude Augmentation of 30- Minute Guideline + (09:57:00, 21 December 2024)
- ML20011A818 + (09:57:01, 21 December 2024)
- ML20011A817 + (09:57:02, 21 December 2024)
- 05000321/LER-1981-111, Forwards LER 81-111/03L-0 + (09:57:03, 21 December 2024)
- ML20011A814 + (09:57:04, 21 December 2024)
- ML20011A813 + (09:57:05, 21 December 2024)
- B10289, Forwards Safety Assessment Rept for SEP Topic IV-2, Reactivity Control Sys Including Functional Design & Protection Against Single Failures + (09:57:07, 21 December 2024)
- ML20011A811 + (09:57:08, 21 December 2024)
- 2CAN108109, Forwards Evaluation of ANO-2 HPSI Pump Operability W/O Water Cooling, Revision 1,per 810715 Commitment + (09:57:09, 21 December 2024)
- 05000335/LER-1981-044, Forwards LER 81-044/03L-0 + (09:57:11, 21 December 2024)
- ML20011A807 + (09:57:13, 21 December 2024)
- 1CAN108111, Forwards Results of Sept 1981 Impingement Monitoring at Intake of Facility,Per ETS 4.1.2.1(2) + (09:57:14, 21 December 2024)
- 05000325/LER-1981-065-03, /03L-0:on 810927,during Plant operation,one-half of Group I Isolation Signal Received Due to Initiation of High Flow Signal from C Main Steamline High Flow Instrument. Cause Undetermined.Replacement Instrument Installed + (09:57:16, 21 December 2024)
- ML20011A804 + (09:57:18, 21 December 2024)
- 05000325/LER-1981-065, Forwards LER 81-065/03L-0 + (09:57:19, 21 December 2024)
- ML20011A801 + (09:57:20, 21 December 2024)
- 05000325/LER-1981-071-03, /03L-0:on 811007,during Plant operation,one-half of Group I Isolation Signal Received Due to Initiation of Low Pressure Signal from B Main Steam Line Low Pressure Instrument.Possibly Caused by Instrument Diaphragm Problem + (09:57:22, 21 December 2024)
- ML20011A799 + (09:57:23, 21 December 2024)
- 05000325/LER-1981-071, Forwards LER 81-071/03L-0 + (09:57:24, 21 December 2024)
- ML20011A796 + (09:57:25, 21 December 2024)
- 05000348/LER-1981-067-03, /03L-0:on 810927,during Operability Test,Diesel Generator 2C Declared Inoperable After Tripping Under Load. Caused by High Crankcase Pressure Due to Scored Cylinder Liner 8 W/Faulty O-ring Allowing Water to Enter + (09:57:26, 21 December 2024)
- ML20011A794 + (09:57:27, 21 December 2024)
- 05000348/LER-1981-067, Forwards LER 81-067/03L-0 + (09:57:29, 21 December 2024)
- ML20011A789 + (09:57:30, 21 December 2024)
- ML20011A791 + (09:57:30, 21 December 2024)
- ML20011A788 + (09:57:31, 21 December 2024)
- ML20011A787 + (09:57:33, 21 December 2024)
- ML20011A786 + (09:57:34, 21 December 2024)
- ML20011A785 + (09:57:35, 21 December 2024)
- ML20011A784 + (09:57:36, 21 December 2024)
- IR 05000054/1981001 + (09:57:37, 21 December 2024)
- ML20011A782 + (09:57:40, 21 December 2024)
- ML20011A781 + (09:57:41, 21 December 2024)
- ML20011A780 + (09:57:47, 21 December 2024)
- ML20011A779 + (09:57:48, 21 December 2024)
- ML20011A778 + (09:57:49, 21 December 2024)
- ML20011A777 + (09:57:50, 21 December 2024)
- ML20011A775 + (09:57:50, 21 December 2024)
- ML20011A774 + (09:57:51, 21 December 2024)
- FVY-81-152, Forwards Yankee Atomic BWR Analysis Methods:Analysis of Typical BWR/4 Turbine Trip W/O Bypass Transients, in Support of Proposed Change 98 + (09:57:53, 21 December 2024)