Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20023A825 + (06:58:11, 21 December 2024)
- ML20023A824 + (06:58:11, 21 December 2024)
- ML20023A822 + (06:58:12, 21 December 2024)
- ML20023A821 + (06:58:13, 21 December 2024)
- ML20023A820 + (06:58:14, 21 December 2024)
- ML20023A819 + (06:58:15, 21 December 2024)
- ML20023A818 + (06:58:16, 21 December 2024)
- ML20023A815 + (06:58:17, 21 December 2024)
- ML20023A817 + (06:58:17, 21 December 2024)
- ML20023A814 + (06:58:18, 21 December 2024)
- ML20023A813 + (06:58:18, 21 December 2024)
- ML20023A811 + (06:58:20, 21 December 2024)
- ML20023A810 + (06:58:21, 21 December 2024)
- ML20023A808 + (06:58:22, 21 December 2024)
- ML20023A807 + (06:58:23, 21 December 2024)
- RBG-13-516, Interim Deficiency Rept DR-39 Re Insufficient Beam End Gaps Between Drywell & Primary Shield Walls.Initially Reported on 820302.Deficiency Determined Reportable Per 10CFR50.55(e).Next Rept Expected by 821108 + (06:58:27, 21 December 2024)
- ML20023A805 + (06:58:29, 21 December 2024)
- ML20023A804 + (06:58:33, 21 December 2024)
- ML20023A803 + (06:58:33, 21 December 2024)
- AECM-82-488, Forwards Evaluation of Valve Disc Pin Overstressing, Addressing Concerns & Closing Supplemental SER 2,Section 22.2 (Issue II.E.4.2), Purge Valve Operability + (06:58:35, 21 December 2024)
- ML20023A802 + (06:58:35, 21 December 2024)
- ML20023A800 + (06:58:37, 21 December 2024)
- ML20023A798 + (06:58:38, 21 December 2024)
- ML20023A797 + (06:58:39, 21 December 2024)
- ML20023A795 + (06:58:40, 21 December 2024)
- ML20023A794 + (06:58:41, 21 December 2024)
- LD-82-081, Provides Preliminary Info as Result of Fuel Insp That Revealed Need to Modify Some Batch C Fuel Assemblies to Provide Addl Space for Axial Growth of Fuel Rods + (06:58:42, 21 December 2024)
- ML20023A792 + (06:58:42, 21 December 2024)
- ML20023A790 + (06:58:44, 21 December 2024)
- ML20023A789 + (06:58:46, 21 December 2024)
- JAFP-82-0125, Forwards Updated Monthly Operating Rept for Jan 1982 + (06:58:47, 21 December 2024)
- ML20023A787 + (06:58:47, 21 December 2024)
- ML20023A783 + (06:58:50, 21 December 2024)
- ML20023A781 + (06:58:51, 21 December 2024)
- ML20023A780 + (06:58:51, 21 December 2024)
- ML20023A778 + (06:58:52, 21 December 2024)
- ML20023A777 + (06:58:53, 21 December 2024)
- ML20023A776 + (06:58:54, 21 December 2024)
- ML20023A774 + (06:58:54, 21 December 2024)
- ML20023A772 + (06:58:55, 21 December 2024)
- ML20023A769 + (06:58:55, 21 December 2024)
- ML20023A768 + (06:58:56, 21 December 2024)
- AECM-82-489, Forwards Outline of in Situ Test for HPCS Standby Svc Water Pump Flow Induced Vibration.Test Will Be Performed Prior to Startup Following First Refueling Outage.Commitment to Conduct Test Resolves SER Suppl 2,Section 3.10 Concerns + (06:58:57, 21 December 2024)
- ML20023A765 + (06:58:58, 21 December 2024)
- ML20023A763 + (06:58:59, 21 December 2024)
- ML20023A760 + (06:59:00, 21 December 2024)
- 05000373/LER-1982-109-03, /03L-0:on 820925,pressure Switches 1E31-N022C & 1E31-N022D Found Out of Tolerance in Nonconservative Direction During Reactor Low Pressure RCIC Isolation Calibr & Functional Test.Caused by Setpoint Drift + (06:59:04, 21 December 2024)
- ML20023A753 + (06:59:05, 21 December 2024)
- PNO-IV-82-037, on 821013,indication of Increasing Reactor Bldg Activity & Decreasing Regeneration Train Pressure Occurred.Caused by Gaseous Radioactivity Leaking from Flanged Line in a Purification Train + (06:59:07, 21 December 2024)
- ML20023A747 + (06:59:08, 21 December 2024)
- 05000267/LER-1982-036-03, /03L-0:on 820908,one of Two Bearing Water Makeup Pumps Removed from Svc.Caused by Need to Rebuild Mechanical Seal Due to Normal Wear.Seal Rebuilt + (06:59:09, 21 December 2024)
- ML20023A743 + (06:59:10, 21 December 2024)