Updated Monthly Operating Rept for Jan 1982
ML20023A792
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/28/1982
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20023A786 List:
References
NUDOCS 8210200024
Download: ML20023A792 (12)


Text

, =.. .

OPERATING DATA REPORT DOCKET NO. 50-999 DATE Februnry 1982 7,i c al COh!PLETED BY (Ede>ju t3840

. TELEPHONE OPERATING STATUS Notes

1. Unit Name: _ FitzFatrick
2. Reporting Period: 820101 - 820191
3. Licenwd Thermal Power (51Wt): 2436
4. Namepfate Rating (Gross 51We): 883
5. Desi;n Electrical Rating (Net 5fWe): . 821
6. Afnimum Dependable Capacity (Gross 51We): 830
7. 5fnimum Dependable Capacity (Net SIWE): 81 n S. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since List Report, Gise Reasons:.
9. Power Lesel To Which Restricted,If Any (Net 51We):
10. Reasons For Restrictions,1f Any:

l This Month YrAo.Date Cumulaiise i

11. Hours In Reporting Period 744 744 57121
12. Number Of Hours Reactor Was Critical 0 0 39551.2
13. Reactor Reserve Shutdown Hours n 0 0
14. Hours Generator On.Line 0 0 3Rh43 6
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 0 78401314
17. Gross Electrical Energy Generated (MWH) 0 0 26760610 IS. Net Electrical Energy Generated (MWH; O O 25ont720
19. Unit Service Factor 05 ne _

67.1%

i 20. Unit Asailability Factor 0% n% 67.3%

21. Unit Capacity Factor (Using MDC Net) 0% og 60.5%
22. Unit Capacity Factor (Using DER Neti of n 55.__2%
23. Unit Forced Outage Rate n a' 0 *' 16 95
24. Shutdowns Scheduled O*er Next 6 Months (Type.Date,and Duration of Each):

NONE

25. If Shut Down At End Of Report Period. Estimated Date of Startup: February 1082
26. Units in Test Stseus (Prior eo Commercial Operation): Forecast Achiesed

, INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIA L OPER ATION 8810 20 002.V [

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE February 1982 C05tPLETED BY E. Zufelt TELEPHONE I915I 142-1840 510NUI January 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (5!We Net) (5tWe Net) 1 0 37 0 2 0 ig 0 3 0 0 39 4 0 20 0 ,

5 0 21 0 6 0 22 0 7 0 23 - 0 8 0 24 0

9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 0 0 14 30 15 0 3, o 16 0 ,

SUMMARY

Fourth refueling and maintenance outage continued through this reporting period.

I e .

UNITSIIUTDOWNS AND POWER REDUCTIONS . DOCKET NO. 50-333 UNIT N AME oAFMPP .

DATE Fe b rtia rir 1962 REPORT MONTil January 1982 COMPl.ETED BY L Zu M t TELEPilONE ( 716 i U4 P- W4 0

e. ~

} e, ' ; u, E e

j%

~

cen5CC Cause & Correceive N. . . Daie M. y ,5 5  ? 53 $$o Auion to g g.3 3 5 3 cc Event Report n n? gO oO E i Di j in U g Prevent Recurrence 6

l 12 811031 S 744 C 1 N/A N/A N/A Refueling outage (cumulative hours to date 2230.7) f I 2 3 4 F: Forced Reason: Method: Exhibit C . Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual .

for Preparation of Data 0 Maintenancr. of Test 2-Manual Scram. Entry Sheets for 1.ieensee C.Refucting 3 Automatic Scram. Event Repori (LE R) Flic (NUREG.

D Regulatory Restriction 4 Other (Explain) 0161)

E Operator Training & 1.ieense Examination F Administrative $

G Operational Error (Explain) Exlubit I Same Source IL Other (Esptain)

e POWER: AUTHORITY OF TRE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR. POWER PLANT

- NARRATIVE

SUMMARY

OF OPERATIONAL EXPERIENCES JANUARY 1982 The refueling and maintenance outage which began,0ctober

- 31, 1981,' continued throughout this reporting period. The major. areas !are TORUS modifications, LLRT testing, turbine generator maintenance, feedwater heater replacement and fire protection modifications. The outage activities are progressing with minimum slippage and the. unit is scheduled to be back

~1n service at the end of February, 1982.

O 9

e M

e o

s k

e

l s  !

)

,10 82 D:ta Ftbrunry JAMES A. FITZPATRICK NUCLEAR POWER PLANT POWER AUT;10RITY OF TiiE STATE OF NEW YORK REFUELING INFORMATION

1. The date of the next scheduled refueling outage is Sentember 19 83 -
2. The scheduled date for restart following refueling is 'Norrmber ,19 83 -
3. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? -

YES X If yes, describe in general what these will be and go to question 5.

- New Minimum Critical Power Ratio operating limits may be required. If new fuel errich-ents are _ introduced, new Muimum Average Planar Linfar Heat Generation I init s will be re_ quired.

NO If no, answer question 4.

4. ANSWER ONLY IF ANSWER TO 3. ABOVE IS NO.

Has the reload fuel design and core configuration been reviewed by the Plant Safety Review committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

YES NO The next scheduled review date is ,19 .

5. ANSWER ONLY IF ANSWER TO 3. ABOVE IS YES. ,_

The scheduled date for submitting proposed licensing action ,and supporting information is Auenst >19 83 -

6. Answer the following im}, tant licensing considerations YES N0 c) New fuel design? X b) New fuel supplier? X c) Are there any new unreviewed design or performance analysis methods? X d) Are there any new operating procedures? __

v o) Other y Specify:

7. There are normally 560 fuel assemblies in the core during operation, presently there cre 560 in the core.
8. n) There are 626 fuel assemblies of the licensed allowable 2244 in the spent fuel pool.

b) An increase in the licensed storage. capacity:

x is not being contemplated at this time.

is not planned at this time for an additional fuel assemblies.

has been requested for an additional fuel assemblies.

9. December 19 89 is the last possible refueling date that can be projected at this time given the presently licensed spent fuel pool storage capacity.

POWER AUTHORITY OF THE STATE OF NEW YORK -

JAMES A. FITZPATRICK NUCLEAR POWER PLANT ,

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

3.

JANUARY 1982 DATE SYSTEM REO EST HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 12/4 02-2 160 OA LLR'd. Seat leaks Repaired as required c160.25 12/21 03 16082 LLRT Loose nut New lock nut installed 101.5 CRD-110 1/2/8? 10 1O LLRT Seat leaks pR 00B/ Valves reworked w/new parts 323 75 701B

  • 1/16 10 15060 .LLRT MOV-18 Seat leaks Repaired under direction of 3936.25 factory rep 1/14 10 15061 LLRT Seat leaks Repaired under direction of 1345.75 MOV-17 factory rep 1/2 10 16086 LLRT Seat leaks Repaired as required -2315.75 MOV-34B -

1/13 10 16092 LLRT Seat leaks Repaired as required 111 RilR-703A 1/16 13 16085 LLRT Seat leaks Repaired as required 244 RCIC-04/05 ,

1/2 27 16072 LLRT Seat leaks New parts /NUREG 0578 171 SOV-123A&B 1/6 27 16073 LLRT Seat leaks New parts /NUREG 0578 -

36 SOV-120A 1/14 27 16074 LLRT Seat leaks

  • Repaired w/new parts 146 SOV-135B -

POWER AUTHORITY OF THE STATE OF NEW YORK '

JAMES A. FITZPATRICK NUCLEAR POWER PLANT -

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

JA.NUARY 1982 .

Dt.. :. SYSTEM WORK REQUEST # HOW DETECTED REPAIR ENT # CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME HOURS ,

12/4 27 16076 LLRT } Seat leaks Repaired as required 100 SOV-125B '

L/14 27 16077 LLRT Seat leaks Repaired as required 144 cV-70 1/2 27 16088 CAD-81 LLRT Seat leaks Repaired as required 83 11/12 39 16 LLRT Seat leaks Repaired as required ,511.75 A /10 12/21 39 16084 LLRT Seat leaks Repaired /new parts 336 BAS-4 & 5 L2/27 13 15999 LLRT Seat leaks Repaired /new parts 48 MOV-16 L2/21 . 27 10407 ,

OPS Seat leaks , ,

, Repaired /new parts , 31 PcV.-122B .,

}

L2/24 10 7938 OPS Stem binding Repaired /new parts 300.5 RHR-45c L/13 02-1 16000 Scheduled None Disassembled for refueling 1506 V-1Rx vessel L/14 27 15083 NUREG 0578 Radiated material Repaired / replaced parts 73.5 SOV-119A & B LLRT Seat leaks .

thru 123A&B .

L/14 03 4 8 Preventative None Installed diaphragm & pilot head 280 n8 maintenance kits

POWER AUTHORITY OF THE STATE OF NEW YORK -

JAMES A. FITZPATRICK NUCLEAR POWER PLANT '

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

JANUARY 1982 DATE SYSTEM WORK REQUEST # HOW DETECTED REPAIR OMPONENT # CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME HOURS .

'l/6 03 6839 OPS Lack of lubrication Disassembled valve, cleaned, -

CRD-109 lubricated, reassembled, packed. 40

l/11 _10 4462 Mod. F1-79-18 Wear on SV-35A - no Cut out valves - tested -

SV-35A, 35B malfunction - SV-35B, reinstalled with welded flanges 246 40 & 44 -

40 or 44

-1/7 10 2354 Preventative P-10 maintenance None Removed & disassembled pump- 160 replaced upper line shaft w/ sleeve: ,

line bearing & sleeve - pump

' bearings, lower shaft coupling &

packing 1/12 10 16095 N/A None Performed LLRT Hydro - 32 AOV-68A satisfactory 12/21 10 4643 -

, MOV-16A OPS Worn packinf; ,,

Repacked 10 1/6 27 72 OP" Sticking

_gg Disassembled, cleaned, 6 reassembled 1/6 27 13071 OPS Suspected ground Disassembled heater block, tested EH-10A heaters - reassembled '

60

l/6 27 8 7 OPS Open heater Replaced heater E - 0B 24 11/16 93 15165 Visual Worn shaft seal Replaced shaft seal 5 Spare fuel oil transfer .,

pump -

E

i. POWER AUTHORITY OF THE STATE OF NEW YORK '

' JAMES A. FITZPATRICK NUCLEAR POWER PLANT

=

- MAINTENANCE

SUMMARY

? T&C .TAMUARY 1982

= --

DATE SYSTEM

  1. E ES # HOW DETECTED 0 T CO NENT MALFUNC ON MALF CI R N H RS 15278 -

Installed new

!./14/82 02 TE-107 A-B JIC RTD's are old None RTD's 30

{

Core spray Calibrated for .

2 16988 sparger work cold water Recalibrated 40

- L/21/82 02 LITS 59A & B OPS Resolder s

, 16501 Preventative None t emocouple 14 I  :./19/82 02-3 T -69 Al JIC maintenance v,

15279 Clean, repair'& Cleaned,

~

L2/30/81 03 HCU LS-129 JIC aa QP$$d ENe 16636 3 No full in Refuel rod Maint to fix, RMCS OPS signal from rod select mode see WR-16591 16 L/27/82 03

,n_iq inonerable h 17149 Clear 4d OPS Pinched wire Ground problem ground problem 1

L2/29/81 03 ncn on_,,

E 17300 . Bro.ke when Broken accum Repaired tjeing light on CRD existing mod & 1 HCU 18-27 OPS

L/2/82 03 rgmnyga m , t ri x 33rne L

17337 Defe tive Indicator Changed JIC reads high resistor 12 P

L/23/82 06 LI-940 resistor E 9412 Seal leak or Intermittent Cleaned &

LPRM-36-05 OPS bad connector downscales performed 19 1/13/82 07

IMP-7.22 E

Seal leak 01, Spiking 150% - Performed 10068 30 "

OPS bad connector IMP-7.22 12 -

1/16/82 07 7,ppy 44_45 ad n s

POWER AUTHORITY OF THE STATE OF NEW YORK -

JA.MES A. FITZPATRICK NUCLEAR POWER PLANT . .

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

J,ANUARY 1982 .

EOUEST #

@ ATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 1/13 93 16152 Preven'tative None Replaced - turbocharger & air , 363 EDG-A maintenance duct thermostatic control valve 0-rings, left & right bank water pumps. Performed generator and breaker PM's. Tuned engine.

O e

9 e

e O

O

'm

4 POWER AUTHORITY OF THE STATE OF NEW YORK

' JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C JANUARY 1982 DATE SYSTEM K E" T #- HOW DETECTED OMPONENT # MALF C ON MAL CTI R R H S

~

leal leak or

"*^"*d ""d 11732 Drifting e d 23 1/13/82 07 LPRM-28-45 OPS aad connection 11924 3eal leak or LPRM reading Performed .

1/10/82 07 LPRM 44-29D OPS 3ad connection high F-IMP-7.22 33 13845 3eal leak or LPRM is 31eaned and 1/13/82 07 LPRM 36/21 OPS bad connection drifting oegormedIMP- 9 14429 Possible bad urifted from -

Performed IMP-LPRM-20-37 OPS letector 43 to 55 in 2 7.22 ,& replaced 24 1/13/82 07 days con Computer not Replaced fuse 16040 receiving sil;na]F2 on LPRM 1/13/82 07 LPHM-04-29 OPS Blown fuse from LPRM card 8 ilepla ed gear 17331 0 SRM B JIC Bad gear box Fuse failures 1/16/82 07 f e 12 Tripping of he ned and 17351. aerf rmed LPRM-12-37 OPS

-)#DY APRM "B" 1/13/82 07 , nnector IMP-7.22 18 15330 Jefective *ill " ' "* "*d "d

" t igh 22 1/7/82 17 RIS-452 B OPS >otentiometer a u Neeule sticks cleaned meter 1/7/82 17 1 56 A OPS Meter sticking at 70-80 CPM and rformed 17157 Meter and Unknown U*0 1/12/82 17 RIS-456 A OPS recorder dif1'er ', p p g dbh

-l h _ _ _ _ _ . _ . . _ _ _ _ . _ . _ - _ . . _ -

. o -

POWER AUTHORITY OF THE STATE OF NEW YORK '

UAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C JANUARY 1982

  1. K" ES ^USE T DATE SYSTEM HOW DETECTED ML Ci T E COMPONENT ] # MALpg ON c;

8551 Out of V1D #" "d*P doenn t go t Performed F-IMP-G14 70

{I 1/11/82 VH-23 OPS calibration t Dirty Recorder double Cleaned, lub.&

17062 carriage tracks at 1st adjusted car. 6 1/8/82 68 TH-102 OPS brake brake 8549 Shunt raeter Meter doesn't Calibrated 1/29/82 71 LPCI INV-B OPS drift read zero meter 16 ,

Broken Tripping at a - Replaced i 17176 temperature load or original switch 1/4/82 93 EDG-A OPS switch 2600 KW with new one 11  !

' Y DP8D " '

9737 Erratic Tightened down 1/17/82 93/71 KV & HZ MR OPS gh readings cover 2 l

l l

l l

1 l

l '

1 .

l