Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20024B128 + (05:35:10, 21 December 2024)
- ML20024B127 + (05:35:12, 21 December 2024)
- ML20024B125 + (05:35:13, 21 December 2024)
- ML20024B124 + (05:35:13, 21 December 2024)
- ML20024B122 + (05:35:15, 21 December 2024)
- ML20024B123 + (05:35:15, 21 December 2024)
- ML20024B121 + (05:35:16, 21 December 2024)
- ML20024B119 + (05:35:17, 21 December 2024)
- ML20024B120 + (05:35:17, 21 December 2024)
- ML20024B118 + (05:35:18, 21 December 2024)
- ML20024B117 + (05:35:19, 21 December 2024)
- ML20024B116 + (05:35:19, 21 December 2024)
- ML20024B113 + (05:35:20, 21 December 2024)
- ML20024B115 + (05:35:20, 21 December 2024)
- ML20024B112 + (05:35:21, 21 December 2024)
- ML20024B111 + (05:35:21, 21 December 2024)
- ML20024B110 + (05:35:22, 21 December 2024)
- ML20024B109 + (05:35:22, 21 December 2024)
- ML20024B108 + (05:35:23, 21 December 2024)
- ML20024B107 + (05:35:23, 21 December 2024)
- IR 05000482/1983002 + (05:35:25, 21 December 2024)
- RBG-15-336, Interim Deficiency Rept DR-92 Re Pyco,Inc & Subsupplier Documentation for Category I Stainless Steel Thermowells. Initially Reported on 830114.Suppliers Not ASME III Quality Sys Certificate Holders.Next Rept by 830817 + (05:35:26, 21 December 2024)
- ML20024B104 + (05:35:28, 21 December 2024)
- ML20024B103 + (05:35:29, 21 December 2024)
- ML20024B099 + (05:35:30, 21 December 2024)
- ML20024B101 + (05:35:30, 21 December 2024)
- RBG-15-339, Interim Deficiency Rept DR-120 Re Improper Storage & Subsequent Deterioration of Four Standby Switchgear Circuit Breakers.Initially Reported on 830527.Investigation Continuing.Interim or Final Rept Will Be Provided by 830803 + (05:35:31, 21 December 2024)
- ML20024B098 + (05:35:31, 21 December 2024)
- ML20024B096 + (05:35:33, 21 December 2024)
- PY-CEI-NRR-0056, Summarizes Status of Concrete Annulus Fill & Containment Radiograph Issues to Permit Continued Const in Annulus Area. Deviation from ASME Code Requirements for Inaccessible Welds Requested + (05:35:34, 21 December 2024)
- ML20024B094 + (05:35:36, 21 December 2024)
- ML20024B093 + (05:35:36, 21 December 2024)
- ML20024B091 + (05:35:44, 21 December 2024)
- ML20024B090 + (05:35:54, 21 December 2024)
- ML20024B089 + (05:35:55, 21 December 2024)
- ML20024B088 + (05:35:55, 21 December 2024)
- ML20024B087 + (05:35:57, 21 December 2024)
- ML20024B085 + (05:35:58, 21 December 2024)
- ML20024B086 + (05:35:58, 21 December 2024)
- ML20024B082 + (05:35:59, 21 December 2024)
- ML20024B083 + (05:35:59, 21 December 2024)
- ML20024B081 + (05:36:00, 21 December 2024)
- ML20024B080 + (05:36:01, 21 December 2024)
- ML20024B078 + (05:36:04, 21 December 2024)
- 05000155/LER-1983-002-03, /03L-0:on 830523,during Routine Calibr of Low Level Trip Sensor Lt 3181,for Reactor Depressurization Sys, Trip Found to Operate Below Tech Spec Setpoint.Cause Not Determined.Transmitter Adjusted + (05:36:08, 21 December 2024)
- ML20024B076 + (05:36:11, 21 December 2024)
- 0CAN068315, Application for Amend to Licenses DPR-51 & NPF-6,revising Tech Specs to Ref Ansi/Asme OM4-1982 Guidelines for Functional Testing,Per safety-related Hydraulic Shock Snubber Operability Requirements + (05:36:12, 21 December 2024)
- ML20024B073 + (05:36:14, 21 December 2024)
- 05000315/LER-1983-052-03, /03L-0:on 830525,axial Flux Difference Target Band Limit Exceeded.Caused by Axial Burnup Distribution,Large Negative Moderator Temp Coefficient & Considerable Rod Withdrawal Required to Overcome Xenon Buildup + (05:36:18, 21 December 2024)
- ML20024B070 + (05:36:22, 21 December 2024)
- 05000304/LER-1983-018-03, /03L-0:on 830527 & 29,steam Generator 2D Steam Flow Channel 2F-533 Observed Spiking Erratically.Caused by Electronic Clock Circuitry in Extractor Out of Alignment. Module Replaced + (05:36:23, 21 December 2024)
- TXX-3997, Advises That Environ Qualification Program for safety- Related Electrical Equipment Will Be Completed Prior to Fuel Load.Util in Compliance w/10CFR50.49 & Committed to Remain So Even Though Design Grandfathered + (05:36:24, 21 December 2024)