Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000327/LER-1981-003-03, /03L-0:on 810105,main Feedwater Flow Channel F-3-35B Failed Low.On 810112 Feedwater Channel F-3-35B & F-3-90B Failed.Caused by Freezing of Inadequately Protected Instrument Sense Lines.Lines Thawed + (17:04:27, 20 December 2024)
- ML20032B350 + (17:04:28, 20 December 2024)
- 05000338/LER-1981-012, Forwards LER 81-012/03L-0 + (17:04:30, 20 December 2024)
- 05000327/LER-1981-003, Forwards LER 81-003/03L-0 + (17:04:32, 20 December 2024)
- 05000369/LER-1981-020, Forwards LER 81-020/03L-0.Detailed Event Analysis Encl + (17:04:35, 20 December 2024)
- ML20032B342 + (17:04:37, 20 December 2024)
- ML20032B341 + (17:04:38, 20 December 2024)
- ML20032B340 + (17:04:39, 20 December 2024)
- ML20032B339 + (17:04:40, 20 December 2024)
- 05000369/LER-1981-021-03, /03L-0:on 810226,noble Gas Activity Monitor for Condenser Evacuation Sys EMF-33 Not Functioning.Caused by Excessive Amounts of Condensation in Sample Lines.Moisture Removed.Different Type of Moisture Separator to Be Used + (17:04:42, 20 December 2024)
- AECM-81-420, Final Deficiency Rept Re Problem of Fire Damper Fusible Link & Retaining Tab Design on Type I Fire Dampers,Initially Reported 810206.American Warming & Ventilating,Inc Has Provided Fusible Link Insp & Installation Procedure + (17:04:44, 20 December 2024)
- ML20032B335 + (17:04:46, 20 December 2024)
- 05000348/LER-1981-014-03, /03L-0:on 810327,turbine Driven Auxiliary Feedwater Pump Inoperable When Pump Speed Could Not Be Increased Above Min Speed.Caused by Design Wiring Error. Wiring Error Corrected & Pump Returned to Svc + (17:04:48, 20 December 2024)
- ML20032B333 + (17:04:49, 20 December 2024)
- ML20032B332 + (17:04:50, 20 December 2024)
- 05000369/LER-1981-021, Forwards LER 81-021/03L-0.Detailed Event Analysis Encl + (17:04:52, 20 December 2024)
- 05000348/LER-1981-013-03, /03L-0:on 810327,rod K-14 Declared Inoperable When Failing to Move While Driving Control Bank a Inward.Caused by Connector Problem on CRDM Circuit for Rod.Connector Reassembled & Proper Rod Operation Verified + (17:04:54, 20 December 2024)
- 05000369/LER-1981-022-03, /03L-0:on 810301-16,various Portions of Fire Detection Sys Inoperable for Periods Exceeding 1-h.Caused by Const in Area.Fire Watches & Patrols Established as Required + (17:04:56, 20 December 2024)
- ML20032B323 + (17:04:58, 20 December 2024)
- ML20032B322 + (17:04:59, 20 December 2024)
- 05000338/LER-1981-005-03, /03L-0:on 810105,discovered That Control Room Floor Sleeve 1FC00108 Was Never Resealed After Being Previously Breached for Cable Installation.Caused by Failure of Personnel to Follow Procedures.Sleeve Resealed + (17:05:00, 20 December 2024)
- 05000321/LER-1981-012-03, /03L-0:on 810228,turbine Failed to Trip on Overspeed.Caused by Dried Lubrication Around Overspeed Tripping Mechanisms Causing Binding.Mechanism Disassembled, Cleaned,Relubricated & Reassembled + (17:05:02, 20 December 2024)
- 05000369/LER-1981-022, Forwards LER 81-022/03L-0 + (17:05:04, 20 December 2024)
- ML20032B317 + (17:05:06, 20 December 2024)
- ML20032B316 + (17:05:10, 20 December 2024)
- 05000338/LER-1981-005, Forwards LER 81-005/03L-0 + (17:05:12, 20 December 2024)
- 05000321/LER-1981-012, Forwards LER 81-012/03L-0 + (17:05:14, 20 December 2024)
- ML20032B311 + (17:05:15, 20 December 2024)
- ML20032B309 + (17:05:16, 20 December 2024)
- 05000321/LER-1980-125, Has Been Cancelled + (17:05:18, 20 December 2024)
- ML20032B307 + (17:05:19, 20 December 2024)
- ML20032B304 + (17:05:21, 20 December 2024)
- ML20032B303 + (17:05:23, 20 December 2024)
- ML20032B302 + (17:05:24, 20 December 2024)
- ML20032B300 + (17:05:25, 20 December 2024)
- 05000369/LER-1981-027-03, /03L-0:on 810306,while in Mode 5,initial Fuel Loading Diesel Generator 1A Inoperable Due to Lack of Cooling Water & Diesel Generator 1B Failed to Start.Caused by Cooling Water Being Isolated for Unrelated Work + (17:05:27, 20 December 2024)
- ML20032B298 + (17:05:28, 20 December 2024)
- 05000366/LER-1981-020-03, /03L-0:on 810311,while Performing HNP-2-3102, Reactor High Pressure Function Test & Calibr,Reactor Pressure Switch 2B21-N018B Actuated at 164 Psig.Caused by Setpoint Drift.Switch Recalibr + (17:05:30, 20 December 2024)
- 05000369/LER-1981-027, Forwards LER 81-027/03L-0.Detailed Event Analysis Encl + (17:05:32, 20 December 2024)
- AECM-81-430, Final Deficiency Rept Re Failure of Test Connection Pipe Off HPCS Injection Line on Containment Side of Injection Valve, Initially Reported on 810527.Testing Specs Revised,Including Vibration Testing Requirements for ECCS Test Connection + (17:05:34, 20 December 2024)
- ML20032B292 + (17:05:36, 20 December 2024)
- ML20032B291 + (17:05:37, 20 December 2024)
- 05000366/LER-1981-020, Forwards LER 81-020/03L-0 + (17:05:39, 20 December 2024)
- 05000369/LER-1981-026-03, /03L-0:on 810305,EMF Sys Panel Alarm in Control Room Indicated Malfunction of EMF-43A.Alarm Could Not Be Cleared & Control Room Outside Air Intake Gaseous Activity Monitor Inoperable.Caused by Broken Bnc Jack + (17:05:41, 20 December 2024)
- ML20032B287 + (17:05:42, 20 December 2024)
- ML20032B286 + (17:05:44, 20 December 2024)
- 05000369/LER-1981-026, Forwards LER 81-026/03L-0.Detailed Event Analysis Encl + (17:05:45, 20 December 2024)
- ML20032B283 + (17:05:47, 20 December 2024)
- 05000369/LER-1981-016-03, /03L-0:on 810216,several Firestops Inadvertently Left Open W/O Fire Watches Being Posted.Caused by Omission of Stops from Maint List of Those Requiring Seals.Stops Sealed.Seals Will Be Verified Every 18 Months + (17:05:49, 20 December 2024)
- ML20032B280 + (17:05:51, 20 December 2024)
- IR 05000333/1981020 + (17:05:52, 20 December 2024)