Forwards IE Insp Rept 70-1151/81-11 on 810810-14 & Notice of Violation
ML20032B311
Person / Time
Site: Westinghouse
Issue date: 09/03/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Damore M
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20032B301 List:
References
NUDOCS 8111050420
Download: ML20032B311 (2)


Text

y'e//ou SEP 3.1981

- Westinghouse Electric Corporation ATTN:. Mr. M. D' Amore, Manager Columbia Plant Nuclear Fuel Division

' Drawer R ColumLia, SC 29205 Gen t.lemen:

Subject:

. Report No. 70-1151/81-11 This refers to the routine -safety inspection conducted by Mr. J. B. Kahle of this office on. August 10-14,1981, _ of activities authorized by NRC License No.

SNM-1107 for the Columbia Fuel Fabrication facility.

Our preliminary findings were discussed with you and members of your staff at the conclusion of the -

inspection.

During the inspection, it was found that certain activities under your license appear to violate NRC requirements.

These items and references to pertir.ent requirements are listed in the Notice of Violation enclosed herewith as Appen-dix A.

Elements to be included in your response are delineated in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this office by telephone within ten days from the date of this letter of your inten-tion to file a request for withholdin", and (b) submit within twenty-five days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been delayed such that less than seven days are available for your review, please notify this office promptly so that a new due date may be established. Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the information wch identifies the document or part thereof sought to be withheld, and a full statement of the reasons on the basis of which it is claimed that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

8111050420 811026 PDRADOCK07001g

i e, '

Westinghouse Electric Corporation 2

Should you have any questions concerning this lettar, we will be glad to discuss them with you.

Sincerely, Paul J. Kellogg, Lhief Reactor Projects Branch 2 Division of Resident and Reactor Project Inspection Eiiciosures:

1.

Appendix A, Notice of Violation 2.

Inspection Report No. 70-1151/81-11 bcc w/ encl:

Document Management Branch State of South Carolina bcc w/o encl:

License Fee Management Branch l

l l

l l

RIIhh RII RII RII RII t^hV W

W I

JBKahle:aw CMHosey AFGibson GPC e1 PJK logg Oj/ f /81 C}/ g /81 t%/ \\/81

((/g,/81

}/p81 l

l l

l