ML20032B280
| ML20032B280 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/19/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20032B281 | List: |
| References | |
| NUDOCS 8111050388 | |
| Download: ML20032B280 (2) | |
See also: IR 05000423/1981011
Text
-
,
.
- - .0CT 19 1981
Docket No. 50-423
.
_
g=s
-
-
~
e
k([pr
Fg 3
Northeast Nuclear Energy Company.
'[k . 9
ATTil: Mr. W. G. Counsil
-
Senior Vice President
fluclear
(
NOVO 4 Jggp, -
Engineering and Operations Group
l --
l
P. O. Box 270
g u.s, %
y
.,
l
Hartford, Connecticut 06101 .
- os
q/
1
i
.
\\
s
l
Gentlemen:
Subject:
Inspection 50-423[85-11
This refers to the routine safety inspection conducted by Mr. J. Mattia of this
office on August 20-31, and September 1-25,1981, at the flillstone Nuclear Power
Station, Unit 3. Waterford, Connecticut, of activities authorized by NRC License
No. CPPR-113 and to the discussions of our findings held by. Mr. Mattia with Mr.
S. Orefice and others of your staff at the conclusion of the inspection.
~^
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of-selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
-
-
'
Based on the results of this inspection, it appears ,that certain of your activi-
ties were not conducted in full compliance with HRC requirements, as set forth
in the Hotice of Violation, enclosed herewith as Appendix A.
These items of
noncompliance have been categorized into the levels described in the. Federal.
Register Hotice (45 FR 66754) dated October-7,.1980. You are required to respond
to this letter and in preparing your response, you should follow the instructions
in Appendix A.
.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this.
l
letter and the enclosures will be.placed in the NRC's Public Document Room.
If
this report contains any information that you (or your contractors) believe to
be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a)
notify this office by telephone within ten (10) days from the date of this
letter of your intention to file.a request for withholding; and (b) submit
within 25 days from the date of this letter a written applicaticn to this office
to withhold such infomation.. Consistent with section 2.790(b)(1), any such
application must be accompanied by an affidavit executed by the owner of the
!
infomation which identifies the document or part sought to be withlmld, and
!
which contains a full statement of the reasons on the basis which it is claimed
l
- n
0$0$bb$ll3
l6
0
"k.M ADR.P.I .
. RIIDR.P I.
.3 7, J.
.
[
ql(-
,
.
..
su-WMattia/cic
Rs sser
Brunner
I
,
.. .
).
..
.
..
..
-
... . .
NRC F ORM 31b (10-00) NRCM O240
y
]
.
.
'
.
Northeast Nuclear Energy Company.
2-
007 1 9 1981
.,
- m
that the information should be withheld from public disclosure. This section
further requires the statement to address with specificity the considerations-
listed in 10 CFR 2.790(b)(4)._ The infonnation sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If we do
not hear from you in this regard within the specified periods-noted above, the
report will be placed in the Public Document Room. The. telephone notification
of your intent to request withholding,-or.any request for an extension of the 10
day period which you believe necessary. should be made to the Supervisor . Files,
Hail and Records, USNRC Region I,.at (215) 337-5223.-
Should you have any questions'concerning this inspection, we will be pleased
to discuss them with you.
-
Sincerely,
.
.
Original Signed By:
Eldon J. Brunner, Chief, Projects
-
Branch fl, Division of Resident
- _
and Project Inspection
.,
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and. Enforcement Inspection
Report Number 50-423/81-11
,
cc w/encis-
K. W. Gray, Ccnstruction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
J. F. Opeka, Vice President, Nuclear Operations
R. T. Laudenat,11anager, Generation Facilities Licensing
D. G. Diedrick, Manager of Quality Assurance
Public Document Room (PDR) -
Local Public Document Room ._PDR)
Nuclear Safety Infomation Center (NSIC)
HRC Resident Inspector
..
State of Connecticut
-
-
.
bcc w/encls:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encls)
~
"'c'>
.......
.
.. .. . .. .
..
. .
.
.
..
.
..
.
..
.
'*"""^"'>
.
.
..
. ..
..... ... . ...
. . . . .
..
. . . . .....
DATEf
..
.
...
. ..
.. . .. .
. ...... ....
. .
...
... . .
.
.
.. ..
...
. ...
.. .. ..
""C'
"" " " ' " " " " " '
OFFICIAL RECORD COPY
-